Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Main Task
- Clean Removal
- Environmental Clean
- Encapsulation
- Waste Handling
- Supervisory
- Ancillary
-
Asbestos Type
- Amosite
- Chrysotile
- Crocidolite
- Actinolite
- Anthophylite
- Tremolite
-
Asbestos Material
- AIB
- Cement
- Insulation
- Textured Coating
- Floor Tiles
- Gaskets & Rope
- Sprayed Coating
-
Priority Visit?
-
Job Notified?
PLANNING & DOCUMENTATION
-
Has the supervisor completed the pre-start checklist?
-
Is there a site information board displaying the site POW, pictorial flow chart and emergency contacts?
-
Is there a copy of the POW including the ASB5, risk assessment and method statement on site?
-
Are the risk assessments suitable, sufficient and relevant to the outside activities?
-
Have they been read and understood and have they been signed?
-
Does the ASB5 match the POW?
-
Is there a copy of the waste carriers licence on site?
-
Is there a copy of the asbestos licence on site?
-
Is a copy of general procedures available on site?
SITE SPECIFIC DETAILS
-
Does the site layout agree with the drawings and photos and include the correct enclosure sizes and locations?
-
Is the supervisor on site the one listed on the POW.
-
Is the scope of works / methodology / material adequately described in the POW?
-
Does the POW detail when the work is to be carried out? (Including start/finish times and weekend variations)
-
Does the POW detail the air monitoring arrangements for the duration of the works?
-
Does the plan detail the person or company providing the 4 stage clearance and to whom they are contracted to?
-
If the POW has been amended, has it bed signed / dated and do other records (eg site diary) shoe the authorisation procedure has been followed?
-
Does the POW or Asbestos Manual detail the type of respirators to be used?
-
Does the POW detail the arrangements for smoke testing and witnessing? Has this been witnessed and by whom?
SUPERVISORS & OPERATIVES
-
Check that the following are in date for each person on site:-<br>1) Asbestos Training, 2) Medical, 3) Face fits
-
Check that the following are in date for each person on site:-<br>1) Asbestos Training, 2) Medical, 3) Face fits
-
Check that the following are in date for each person on site:-<br>1) Asbestos Training, 2) Medical, 3) Face fits
-
Check that the following are in date for each person on site:-<br>1) Asbestos Training, 2) Medical, 3) Face fits
-
Check that the following are in date for each person on site:-<br>1) Asbestos Training, 2) Medical, 3) Face fits
HYGIENE FACILITY AND DECONTAMINATION UNIT (DCU)
-
Is the following documentation available for the DCU?
- Gas installation and safety certificate
- Air clearance certificate
- safety check sheet
- DOP / electrical test certificate
-
Is the DCU connected to the enclosure?
-
Is the outside of the DCU clean?
-
Is the transit procedure in accordance with the POW?
-
Are the DCU legs down and is it level?
-
-
Is the DCU connected to mains water & power?
-
Is the DCU adequately earthed?
-
Is the hose clear and working correctly?
-
Is the waste water from the DCU filtered and discharging to foul sewer?
-
Is the NPU and area underneath clear of dirt and in dry condition?
-
Are there usable warning signs on the external clean & dirty end doors?
-
Are all doors (internal & external) self closing?
-
Have lockers been provided in the clean end?
-
Are there sufficient, working power points in the clean end to charge RPE battery packs?
-
Is there a gas detector fitted?
-
Is there adequate methods of heating the DCU in cold weather?
-
Are there sufficient DCUs / showers for the number of personnel on site? (1 shower : 4 persons)
-
Do the showers have an adequate supply of hot water?
-
Are hooks available in the shower to hang RPE whilst showering?
-
Have the following been provided for the thorough decontamination of the removal personnel?
- liquid soap
- shampoo
- nail brushes
- clean dry towels
-
Are all seals (walls to floor, wall to wall sinks etc) in place?
-
Are the following clear of dust and ingrained dirt?
- doors and door castings
- All vents
- sinks and waste system
-
Are the floors in good condition? Not worn to a level that ingrained dirt cannot be easily removed
-
Does the DCU have an extraction fan fitted with a HEPA filter fitted on the dirty external wall?
-
Has the DCU been set up correctly in accordance with the above?
SITE PREPARATION
-
Has all non-contaminated loose equipment and material been removed from the working area?
-
Have all floor ducts, risers, electrical sockets and other openings been covered and sealed inside the area?
-
Has a supervisor confirmed all openings in plant, pipe, walls and ceilings (including hidden voids) been sealed?
-
Has all electrical plant been isolated or effectively protected from the ingress of water or surfactant materials?
-
Is the correct PPE / RPE being worn during preparation / sheeting?
