Information

  • Document No.

  • Audit Title

  • Wates / Greenwich Peninsula

  • Conducted on

  • Prepared by

  • Greenwich Peninsula London
  • All site Team

Inspection check list

Activity: Survey area ready for installation.

  • Check the area is clear of materials and debris.

  • Check structure and finishes are completed and suitable for installation to begin.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: Installation of staircase.

  • Check the setting out position from grid lines and wall locations.

  • Check the installation against date so on each level.

  • Check the acoustic matting has been installed under and between all supports and staircase elements to avoid direct contact with the slab.

  • Check the undercarriage supports and bracing have been installed in accordance with drawings and good practice.

  • Check the metal bracket has been installed securely with the correct bolts in accordance with drawings.

  • Check the staircase strings have been connected to the brackets with the correct fixings in accordance with drawings.

  • Check the treads and risers have been fitted level and plumb with tight fitting joint and abutments.

  • Check the staircase strings are running parallel to each other and correctly aligned.

  • Check all trims, cover moulds and associated items have been installed and the staircase has been completed.

  • Check all waist material and debris has been removed, disposed of and the area is ready for other trades.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: installation of protection.

  • Check all necessary protection to treads and risers Tec has been fitted and the item is ready for other works to proceed.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.