Title Page
-
Vessel Name
-
Vessel Type
-
Conducted on
-
Prepared by
-
Location
1 Bridge, Navigation and Communication
-
General View of Bridge Deck
-
Entrance Door with Warning Sign
-
Radars
-
GMDSS Equipment
-
CCTV
-
ECDIS
-
VDR Display
-
VDR
-
Echo Sounder
-
Speed Log
-
Navtex
-
GPS
-
Daylight signal
-
Course recorder
-
Publications (including e-publication)
-
Bridge Console
-
Master’s Standing Order
-
Muster List in Bridge
-
Computers with Cyber Security Sign
-
USB Blocker
-
Electric Equipment Room
-
UPSs for ECDIS
-
Water ingress alarm panel
-
Navigation Light Panel
-
SART with Working Instruction (W.I)
-
2-Way VHF with WI
-
Wing Bridge (STBD)
-
Wing Bridge (STBD) with console & Display
-
Wing Bridge (PORT)
-
Wing Bridge (PORT) with console & Display
-
EPIRB (STBD)
-
EPIRB with VDR
-
Gyro Repeater (STBD)
-
Gyro Repeater (PORT)
-
MOB (STBD)
-
MOB (PORT)
-
Compass Deck
-
Compass Deck VDR Capsule
-
Magnetic compass
-
Radar Mast
-
Battery Room
-
PPE in Battery Room
-
Antenna
-
AED (Automated External Defibrillator) or other place
2 Accommodation
-
General View of Accommodation
-
Entrance of Acc. (Weather Tight Door)
-
Ship’s Officer
-
Loading computer
-
BWTS Control Panel
-
Ballast control console
-
Hospital
-
Bathroom in Hospital
-
Hospital (Hospital Call)
-
Medicine Locker
-
General View of Galley
-
Galley (Anything Specific)
-
Pantry
-
Drinking Water Purifier (Ozone Purifier)
-
Officer’s Mess Room
-
Crew’s Mess Room
-
Dry Provision Store
-
Cold Provision Chamber
-
Cold Provision Chamber (Alarm Test)
-
Entrance of ECR
-
Officer’s Recreation Room
-
Crew’s Recreation Room
-
Documents and Cert. in Recreation RM
-
SOLAS Training Manual
-
Laundry (Common)
-
Laundry (Officer)
-
Gymnasium
-
Air Con. Room (Air Conditioning Plant)
-
Inside of Elevator
-
Certificate, Checklist (Elevator)
-
Safety Plan with Symbol(STBD)
-
Safety Plan with Symbol(PORT)
-
Damage Control Plan
-
Garbage Store
-
Garbage Placard
3 Fire Safety & Life Saving Appliance
-
Fire Control Station
-
International Shore Connection
-
CO2 Release Control Cabinet with Key Box
-
Fire Fighter’s Out Fits
-
EM’CY Shut Off Valve & Control Box
-
CO2 Room
-
CO2 Bottles
-
CO2 Release Control Cabinet in CO2 RM
-
Fire Extinguisher (135L)
-
Fire Hose with Nozzle
-
Muster Station (near Life Boat)
-
Muster Station next to Accommodation
-
LifeBoat
-
Inside of LifeBoat
-
Rescue Boat
-
Painter line for rescue boat
-
Rescue Boat Davit
-
Liferafts (STBD)
-
Ladder for Liferafts (STBD)
-
Liferafts (PORT)
-
Ladder for Liferafts (PORT)
-
Liferafts (Fore Side)
-
Ladder for Liferaft (Fore Side)
-
Life Buoy on Deck
-
Immersion Suit on Deck
4 Ship’s Hull and Deck incl. Structures and Fittings
Hull outside
-
General View of the Vessel (FWD)
-
FWD Draft Mark (STBD)
-
FWD Draft Mark (PORT)
-
Side Shell Plating (STBD)
-
Side Shell Plating (PORT)
-
MID Draft Mark incl. Plimsoll Mark (STBD)
-
MID Draft Mark incl. Plimsoll Mark (PORT)
-
AFT Draft Mark (STBD)
-
AFT Draft Mark (PORT)
-
The Stern of the Vessel
-
Shell Plating with Sunken Eyes (STBD)
-
Shell Plating with Sunken Eyes (PROT)
Main Deck
-
Ship Access(STBD)
-
Ship Access(PORT)
-
Mooring Line Condition (Fore Side, Head)
-
Mooring Line Condition (Fore Side, Breast)
-
Mooring Line Condition (Fore Side, Spring)
-
Mooring Line Condition (AFT Stern)
-
Mooring Line Condition (AFT Breast)
-
Mooring Line Condition (AFT Spring)
-
General View from Compass Deck (FWD)
-
General View from Compass Deck (AFT)
-
General View from Funnel Top (FWD)
-
General View from Funnel Top (AFT)
-
Shore Connections
-
E/R skylight Hatch
-
Oxygen Room
-
Acetylene Room
-
Main Deck (STBD)
-
Main Deck (PORT)
-
Piping Condition on Main Deck
-
Piping Condition on Main Deck
-
Air Vents for Ballast Tank
-
Air Vents for F.O. Tank
-
Bunker Manifold
-
Bunker Manifold Hyd.Test (Date)
-
Mid-Ship Deck Store
-
Heli Deck Equipment
-
SOPEP Equipment Room
-
SOPEP Equipment
-
SANP BACK Zone Marking on Main Deck
-
SANP BACK Zone Marking for Fore Castle
-
Bitts
-
Fairleads
-
Vents for Cargo Hold Scuppers
Fore Castle
-
Paint Store
-
Paints with MSDS & PPE
-
Sprinkler System in Paint Store
-
Bunker Samples with MSDS
-
BSN Store
-
Bitter End (STBD)
-
Bitter End (PORT)
-
Hyd. Power Unit in BSN Store
-
EM’CY Towing Booklet
-
Bilge Well (Alarm Test)
-
Overboard Valve with Warning Sign
-
Water Ingress System
-
Welding or Rigging Equipment in BSN Store
Ballast tank and accessory
-
Ballast access manhole
-
Ballast tanks (If possible or situation) A
-
Ballast tanks (If possible or situation) B
-
Ballast tanks (If possible or situation) C
5 Deck Machinery & Outfitting
-
Windlass (STBD)
-
Windlass The Condition of Chain(STBD)
-
Windlass (PORT)
-
Windlass The Condition of Chain(STBD)
-
Mooring Winches on Fore Castle Deck
-
Mooring Winches on Main Deck (BHP Test)
-
Mooring Winches on Poop Deck
-
Accommodation Ladder Overall (STBD)
-
Accommodation Ladder wire (STBD)
-
Marking on Upper Platform (STBD)
-
Marking on Lower Platform (STBD)
-
Accommodation Ladder Overall (PORT)
-
Accommodation Ladder wire (PORT)
-
Marking on Upper Platform (PORT)
-
Marking on Lower Platform (PORT)
-
F.O. Hose Davit Overall (STBD)
-
F.O. Hose Davit Wire (STBD)
-
F.O. Hose Davit Overall (PORT)
-
F.O. Hose Davit Wire (PORT)
-
Pilot Slant Ladder (STBD)
-
Marking on Upper Platform (STBD)
-
Marking on Lower Platform (STBD)
-
Pilot rope ladder and reel (STBD)
-
Pilot Slant Ladder (PORT)
-
Marking on Upper Platform (PORT)
-
Marking on Lower Platform (PORT)
-
Pilot rope ladder and reel (PORT)
-
Provision Crane (STBD)
-
Provision Crane (PORT)
6 Cargo Space
-
Cargo Hold (if possible)
-
Cargo Hold (if possible)
-
Cargo Hold Coaming
-
Cargo Hold Hatch cover Compression Bar
-
Water Ingress System in Cargo Hold
-
Bilge Well in the Cargo Hold
-
Ladder in the Cargo Hold (if possible)
-
Access Hatch
7 Hatch Covers and other Closing Appliances
-
General View of Heli. Deck
-
Heli. Deck (Marking & Anti-Slip)
-
Portable Ladder for Heli. Deck
-
Underneath of Hatch Cover
-
Underneath of Hatch Cover
-
Underneath of Hatch Cover
-
Hatch Cover Pinion & Rack Piece
-
Hatch Cover Pinion & Rack Piece
-
Hatch Cover Drive Arrangement
-
Hatch Cover Drive Arrangement
-
Hatch Cover Flexi Pad
-
Louver Vent
-
Securing Plate for Hatch Cover
-
Stowage Stopper for Hatch Cover
-
Wheel Lifting Arrangement
-
Cleat Assembly
8 Machinery Space
[Machinery Space - ECR]
-
Engine Control Room (ECR)
-
Engine Control Console
-
Insulation Gloves
-
Black Out & Dead Ship Recovery Procedure
-
Main Switch Board (MSBD)
-
E/R DC 24V. Batt. Charger & Dist. Board
-
Earth Indicator with Alarm Set. (440V)
-
Earth Indicator with Alarm Set. (220V)
[Machinery Space – Engine Room (Upper Deck & 2nd Deck)]
-
Escape Route (Escape Trunk)
-
Economizer wit Soot Blower
-
Main Engine Overall
-
Overhead Crane
-
Incinerator with Cert.
-
Boiler
-
Quick Closing Vale (Test)
-
No Hot Work Mark on the F.O. Tank
-
Work Shop
-
Work Shop (Welding Area)
-
The Condition of Welding Machine
-
Oxy. & Acetylene Welding Equipment
-
Spare Part Store
-
Rigging Equipment
-
Lathe, Grinder, Drilling Machine
-
Fire Shelter in the Work Shop
[Machinery Space – Engine Room (3rd Deck)]
-
Main Engine on 3rd Deck
-
Upper Side of Main Engine
-
Generator Engines
-
Generator Engines (Fuel Leakage Test)
-
Oily Water Separator with Cert.
-
Oily Water Separator (Test)
-
Sewage Collection Tank (Vacuum Toilet)
-
Sewage Treatment Plant with Cert.
-
Purifier Room
-
F.O. Sampling Point (M/E)
-
F.O. Sampling Point (G/E)
-
F.O. Sampling Point (BLR)
-
Water Mist Nozzle in Purifier Room
-
Aux. Air Reservoir (EM’CY Air Reservoir)
-
M/E Local Control Stand with W.I.
-
M/E Fuel Leakage Test (if necessary)
[Machinery Space – Engine Room (Floor Deck)]
-
Main Engine on Floor Deck
-
Condition of Bilge Floor
-
Emergency Suction Valve
-
Emergency Suction Valve (Direct Suction)
-
Bilge Well (FWD) – High Level Alarm
-
Bilge Well (AFT) – High Level Alarm
-
Overboard Valve for Oily Water Separator
-
Escape Trunk
[Machinery Space – Engine Casing incl. Funnel Construction]
-
General View of Funnel
-
Funnel Access with Placard
-
Funnel Damper (Upper 1)
-
Funnel Damper (Upper 2)
-
Funnel Damper (Lower 1)
-
Funnel Damper (Lower 2)
-
Funnel Top
-
Funnels on Funnel Top
[Machinery Space – Engine Casing incl. Funnel Construction]
-
EGCS
-
EGCS (Dampers or Panel)
-
Incinerator W.O Tank
-
Sounding Pipes on Incinerator W.O Tank
-
E/R Fan with Damper (STBD)
-
E/R Fan with Damper (PORT)
-
E/R Fan with Damper (STBD)
-
E/R Fan with Damper (PORT)
[Machinery Space – Steering Gear Room]
-
General View of Steering Gear Room
-
Steering Gear System
-
Gyro Repeater in S/G Room
-
Hyd. Oil Storage Tank for S/G
-
Alarm Test for S/G (if necessary)
-
EM’CY Steering (if necessary)
-
Citadel Equipment
-
Tel. Booth
[Machinery Space – Steering Gear Room]
-
Condition of L.O. Storage
-
Condition of Chemical Storage
-
MSDS and PPE in S/G Room
-
Hyd. Power Unit in S/G RM
-
Water Mist System in S/G RM
-
Suction Valve for Water Mist System
-
EM’CY Fire Pump
-
Bilge Alarm in EM’CY Fire Pump Space
[Machinery Space – EM’CY G/E Room]
-
Emergency Generator
-
Emergency Generator (Operation Test)
-
F.O. Tank with sufficient fuel oil
-
Quick Closing Valve
-
F.O. Tank with sufficient fuel oil
-
Quick Closing Valve
-
Insulation Mat around ESBD
-
Transformer with Warning Sign