Information

  • Document No.

  • Auditor

  • Conducted on

  • Meter Number

  • Serial Number

  • Location

Service Information

  • CT Ratio

  • Rating Factor

  • CT company numbers

  • CT serial numbers

  • IVUE multiplier

  • Service Type

  • Service Voltage

  • Does the service have a CT cabinet?

  • Does the service have a test switch?

  • Is the service using three phase power at the time of audit?

  • Does the billing multiplier match the CT/PT ratio?

  • Service rotation Left to Right, Red/White/Blue

A Phase

  • A phase voltage

  • A phase current

  • A phase expected primary current

  • A phase measured primary current

B Phase

  • B phase voltage

  • B phase current

  • B phase expected primary current

  • B phase measured primary current

C Phase

  • C phase voltage

  • C phase current

  • C phase expected primary current

  • C phase measured primary current

  • Service wiring

  • Meter wiring

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.