Information
-
DA and CC Number
-
Applicant / Client / Owner
-
Conducted on
-
Prepared by
-
Location
Consent Details
-
DA/CDC/CC No.
-
Address
Previous inspections
-
- Footings
- Slab Steel
- Stormwater
- Bearers and Joists
- Wet Area
- Frame
- Final
Onsite Inspection
-
Are there any outstanding items from previous inspections?
-
Are there any environmental controls stated in the development consent installed on site?
-
The following controls have been checked for compliance
- Builders sign
- Sediment and Erosion controls
- Builders Toilet
- Protection of public space by fencing or hoarding
- protection and support of adjoining buildings
- Waterboard stamped plans
-
Is the building under construction consistent with the consent and specifications including any modifications?
-
Have relevant conditions of the consent required to be incorporated in the construction of the building, been implemented
-
Have relevant BASIX commitments been implemented?
Component: Slab / Piers / Strip Footing
-
Do the following components comply with the BCA, Engineers design and/or manufacturer's specifications?
-
Foundation / Bearing Material
-
Foundation Material?
-
Bearing Capacity ?
-
Subfloor drainage ?
-
Piers through into natural founding material (Natural Ground)
-
Consolidation of fill material ?
-
Layout
-
Setbacks ?
-
Heights & levels ?
-
Height of fill, particularly elevated slabs ?
-
Footing dimensions?
-
Steel
-
In accordance with Engineers detail ?
-
In accordance with details provided ?
-
Piers and/or trenches clear of water ?
-
Reinforcement lap ?
-
Steel Cover (cover on chairs, corners, around penetrations) ?
-
Membrane provided?
-
Termite protection and type ?
-
Expansion joints ?
-
Excavation for stormwater / sewer ?
-
Formwork support ?
SUMMARY
-
Result
-
Comments
-
Photos
-
Accredited Certifier
-
Conducted on
-
Signature
-
PO Box 155, Shellharbour City Centre 2529 -Phone 02 4221 6111 -Fax 02 4221 6016 -Email records@shellharbour.nsw.gov.au. -Web www.shellharbour.nsw.gov.au -DX 26402 Shellharbour City Centre