Title Page

  • Site conducted

  • Date

  • Time

  • Prepared by

  • Location
  • Build Partner

  • Are team directly employeed or subcontractor?

  • Supervisor Name

  • Team Leader Name

  • Team Members Names

Inspection Questions

  • 1.1 - Were you prompted on arrival, to sign onto the teams Daily POWRA?

  • 1.2 - Have all Operatives & Supervisors been briefed & signed onto the POWRA?

  • 1.3 - Have all Operatives & Supervisors received a company induction?

  • 1.4 - Is the Vehicle Pack available & complete, including suitable & relevant RAMS & a copy of the NRSWA Red Book?

  • 1.5 - Is there clear work instructions available on site?

  • 1.6 - Is there an 'Overhead Glove Box Guide' on site for reference?

  • 1.7 - Is all relevant LOLER & PUWER documentation available?

  • 1.8 - Are the Operatives aware of Hot Job procedures & able to identify a hot job?

  • 1.9 - Are all Operatives aware of the latest toolbox talk brief issued by Giganet?

  • 1.10 - Are all utility drawings available (Legible, Full Area, In Colour & In Date)?

  • 2.1 - Do all Supervisors & Operatives hold the mandatory accreditations to carry out all assigned tasks (See Accreditation Matrix)?

  • 2.2 - Do all Supervisors & Operatives hold an in date Smart Award NOPS Card?

  • 2.3 - Has each individual uploaded all mandatory accreditations to their Smart Award NOPS Cards?

  • 2.4 - Do all relevant Operatives hold the required CAT & Genny training (LA001)?

  • 2.5 - Have all Operatives (where required) undergone Face Fit Training & is evidence available?

  • 2.6 - Have the engineers had basic manual handling awareness training within the induction?

  • 2.7 - Does the plant operator hold a CPCS card & full UK driving license?

  • 3.1 - Are all Supervisors & Operatives meeting minimum PPE/RPE requirements (flame retardant where applicable)?

  • 3.2 - Is all task related PPE/RPE available & appropriate for the task (Safety Glasses, Goggles, Ear Defenders etc.)?

  • 3.3 - Is all PPE/RPE in good, working condition?

  • 3.4 - Is all PPE/RPE appropriate for the weather conditions?

  • 3.5 - Are FFP3 Dust Masks available & in use where required?

  • 3.6 - Do both the brand & size of each FFP3 mask match the individuals Face Fit Test Certification?

  • 4.1 - Is the safety QR Code displayed to report any incidents or good catches?

  • 4.2 - Are operatives aware of their nearest first aider is & is there sufficient trained first aiders on site?

  • 4.3 - Are there suitable welfare facilities available (This includes knowledge of nearby public toilets and permission from local businesses/shops or customers)?

  • 4.4 - As a minimum requirement on vehicles are there: hand wipes and blue roll, soap/sanitiser and drinking water?

  • 4.5 - Is there a fully stocked & in date First Aid Kit, with a list of contents & a suitable stock of eye wash pods?

  • 4.6 - Is there an in date fire extinguisher available (gauge needle in the green) & have the operatives been trained to use it?

  • 4.7 - Do all operatives know nearest hospital is & how to get there?

  • 4.8 - Are all supervisors & operatives aware of all emergency & reporting procedures (Inc. Incidents, Accidents, Utility Strikes & Terrorist Attacks)?

  • 5.1 - Are Daily/Weekly plant checks complete?

  • 5.2 - Are the operating manuals & load charts available?

  • 5.3 - Is all plant, machinery, tools & equipment appropriate for the task & free from defects?

  • 5.4 - Do all Operatives know how to report any defects?

  • 5.5 - Is the vehicle fit to work with the road (working beacons, chevrons etc.)?

  • 5.6 - Are all safety decals in place e.g. no smoking signage?

  • 5.7 - Is the bucket in use a toothless type?

  • 5.8 - Are plant safety zones (plant/people interface) in place?

  • 5.9 - Is the trailer fit for purpose & within service date?

  • 5.10 - Does the trailer have 3 slings available?

  • 5.11 - Is the vehicle loaded safely & without exceeding maximum gross weight?

  • 5.12 - Are number plates correct & visible on both vehicles & trailers?

  • 5.13 - Are hand tools insulated where required?

  • 5.14 - Are insulated shovels in good condition with no white showing through protective coating?

  • 5.15 - Is electric powered equipment/tools 110v & PAT Tested?

  • 5.16 - Are all safety guards fitted & free from defects?

  • 6.1 - Are both CAT & Genny within calibration dates?

  • 6.2 - Has the area been thoroughly scanned using both CAT & Genny?

  • 6.3 - Have all known services been marked up with the correct spray paint?

  • 6.4 - Have sufficient trial holes been dug, to expose all known services?

  • 6.5 - Is hand digging being carried out around known utilities?

  • 6.6 - Is spoil being stored appropriately, in a safe & convenient location?

  • 7.1 - Are operatives aware of procedures to safely deal with any sharps found within the work area (Where required, is a sharps box available)?

  • 7.2 - Are weather conditions suitable for excavation works to be taking place?

  • 7.3 - Are all Operatives aware of HAVS/WBVS risks & the control measures required to reduce these risks?

  • 7.4 - If Lone Working, is this approved within the CPP & authorised by relevant management?

