General Site Observations

  • Has Project Information/Road Traffic signage been removed from site?

  • Have Construction Materials been removed from site?

  • Has Site Compound been removed from site?

  • Has Temporary Barricading and Trench covers/Road plates been removed from site?

  • Have Temporary Services been removed & All Affected Services reconnected?

  • Are there any visible Water Leaks (check valves,hydrants,services,meter assemblies,nature strip or roadway?)

Surface Restoration Issues

  • Have affected Nature Strips been Topsoiled & Seeded correctly?

  • Where applicable have all Trees/Garden areas been restored?

  • Has All appropriate Concrete & Asphalt pavement reinstatement been satisfactorily completed?

Surface Fittings

  • Have Old/Disused Fittings been removed (covers,surrounds,posts,road & pole markers?)

  • Have New Covers been set at the correct surface levels?

  • Do New Council Hydrants have appropriate Reflective Markers and/or Posts installed?

  • Are New Hydrant Lugs set between 100mm & 200mm below the Cover Level?

  • Do New Valves have Valve Extension Spindles (where required) & the top of each Spindle is between 100mm & 350mm below the Cover Level?

  • Have Valves been left in an Open position (where required?)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.