-
Are all Severn Insulation employees wearing supplied logo clothing? Is it clean? Do they look and act professional?
AIRLOCK / BAGLOCK
-
Does the airlock consist of at least 3 (1x1x2m) compartments with vision panel (600x300mm located in dirty end)?
-
Is the outer flap in place?
-
Are the flaps weighted at the bottom and taped?
-
Do the flaps overlap and cover the openings?
-
Is there a hand-held spray in the dirty end?
-
Is the airlock tidy and free of all dust, dirt and debris?
-
Does the airlock have suitable signage?
-
If a BAGLOCK is being used, does it meet the requirements (as per the airlock above)?
WORK AREA / ENCLOSURE
-
Is the enclosure constructed in accordance with the general procedures (1000 gauge poly; 50mm2 timber or use cleanable surface areas
-
If flame retardant poly is required by the POW, is it being used?
-
Has a clear Perspex inspection / viewing panel (600x300mm) or CCTV been incorporated into the enclosure?
-
Are all parts of the enclosure visible via the panel(s) or CCTV?
-
If any of the work area / enclosures are on carpet, has boarding been used as an overlay?
-
Are there sufficient asbestos warning signs displayed around the area?
PPE
-
Are the removal personnel wearing full overalls, with a hood (type5, cat3)?
-
Are they wearing gloves and Wellington boots?
-
Are the overalls on the outside of their boots?
-
Are the hoods on the outside of their RPE harness strap?
-
If a transit procedure is being operated, are work and transit overalls of a different colour?
-
Are the masks worn as stated on the POW?
-
Are all personnel clean shaven?
-
Is any other PPE required on site and is it being used?
CONTROL MEASURES:- DUST REDUCTION / WET STRIPPING
-
Is the system being used in accordance with that specified in the POW / Asbestos Manual?
-
Is the system set up and working?
-
Are the dust levels being reduced to the lowest practicable levels?
-
Do the results of personal air monitoring indicate that the methods used are effective?
-
Has all equipment been serviced in accordance with the manufacturers schedule? Check service records
-
Are the surfactants / wetting agents only being used on cold surfaces?
-
Are exposure records available on site?
NEGATIVE PRESSURE UNITS (NPU)
-
Does the unit(s) extract from the enclosure at a point far enough away from the airlock enclosure as possible to ensure good air flow through the enclosure without any dead spaces, or is a roving head in place? Is the sufficient negative air?
-
Is the NPU(s) correctly sheeted to the enclosure wall, or if inside, sheeted over including vent or hose?
-
Does the unit(s) vent in the atmosphere outside the building? Or if venting inside, is regular air monitoring being undertaken?
-
Does the pre-filter look to be working effectively?
-
Does the unit(s) have DOP / electrical test certificates?
-
Is the ducting in good condition?
CLASS H VACUUM CLEANERS
-
Is there one in the area near the airlock for decontamination?
-
Are the hoses and electric flex in good condition? No splits or cracks
-
Are the vacuum cleaners working effectively?
-
Has each vacuum got a current DOP / electrical test certificate?
WASTE HANDLING AND DISPOSAL
-
Is there a suitable waste disposal route for the bags with suitable signage?
-
Are the bags marked in accordance with the current legislative requirements?
-
Is the waste double bagged?
-
If the waste is being temporarily stored, is the area labelled and secure?
-
Are the bags filled to an appropriate level?
-
If a skip is being used is it in good condition?, is it lockable?, are suitable signs presents?
-
Does the waste route follow the one on the POW?
TRANSIT PROCEDURES
-
Is transit footwear available and is it stored in clean section of the airlock?
-
Are there sufficient pairs for the number of personnel in the work area?
-
Are the transit coveralls stored in clean end of airlock?
-
Is there signage to show transit route?
-
Does the transit route go over exposed carpeted areas?
-
If the site is occupied (other trades etc) is transit route barrier end off or are personnel accompanied?
AIR MONITORING ARRANGEMENTS
-
Is the company and regime identified in the POW &/or the Asbestos Manual undertaking the air monitoring?
-
Is a visual inspection carried out by the supervisor once the stripping is complete?
COMMUNICATION
-
Is there a suitable system in place to allow easy two-way communication between workers inside the enclosure and those working outside the enclosure?
EMERGENCY PROCEDURES - are they in place / available for :
-
Loss of electric power?
-
Medical emergency inside the enclosure?
-
Failure of the enclosure?
VAN REGISTRATION
-
Has it been air tested within 2 months?
-
Is the out side of the van clean?
-
Are all light lenses present (is it legal)?
-
Is the storage area clean and well ordered?
-
Is there any sign that smoking has taken place inside the vehicle?
ADDITION COMMENTS & CORRECTIVE ACTIONS
-
Auditor
-
supervisor