Title Page
-
Site Name
-
Hub Number
-
Conducted on
-
Prepared by
-
Postcode
-
Trading hours
General Details
-
Is there a R&D Asbestos survey in place?
-
Is Asbestos present within the work zone
-
What is the access like into the shop?
-
Are there any parking restrictions
-
Are there residents above the shop or in close proximity
-
What is the height and width of the entrance doors
-
What is the condition of the shopfront
-
What would be the impact of window graphics if AST’s were to go in the window
-
What is the Condition of the shopfront glazing
Internal details
-
What is the ceiling height?
-
What size ceiling grid is there and what type of ceiling tile
-
Is there a smoke cloak?
-
How many panic alarms are to be disconnected
-
Are there any cameras that may be obstructed by the security screen
-
Is there a CCTV monitor that will be obstructed by the security screen
-
Have you taken Full measurements required of existing kiosk - height, depth, length, gap to Backline
-
Have you taken full measurement any window space and measurements to nearest fixtures
-
Have you measured the sizes of the existing Backline and taken note of its condition
-
Will the existing goal post be adequate to fit new kiosk gate to?
-
Is the fire alarm panel, intruder panel or any fire points impacted within the location of the new proposal?
-
Does the store have any existing AST’s? Note style and details of any existing containment and poles
-
Do the proposed AST’s fit in the proposed location
-
Will the new kiosk door position allow for an 800mm gap for the door to swing
-
Does the store have deliveroo
-
Are there any internal roller shutters that may impact the position of the kiosk or AST’s including any shutter switches
-
Does the store have an under counter safe?
-
Does the store have a lottery unit and scratch card unit?
-
Is it all in working order
-
Does the store have smart cash?
-
Does the store have bottle top removers on the kiosk positions and how many?
-
Details of existing till screens and drawers
-
Is there any other equipment at the kiosk that will need to be repositioned on completion (handsets, bodycams, cctv hubs)
-
Does the store currently have containment above the ceiling
-
Is new hanging signage required above AST location
Back of house
-
What’s the location of the staff welfare
-
What would be the route from the boards for the electricians
-
Does the store have separate IT boards in the office
-
Where are the main DB boards and take photos of location and open the board to take photos of the circuits
-
Take photos of comms cabinet including patch panel and network switch
-
Details of office condition and approximate distance from front line
Additional information
-
Are there any other details in relation to this store that will be helpful
-
Are there any other risks and issues in relation to these works
-
Programme proposal
-
How many nights are required
-
Would early closures or late opening suit this store
-
Are there any nights during the week that are quieter and would be better for the works to take place