Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Work Completion

  • Please describe in detail the work that was completed today.

  • Please record the name of the person at the SCO HD you spoke with.

  • Please insert a few photos, include any faceplates or surface boxes with pabels, patch panel with labels, and any raceway installed.

  • Will a return visit be required?

  • Please describe what will need to be completed and why.

Materials Used

  • Was any Cat5E cabling installed today?

  • Was the cable labeled per the work requested format?

  • Was the cable patched nto a switch port?

  • Please list all cabel and termination materials

  • Was any Conduit or Raceway required for today's work?

  • Please itemize the Conduit or Raceway Materials

  • How much time was required to complete the conduit or raceway work?

Manager Signoff

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.