Information
-
SHE Leadership Visit Record Title (include project, location, etc.)
-
Document No. VS-HS-HSC-037 Issue 1
-
Conducted on
-
Project
-
Conducted by
-
Work activity
-
Location
-
Personnel / Contractors Visited
Telecommunications Safety Essentials
-
1.1 Does work involve working with electricity?
-
Above the line controls/comments
-
1.2 Can work result in a fall of more than two metres?
-
Above the line controls/comments
-
1.3 Does work require workers to drive longer than two hours?
-
Above the line controls/comments
-
1.4 Are workers required to work in the vicinity of overhead/underground utilities?
-
Above the line controls/comments
-
1.5 Does work involve excavation works or require persons to work in excavations deeper than 1.5m?
-
Above the line controls/comments
-
1.6 Is the worksite in the vicinity of vehicular traffic?
-
Above the line controls/comments
-
1.7 Are workers required to work in or around mobile plant?
-
Above the line controls/comments
-
1.8 Are workers required to work in remote or isolated locations?
-
Above the line controls/comments
-
1.9 Does work involve heavy lifting (>75% safe working limit) using a crane or mobile plant?
-
Above the line controls/comments
-
1.10 Are workers exposed to asbestos?
-
Above the line controls/comments
Environmental Impacts
-
2.1 Noise / air pollution
-
Comments
-
2.2 Fire management
-
Comments
-
2.3 Vehicle wash down
-
Comments
-
2.4 Cultural heritage
-
Comments
-
2.5 Waste management
-
Comments
-
2.6 Erosion and sediment control
-
Comments
-
2.7 Vegetation clearance / reinstatement
-
Comments
-
2.8 Land access
-
Comments
-
2.9 Prescribed waste disposal
-
Comments
-
2.10 Spill management
-
Comments
-
2.11 Fauna / flora
-
Comments
-
2.12 Noxious weeds / insects
-
Comments
Topics Discussed
-
3.1 Is the SHEWMS current and available?
-
Comments
-
3.2 Were workers wearing the appropriate PPE?
-
Comments
-
3.3 Were any significant safety breaches observed?
-
Comments
-
3.4 Is there evidence of the latest Telecommunications safety information being received?
-
Information received / comments
-
3.5 Were safety or environmental topics discussed?
-
Topics discussed / comments
Comments / Corrective Actions
-
Are there any further comments or corrective actions required? (Corrective actions must be assigned to action owner in Cintellate)
-
Comments / corrective actions
Sign-off
-
Person completing visit
-
Select date