Title Page
-
Site name and number
-
Conducted on
-
Prepared by
-
Principal Contractor
-
Area/Location inc Dwg & Spec ref
-
Method of Placing
-
Concrete Class
Items
Pre-Concrete Check
-
Formation - Line & Level
-
Formation - Condition
-
Blinding - Line & Level
-
Setting Out
-
Reinforcement
-
Formwork - Line & Level
-
Built in items (bolts, starter bars, etc)
-
Joint details incl. waterbars
-
Cleanliness
-
Adequate/Safe Working Areas
-
Temp. Works Design Cert
-
Permit to Load Signed
-
Approval to Pour Concrete Sign Off
Post Concrete Check
-
Min. Strike Time/Cube Strength
-
Line, Level & Plumb
-
Concrete Finish
-
Starter bars - Position
-
Inserts, bolts & joints
-
Defects/Comments
-
Post Concrete Check Sign Off
Authorisations - Sign Off
-
Principal Contractor Sign Off
-
Hannafin Contractors Sign Off