Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Work Completion
-
Please describe in detail the work that was completed today.
-
Please record the name of the person at the SCO HD you spoke with.
-
Please insert a few photos, include any faceplates or surface boxes with pabels, patch panel with labels, and any raceway installed.
-
Will a return visit be required?
-
Please describe what will need to be completed and why.
Materials Used
-
Was any Cat5E cabling installed today?
-
Was the cable labeled per the work requested format?
-
Was the cable patched nto a switch port?
-
Please list all cabel and termination materials
-
Was any Conduit or Raceway required for today's work?
-
Please itemize the Conduit or Raceway Materials
-
How much time was required to complete the conduit or raceway work?
Manager Signoff
-
Add signature