Information

  • ME Shot Blast & Finishing Daily Auditing

  • Conducted on

  • Prepared by

  • Document No.

Shot Blast

  • Are there at least 3 wheels running?

  • Add Detail

  • Add media

  • Are there at least 32 amps per wheel?

  • Add Detail

  • Add media

  • Is the blast time set to 2 minutes?

  • Add Detail

  • Add media

Finishing

  • Are the perimeter gauges on the floor in calibration?

  • Add Detail

  • Add media

  • Are straight edges on the floor in calibration? (Check the calibration log and the straight edges)

  • Add Detail

  • Add media

  • Are the feeler gauges in calibration and in good condition?

  • Add Detail

  • Add media

  • Are the Equotip Hardness Testers in calibration? (Check the SPC charts)

  • Add Detail

  • Add media

  • Are proper process sheets displayed and instructions being followed?

  • Add Detail

  • Add media

  • Are there any castings being passed into finished goods that do not meet the Unified Inspection Standards?

  • Add Detail

  • Add media

  • Is scrap being identified with the proper symbols?

  • Add Detail

  • Add media

  • Are deviation and hold tags being used to identify castings for following up?

  • Add Detail

  • Add media

  • Are there any signs of excessive burn in or penetration?

  • Add Detail

  • Add media

  • Are there any concerns from hand grinders, swing grinders or inspectors?

  • Add Detail

  • Add media

  • Any follow up?

  • Add media

  • Signature

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.