Project Name &Number:
-
Location
-
Conducted on
-
Technician
-
Inspection reviewed with?
-
Prepared by:
Soft Tissue Operations Mitigation Program
-
Material handling plan in place. No lifting over 50 Lbs.
-
Material Moving Equipment on site and in use (i.e. carts, dolleys,hoist, wire carts, fork lifts, etc.)
-
Proper lifting procedures addressed on site specific plan and enacted on the field?
-
Repetitive motion tasks addressed and plan in place to prevent injuries?
-
Team members trained on STOMP procedures
-
Supervisor set proper example to address STOMP issues – mechanical aids – Observations.
Personal Protective Equipment
-
Hard hats, safety glasses in use by all personnel
-
Gloves (sharp edges, using knives, handling materials)
-
Proper foot gear and protective clothing. Traffic vest if necessary
-
comments
Administration
-
Safety manual available?
-
Emergency phone numbers posted?
-
Hazard communication program available?
-
Employees trained on GHS ?
-
(SDS) Safety data Sheets manual current?
-
Proper labels on containers?
Medical/Emergency
-
Emergency Action Plan available?
-
First-Aid Kit Available?
-
(BBP) Bloodborne Pathogens control plan available?
-
First-Aid/CPR trained personal onsite
-
Who is responsible for correcting this.
Person
-
- Safety Department
- Third party trainer
- Project Manager
-
What is the time frame to correct this?
-
Incident investigation proecedure in place and forms available
-
Map to medical facility posted
Electrical (General)
-
Adequate lighting
-
Signage present
-
Electrical panels protected
-
Electrical room protected
-
Energized parts protected
-
GFCI's used and functioning properly
-
Safety plates on outlets and J boxes
-
Approved three wire extension cords
-
Ground prongs on cords
-
Cords protected from traffic
Hot Electrical Work
-
Hot Work Permit completed and signed
-
JSA completed
-
All affected employees briefed
-
Back up person trained in emergency<br>procedure
-
Proper level of PPE being used
-
Electrical PPE inspected
-
Insulated gloves tested and up to<br>date
-
JSA steps and procedure being<br>observed
-
Boundaries established and barriers set
-
LOTO procedures being used
-
Components de‐energized
-
Energized parts protected
Ladders & Stairs
-
Safe procedures being followed
-
Safe work distance kept from hazards
-
Ladders inspected
-
Employees not using top two rungs
-
Extension ladders extend 3 feet<br>above landing or secured at top
-
Step ladders in the open position
-
Rope for hoisting present with<br>extension ladders
Fall Protection (29CFR 1926.500's)
-
Fall protection plan (site specific)
-
Employees trained
-
Safety harness, lanyards, and<br>retractable inspected?
-
HLL and vertical life lines inspected<br>and used properly
-
Fall protection being used at 6 feet or higher
-
Harness being worn properly
-
Proper anchorage points used
-
Guardrails present
Scissor & Aerial Lifts
-
Operators following safety<br>procedures
-
Operators trained
-
Equipment/workplace inspections<br>completed and documented
-
Harness and lanyard used in scissor<br>lift
-
Harness and lanyard used in aerial lift
-
Safe work distance kept from<br>elevation changes
-
Operating on a flat surface or rough<br>terrain
-
Gate or chain secured
-
Nothing used to increase height
-
Load ratings observed
Motorized Equipment (Sky Jack, Backhoe etc.)
-
What kind of equipment?
- Scissor Lifts
- Boom Lifts
- Back Hoe
- Mini Excavator
- Telescopic Handler
- Fork lift
-
Operator trained on that particular<br>equipment
-
Name the employees that require training and equipment.
-
what equipment is he operating?
-
When do we need to conduct training?
-
Training documents available
-
Equipment inspections documented
-
Seat belt utilized
-
Back up alarm functioning
-
Brakes in working order
-
Horn functioning
-
Flagman used
Hand & Power Tools
-
Employees trained
-
Proper tool for the job
-
Information label on tool
-
Manufacturer instructions being<br>observed
-
Safe practices being observed
-
Tool in good condition
-
Cord in good condition
-
Double insulated tools used
-
Guards in place
Excavations
-
Competent person present
-
Utilities located and marked
-
Employees trained
-
Daily Inspections documented
-
Surface conditions acceptable
-
Fissures, cracks or shrinkage evident
-
Walls sloped or shored
-
Proper access if is more than 4' deep
-
Access and exits within 25 feet
-
Perimeter protected/barricaded
-
Traffic exposure controlled
-
Top of box 18 inches above ground
-
Spoil 2 feet back from edge
-
Water entering excavation
Housekeeping
-
Clear access to building or site
-
Walkways clear
-
Slip, trip, fall hazards protected and<br>clearly visible
-
Slip, trip, fall hazards eliminated
-
Work platforms clean
-
Materials properly stored
-
Tools and equipment put away after<br>use
Site & Public Protection
-
Public protection signage posted
-
Perimeter fence or barricades<br>installed
-
Traffic control plan in place
-
Adequate lighting provided
-
Technician Signature
-
Comments
-
Safety Signature
-
Address behavioral issues positive and negative – Other general comments – PPE worn – Supervisor set proper example – accidents / near misses reported