Title Page
-
Project Score
-
Project Name & Number
-
Conducted on
-
Prepared by
-
Site manager
-
Contract Manager
-
Harvey Personnel on site
-
Sub contractor Personnel on site
-
Weather
Site inspection
-
Security and site boundary - access control, defined and secured, public safety
-
Site Access / Building Access (Defined safe access to all areas, all levels, clean, unimpeded, well lit).
-
Site Register (All operatives are signing in and out accurately- daily)
-
Safety Signs (Company Safety Sign, HSE Law Poster, Insurance Certificates, First Aid, Fire Marshal etc.)
-
Housekeeping (Site tidiness, waste bins, minimal flammable waste in buildings).
-
PPE (Company min. requirements met: safety helmet, high-vis vest/coat, safety footwear). Client requirements: above plus eye protection & correct gloves. RPE – face fit tested
-
Site file checked by SHEQ
-
Project Inductions - completed
-
Site file checklist completed by Site Manager
-
CSCS card, SMSTS, First Aid in date as required (Harvey SM, CM, Site Trades)
-
Risk Assessments & Method Statements (MH, Noise, Vibration, Fall Protection, etc). CM, SM and operative sign off completed.
-
Construction Phase Plan - CPP up to date and relevant to works being undertaken
-
Hazardous Substances Safety Data Sheet & COSHH Assessments, safeguards in use, safe/correct storage).
-
Mandatory Inspections (Site Manager Daily checks, H&S Diary, etc. are taking place as required).
-
Plant & Equipment (Test & Inspection Records, SWL, Licensed Operator).
-
Mobile Towers (Correct, straight, undamaged components, correct assembly, double-handrails, toe-boards, stabilisers, scaff-tags, wheels inserted correctly (jubilee clip) and locked in use)
-
Scaffolds (Safe assembly, double-handrails, toe-boards, safe & undamaged ladder or stair access, trap door/gates/corral by ladder, scaff-tags, inspection records, hand-over certificates, pull test, anchors checked, SWL on loading platforms, qualified scaffolders, design calculations on file & TW Register completed where required).
-
MEWP’s: Scissor Lifts/Cherry Pickers (Inspection, correct harness & lanyard selection, trained operator).
-
Podium Steps & Delta Decks (Correct / safe assembly, stabilisers, gates closed & wheels locked).
-
Step Ladders (Justified use, Correct / safe positioning, good condition, contractor’s name).
-
Relevant Permits issued - Working at Height etc.
-
Edge Protection / Fall Protection (Collective & personal fall protection at leading edges & openings, opens with secured cover, including roof work, nets, air bags etc.).
-
Fire Safety & Emergencies (Fire RA & plan, fire points/extinguishers, signage, assembly, Hot Work Permits).
-
Traffic Management (Traffic Plan, signage, traffic calming, vehicle / pedestrian segregation).
-
Noise & Hand Arm Vibration (HAVS) (Hearing protection zones identified and appropriately signed, HAVS monitoring taken place, correct PPE in use, paperwork completed).
-
Waste Management (Segregation, transfer notes, special wastes, etc.).
-
Temporary works / Falsework / Shuttering (Design, Falsework / Formwork Support Structure, detailed on Temporary Works Register, TW Design Brief, TW Appointment & Acceptance letters, etc).
-
Safe Plans of Action (signed by all operatives & foreman, task specific, valid).
-
Lighting (access & egress lighting, emergency escape lighting inc. battery back-up, task lighting).
-
Electrical Safety (PAT Tests, 3 - monthly test certificate, cables tagged & inspected). LOTO
-
Lifting Appliances: Hoists, Cranes, pallet trucks, gin wheels (Record of Test & Inspection, Lifting Plans, Contract Lifts / Competent Personnel)
-
Excavations and Earthworks (Safe access / egress, trench support / batters, edge protection, plant safety, signage, Inspection Records, Excavation Permit, stability of nearby structures, Confined Space?).
-
Tools & Machinery (Tools appropriate to task, correctly guarded, dust extraction, correct PPE/RPE)
-
Manual Handling (Mechanical lifting & moving equipment prioritised, max unit weight for single person less than 25Kg or otherwise if determined by risk assessment).
-
Welfare Facilities (First Aid, canteen, chairs with backs, heating, toilets, hot/cold water, soap, clean, drying room, storage, female sanitary provisions).
-
Special Hazards (Asbestos, Working Near Water, Fragile Roofs).