Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 Physical Apperance

  • 1.1 - Roof and w/p membrane

  • Corrosion free, gutters clean, safe access provided, access ways safe and membrane intact?

  • 1.2 - Roof Plant and Equipment

  • Equipment in good condition, clean and we'll maintained?

  • 1.3 - Roof Access and OHS

  • Roof in safe condition and controlled / safe access provided?

  • 1.4 - Plant room - Main plant room

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.5 - Plant room - Mechanical (pump)

  • Free of leaks, clean, maintained, tidy and paintwork maintained?

  • 1.6 - Plant room - Lift Motor Room

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.7 - Plant room - Individual floors

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.8 - Plant room - Fire

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.9 - Plant room - Electrical

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.10 - Plant room - Hydraulic

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.11 - Plant room - MDF

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.12 - Fire stairs, fire doors and corridors, signage etc.

  • Clear access, lighting, painting, stair pressurisation, door hardware and signage OK?

  • 1.13 - OHS access to plant and equipment

  • Safe access provided, safe working space, warning signs and paint, anchor points, etc.?

  • 1.14 - Risers, equipment cupboards and other shared services areas

  • Free of dust and rubbish, well lit and paintwork maintained?

  • 1.15 - External facade

  • Clean, window seals, paint, crack free and membrane intact?

  • 1.16 - Car park, loading dock, storage area

  • Clean, lighting, painted, auto/ roller doors, signage, hose reels and extinguishers etc.?

  • 1.17 - Cleaners room and chemical storage area

  • Locked, clean, organised, safe chemical storage, bunding, MSDS displayed?

  • 1.18 - Toilets, kitchens and amenities

  • Clean, well lit and paintwork / surfaces maintained?

  • 1.19 - Common area and corridors

  • Clean, well lit and paintwork / surfaces maintained?

  • 1.20 - Any water leaks or seepage

  • Clean and maintained, leaks investigated?

  • 1.21 - Main entry

  • Clean, well lit and paintwork / surfaces maintained?

  • 1.22 - External Grounds

  • Clean, well lit and paintwork / surfaces maintained?

  • 1.23 - Gardens, trees, plants, etc.

  • Clean, maintained, watering system, neat and tidy?

  • 1.24 - Lift lobbies

  • Clean, well lit and paintwork / surfaces maintained?

  • 1.25 - Lift cars

  • Clean, well lit and paintwork / surfaces maintained?

2.0 Management System

  • 2.26 - WHS Management system

  • System in place

  • 2.27 - WHS Management System

  • System up to date in agreed format?

  • 2.28 - Strategic Asset Maintenance Management (SAMM)

  • System in place?

  • 2.29 - Strategic Asset Maintenance Management (SAMM)

  • System up to date in agreed format?

  • 2.30 - Compliance Management System

  • System in place?

  • 2.31 - Compliance Management System

  • System up to date in agreed format?

  • 2.32 - Electronic Access Control Management System

  • System in place

  • 2.33 - Electronic Access Control Management System

  • System up to date in agreed format?

  • 2.34 - Maintenance Management System

  • System in place

  • 2.35 - Maintenance Management System

  • System up to date in agreed format?

  • 2.36 - Fitout Management Plan

  • System in place

  • 2.37 - Fitout Management Plan

  • System up to date in agreed format?

  • 2.38 - Emergency Evacuation Management Plan

  • System in place?

  • 2.39 - Emergency Evacuation Management Plan

  • System up to date in agreed format?

  • 2.40 - Web-Based Helpdesk and Management System

  • System in place

  • 2.41 - Web-Based Helpdesk and Management System

  • System up to date in agreed format?

3.0 - reporting

  • 3.42 - Monthly report

  • Report in place

  • 3.43 - Monthly report

  • Report up to date in agreed format

  • 3.44 - WHS Report

  • Report in place

  • 3.45 - WHS Report

  • Reported items being auctioned and updated in the monthly report

  • 3.46 - Facade Report

  • Report in place

  • 3.47 - Facade Report

  • Reported items being auctioned and updated in the monthly report

  • 3.48 - Indoor Air Quality report

  • Report in place

  • 3.49 - Indoor Air Quality report

  • Reported items being actioned and updated in the monthly report

  • 3.50 - Building Service Calls

  • Calls logged and trended in the monthly report?

  • 3.51 - Building Service Calls

  • Calls update and included in the monthly report?

  • 3.52 - Water Treatment Results

  • Results logged and trended in the monthly report?

  • 3.53 - Water Treatment Results

  • Results updated and included in the monthly report?

