Information
-
Document No.
-
Audit Title
-
Wates / Greenwich Peninsula
-
Conducted on
-
Prepared by
-
Greenwich Peninsula London
-
All site Team
Inspection check list
Activity: Survey area ready for installation.
-
Check the area is clear of materials and debris.
-
Check structure and finishes are completed and suitable for installation to begin.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
Activity: Installation of staircase.
-
Check the setting out position from grid lines and wall locations.
-
Check the installation against date so on each level.
-
Check the acoustic matting has been installed under and between all supports and staircase elements to avoid direct contact with the slab.
-
Check the undercarriage supports and bracing have been installed in accordance with drawings and good practice.
-
Check the metal bracket has been installed securely with the correct bolts in accordance with drawings.
-
Check the staircase strings have been connected to the brackets with the correct fixings in accordance with drawings.
-
Check the treads and risers have been fitted level and plumb with tight fitting joint and abutments.
-
Check the staircase strings are running parallel to each other and correctly aligned.
-
Check all trims, cover moulds and associated items have been installed and the staircase has been completed.
-
Check all waist material and debris has been removed, disposed of and the area is ready for other trades.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
Activity: installation of protection.
-
Check all necessary protection to treads and risers Tec has been fitted and the item is ready for other works to proceed.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor