Information
-
ME Shot Blast & Finishing Daily Auditing
-
Conducted on
-
Prepared by
-
Document No.
Shot Blast
-
Are there at least 3 wheels running?
-
Add Detail
-
Add media
-
Are there at least 32 amps per wheel?
-
Add Detail
-
Add media
-
Is the blast time set to 2 minutes?
-
Add Detail
-
Add media
Finishing
-
Are the perimeter gauges on the floor in calibration?
-
Add Detail
-
Add media
-
Are straight edges on the floor in calibration? (Check the calibration log and the straight edges)
-
Add Detail
-
Add media
-
Are the feeler gauges in calibration and in good condition?
-
Add Detail
-
Add media
-
Are the Equotip Hardness Testers in calibration? (Check the SPC charts)
-
Add Detail
-
Add media
-
Are proper process sheets displayed and instructions being followed?
-
Add Detail
-
Add media
-
Are there any castings being passed into finished goods that do not meet the Unified Inspection Standards?
-
Add Detail
-
Add media
-
Is scrap being identified with the proper symbols?
-
Add Detail
-
Add media
-
Are deviation and hold tags being used to identify castings for following up?
-
Add Detail
-
Add media
-
Are there any signs of excessive burn in or penetration?
-
Add Detail
-
Add media
-
Are there any concerns from hand grinders, swing grinders or inspectors?
-
Add Detail
-
Add media
-
Any follow up?
-
Add media
-
Signature
-
Date