  • 3.54 - Fitout Register

  • Register in place?

  • 3.55 - Fitout Register

  • Register up to date in agreed format?

  • 3.56 - Risk Assessment Report

  • Report in place?

  • 3.57 - Risk Assessment Report

  • Reported items being actioned and updated in the monthly report?

  • 3.58 - Compliance Report

  • Report in place?

  • 3.59 - Compliance Report

  • Reported items being actioned and updated in the monthly report?

  • 3.60 - Facilities Management Audit

  • Audit in place?

  • 3.61 - Facilities Management Audit

  • Reported items being actioned and updated in the monthly report?

  • 3.62 - Utility Consumption

  • Consumption tracked and trended?

  • 3.63 - Utility Consumption

  • Consumption updated and included in the monthly report?

4.0 - Site Documentation

  • 4.64 - Asset Register

  • Register in place?

  • 4.65 - Asset Register

  • Register up to date in agreed format?

  • 4.66 - Contractor Contact list

  • List in place

  • 4.67 - Contractor Contact List

  • List up to date in agreed format?

  • 4.68 - Tenant Contact List

  • List in place?

  • 4.69 - Tenant Contact List

  • List up to date in agreed format?

  • 4.70 - Key Register

  • Register in place?

  • 4.71 - Key Register

  • Register up to date in agreed format?

  • 4.72 - Password Register

  • Register in place?

  • 4.73 - Password Register

  • Register up to date in agreed format?

  • 4.74 - Drawing Register

  • Register in place?

  • 4.75 - Drawing Register

  • Register up to date in agreed format?

  • 4.76 - Fire Door Register

  • Register in place?

  • 4.77 - Fire Door Register

  • Register up to date in agreed format?

  • 4.78 - Fire Extinguisher Register

  • Register in place?

  • 4.79 - Fire Extinguisher Register

  • Register up to date in agreed format?

  • 4.80 - Fire Damper Register

  • Register up to date in agreed format?

  • 4.81 - Fire Damper Register

  • Register up to date in agreed format?

  • 4.82 - Emergency Lighting Register

  • Register in place?

  • 4.83 - Emergency Lighting Register

  • Register up to date in agreed format?

  • 4.84 - Dangerous Goods Register

  • Register in place?

  • 4.85 - Dangerous Goods Register

  • Register up to date in agreed format?

  • 4.86 - Hazardous Materials Survey

  • Survey in place?

  • 4.87 - Hazardous Materials Survey

  • Audit up to date in agreed format?

  • 4.88 - Hazardous Materials MSDS

  • MSDS in place?

  • 4.89 - Hazardous Materials MSDS

  • MSDS up to date in agreed format?

  • 4.90 - Monthly Site Audit

  • Audit in place?

  • 4.91 Monthly Site Audit

  • Audit up to date in agreed format?

  • 4.92 - Contract Documentation

  • Scope of works and schedules in place for each contract?

  • 4.93 - Contract Documentation

  • Contracts register up to date and all contracts current?

  • 4.94 - Service Dockets (Mech, Fire, CCTV, Access Control, Lifts, Doors, etc)

  • Dockets in place for each contract?

  • 4.95 - Service Dockets (Mech, Fire, CCTV, Access Control, Lifts, Doors, etc)

  • Dockets up to date in agreed format?

  • 4.96 - Contractor Insurance Documentation

  • Documentation in place?

  • 4.97 - Contractor Insurance Documentation

  • Documents up to date in agreed format?

  • 4.98 - Safe Work Method Statements

  • SWMS in place?

  • 4.99 - Safe Work Method Statements

  • SWMS up to date in agreed format?

  • 4.100 - Tenant condenser Water Register

  • Register in place?

  • 4.101 - Tenant condenser Water Register

  • Register up to date in agreed format?

  • 4.102 - Handover Document

  • Document in place?

  • 4.103 - Handover Document

  • Document up to date in agreed format?

5.0 - Registration / Certification

  • 5.104 - Annual Fire Safety Statement

  • Statement in place and current?

  • 5.105 - Lift / Escalator Registration

  • Registration in place and current?

  • 5.106 - Cooling Tower Registration

  • Registration in place and current ( Not applicable in WA)

  • 5.107 - Pressure Vessel Registration

  • Registration in place and current?

  • 5.108 - Equipment Registration

  • All other registrations in place and current

  • 5.109 - BMU Registration

  • Registration in place and current?

  • 5.110 - Anchor Point Certification

  • Certification in place and current?

  • 5.111 - Trade Waste Agreement

  • Agreement in place and current?

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.