  • 7.5 - Are all Operatives aware of Asbestos risks and the correct procedures to follow if suspected or found?

  • 7.6 - Are all Operatives following safe manual handling practices?

  • 7.7 - Are all processes in place to negate the spread of any contagious diseases or illnesses (including COVID-19)?

  • 8.1 - Do all engineers know what to do in the event of an environmental spillage?

  • 8.2 - Are noise levels adequately controlled?

  • 8.3 - Is dust adequately controlled using water suppression?

  • 8.4 - Is there a spill kit, funnel & drip tray available on site?

  • 8.5 - Are all gulleys & drains free from spoil & silt covers used on drain covers?

  • 8.6 - Are excavations of any kind being undertaken within 1m of a trunk?

  • 9.1 - Are all relevant COSHH assessments/data sheets available on site?

  • 9.2 - Are all COSHH clearly & correctly labelled?

  • 9.3 - Are all COSHH stored safely & correctly?

  • 10.1 - Is there suitable supervision on site?

  • 10.2 - Are lighting conditions suitable?

  • 10.3 - Are all vehicles/plant parked both safely & correctly?

  • 10.4 - Are all vehicles, plant, tools, equipment & materials stored securely when not in use?

  • 10.5 - Are storage areas free from hazards & segregated within barriers?

  • 10.6 - Does the site look tidy, managed & safe (check for slips, trips & falls)?

  • 11.1 - Is the site setup in accordance with permit conditions?

  • 11.2 - Are the correct advance warning signs visible when approaching from all sides of the work?

  • 11.3 - Are all other signs in accordance with chapter 8?

  • 11.4 - Are there sufficient cones on site, providing a leading taper (if required) & safety zone?

  • 11.5 - Is the Traffic Management type appropriate & safe for the works?

  • 11.6 - Is the whole area guarded correctly, preventing 3rd party access?

  • 11.7 - Are all relevant permit boards on display (displaying Giganet’s name, with the correct Permit Number)?

  • 11.8 - Is there suitable provision for resident/public access including suitable passing for pushchairs and wheelchairs?

  • 11.9 - Are correct kerb ramps/walkboards in place where required & within suitable condition?

  • 11.10 - Are all barriers linked?

  • 11.11 - Are road plates in place where required?

  • 11.12 - Has all the SLG been weighted with sufficient sandbags, appropriate to weather conditions?

  • 12.1 - Are all relevant permits/authorisations in place & signed by the lead operative?

  • 12.2 - Do all Operatives know how to identify, HP/HV Pipes/Cables/Poles & the procedures for working with or within their vicinity?

  • 12.3 - Do all Operatives know who to call in regard to measuring the distance of HV cables & have access to an ultra-sonic measuring device?

  • 12.4 - Are all Overhead lines (within the vicinity) identified with sufficient control measures, on the POWRA?

  • 12.5 - Do all Operatives understand the procedures around Deep Excavation (No Deep Excavation without permits & authorisations)?

  • 12.6 - Do the works involve Working at Height?

  • 12.6a - Have pre user checks & pre climb risk assessments been completed?

  • 12.6b - Are the correct control measures in place?

  • 12.6c - Is the correct FPE on site & is it being used correctly?

  • 12.6d - Is the relevant TETRA kit on site & is it being used correctly?

  • 142.6e - Do all MEWP operators hold correct accreditations (IPAF)?

  • 12.6f - Is the MEWP being used correctly, parked safely and within LOLER inspection

  • 12.7 - Do the works involve Confined Spaces?

  • 12.7a - Do all relevant supervisors/operatives hold the required training for confined space working (NC2 City & Guilds Medium Risk)?

  • 12.7b - Is a Tripod available (One Per Person)?

  • 12.7c - Is a 2-Way radio available (One Per Person)?

  • 12.7d - Is a Harness & Escape Set available (One Per Person)

  • 12.8 - Do the works involve Lid Lifting, Pits, Chambers, or Hand, Rodding & Roping

  • 12.8a - Do the engineers have the relevant accreditations for the manual handling task (K8 – Hand Rodding and Roping)?

  • 12.8b - Is there relevant lifting equipment on site for the lifting of chamber lids (Cantilever pit keys, roller bars)?

  • 12.8c - Are correct lifting procedures being used?

  • 12.8d - Are pit keys available & in good condition?

  • 12.8e - Can the engineers demonstrate how to complete the manual handling tasks correctly (lifting a chamber lid etc.)?

  • 12.8f - Are the correct cable pulling techniques being adhered to (Hand over hand technique) and Cobra being used?

  • 12.8g - Are water test kits available?

  • 12.8h - Is there a process to report any damage caused/found to pits and chambers?

  • 12.9 - Are the team required to carry Gas Detection Units?

  • 12.9a - Is there a sufficient amount of Gas Detection Units on site (One per person)?

  • 12.9b - Are Gas Detection Units being used correctly and within 6 month calibration date?

  • 12.9c - Are they switched on and positioned correctly to effectively monitor for gases?

  • 12.9d - Are charging facilities available to charge up GDU’s?

  • 12.10 - Are all other risks detailed within the POWRA mitigated using sufficient control measures?

  • 12.10a - Additional Risk (Please Provide Details & an Action to ensure control measures are sufficient)

Positive Observations

  • Please provide detail

  • Additional Positive Observation

  • Additional Positive Observation

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.