Title Page

  • Site name and number

  • Conducted on

  • Prepared by

  • Principal Contractor

  • Area/Location (Attach Drawing)

  • Drawing No.

Items

Pre-Concrete Check

  • Formation - Line & Level

  • Formation - Condition

  • Blinding - Line & Level

  • Setting Out

  • Reinforcement

  • Formwork, Line & Level

  • Built in items (bolts, starter bars, etc)

  • Joint details incl. waterbars

  • Cleanliness

  • Adequate/safe working areas

  • Temp. Works Design Cert.

  • Permit to Load Signed

  • Pre-Concrete Check Sign Off

Post Concrete Check

  • Min. Strike Time/Cube Strength

  • Line, Level & Plumb

  • Concrete Finish

  • Starter bars - position?

  • Inserts, bolts & joints

  • Defects/Comments

  • Post Concrete Check Sign Off

Final Sign Off

  • Principal Contractor Sign Off

  • Hannafin Contractors Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.