Information
Handover information
-
Address
-
Select date
-
FBC:
Foreman:
Certifier:
Health:
Wash up
Wash up area
-
All stainless steel at sink is folded - minimal joins
-
Wet edges are around all sink areas
-
Splashbacks / tiles go above the drainage racks
-
Splashbacks / tiles are sealed on top edges
-
All areas (pipes,joins etc) to be sealed at junctions
-
Wash up sink - Large hose is working well with both hot and cold, good pressure and mixer is installed
-
Prep sink - Mixer is working well with both hot and cold and has good pressure
-
Hand basin has water running at correct temperature between 22-48 degrees. Has tap for NSW regulations
-
Sensor tap is installed at hand basin
-
Soap & towel dispenser are up
-
Stainless steel is free of sharp edges
-
Stainless is free of weld marks
-
Silicone is neat and not smudged
-
Overhead shelves are installed as per plans. Top shelf is removable for cleaning
-
Dishwasher is installed and fully accessible if needed
-
Cleaners sink is installed and works well with both hot and cold water, taps are useable
-
Cleaners sink has lift top bench overtop and can hold itself upright
Service Area
Service area
-
Stone is continuos/seamless to counter front and mark free
-
80mm Holes cut in benches for POS & printer (with cable caps)
-
Sufficient power/data points in right position
-
Front cupboards have locks
-
Cupboard doors are hung straight and as per plan
-
Cupboards have adjusted shelving where possible
-
Cupboards are free of internal defects
-
All joinery has 2mm PVC edging
-
Inside joinery is studded wherever screw holes
-
Timber front counter and feature section are defect free
-
Upright fridge is installed and working to temperature
Pass out
Pass out
-
Stone is continuos/seamless to counter front and mark free
-
80mm Hole cut in bench for Production monitor
-
Sufficient power/data points in right position
-
Front cupboards have locks
-
Cupboard doors are hung straight and as per plan
-
Cupboards have adjusted shelving where possible
-
Cupboards are free of internal defects
-
All joinery has 2mm PVC edging
-
Inside joinery is studded wherever screw holes
-
Timber front counter and feature section are defect free
Prep area
Prep area
-
Stainless steel is free of sharp edges
-
All stainless is folded & welded
-
Edges are siliconed in silver silicone
-
Sufficient power points for equipment
-
Cutlery drawer is installed and can be rolled out easily
-
Knife holder is installed
-
Refrigeration is in place and working to temperature
-
Freezer is in place and working to temperature
-
Microwaves are at correct height and frame has been supplied and installed
-
Rice cookers are accessible
-
Tiles and splash backs are installed as per plans, they are finished neatly and edges are sealed
Assembly production area
Assembly / preparation area
-
Equipment installed as per plans
-
Stainless steel is free of sharp edges
-
All stainless is folded & welded
-
Sufficient power points for equipment
-
Taco holders are supplied x 4
-
Stainless steel gloves box is supplied by shop fitter
-
Stainless steel wavy insert is supplied by shop fitter for the tacos
-
Stainless steel cut outs are correct for pan inserts
-
Printer shelf is as per plans
-
Steamers / grill press are installed as per plans
-
Steamers have ventilation area beside in the dividers
-
Hot Bain Marie has cross bars and lid
-
Refrigeration in place and working to temperature, single or double sided 0-4 degrees
-
Cold area has cross bars and lid
-
Chopping boards in place and are removable
-
Compile are as per plans
-
Heat lamps are as per plans and at the correct height
-
Bag holder is installed as per plans
-
Feature iron gate is installed as per plans
Flooring
Flooring
-
All safety flooring is coved
-
Floor waste has been graded
-
Bucket trap provided for floor waste
-
Finish is neat and joins minimal
General
General
-
Fire extinguisher & blanket are up
-
All joinery is of high standard
-
Office area with stereo and amp is installed as per plans
-
Safe is bolted to floor or concrete kicker
-
All siliconed areas are under 5mm
-
All silicone is neat
-
All finishes are as per plans
-
All paint finishes to walls are scuffs, chips & mark free
-
All paint finishes to Ceilings are scuffs, chips & mark free
-
Sprinkler system, air con, emergency lighting installed as per plans
-
Speakers installed as per plans
-
External door has peep hole, hook and lock
-
Are the lights installed as per plans
-
Are the lights on dimmers if in fast casual
-
Who has the key and has the partner paid
Cooking bank
Cooking bank
-
Equipment is installed according to plans
-
Generally all stainless is welded and folded
-
Stainless steel is free of sharp edges
-
Adequate power supplied for equipment
-
Exhaust hood has been installed to cover cooking bank completely including a 150mm overhang
-
Exhaust hood has lights and have tested it works
-
Refrigeration is in place and working to temperature with shelves
-
Cheese cut out as per plans in fridge with lid
-
Heat lamp is installed over top of the nacho shelf
-
Timer is installed in Salamander area
-
Salamander is installed at correct height with shelf underneath
-
Grill is on frame with castors on all legs, front legs to be lockable and pipes to be flexible
-
Grill connected to gas and power
-
Stainless steel shelf above grill as per plans
-
Utensil holder cut out is done beside the grill
-
Cold well is installed and has a separate isolated switch. It has an internal rack and is connected to a tundish
-
Chip holder is installed with scooped insert
-
4 basket rack holders are installed
-
2x chip fryers are installed, cappings are installed on both sides and in the middle
-
Lids are supplied for the fryers
-
Chip dump has timer
-
Chip dump area has the chip bag holders
-
Chip dump has a heat lamp and ticket holder screwed into the shelf front
-
Chip dump has wavy insert for LHS pan
-
Chip dump has perforated scooped insert for RHS pan
-
Chip dump has Bain Marie with stainless steel framing to suit two pans
-
Chip dump and cold well areas both have stainless steel doors with clasps or magnetic closures
Outside kiosk
Outside store/customer area
-
Correct materials & colours are used on each elevation according to schedule
-
Feature cactus area as per plan
-
All stainless skirting is affixed and straight meeting neatly at corners
-
Whole bottom of kiosk is siliconed
-
Colour back glass is clear from defect (no chipping, colour to all 4 edges)
-
Square bar is affixed to glass sheet junctions
-
Gas meter is installed and in accessible position
-
Emergency gas stop button has been installed
-
EDB has been installed as per plans
Store room
Store room
-
WIF or coolroom is running at correct temperature
-
Freezer / coolroom shelving is installed
-
Dry shelving is installed
-
Storeroom is at a cool temperature and ventilation has been installed
-
If outdoor cabling is sealed
-
Flooring sealed if req'd
Signage, graphics and menu boards
3d signage & graphics
-
In correct positions as per plans
-
SAV graphics are affixed correctly free of bubbles
-
Clear glass is in place
-
Are cut straight at edge & siliconed over
-
All 3D signage is correctly affixed and siliconed
-
Logos, graphics are free from any apparent defects i.e chips
-
Illuminated signage is working
-
Guarantee is up & reads correctly
-
Are POS flush and installed
Menu board
-
Panels in correct position
-
Menus are crack or defects free
-
Guarantee is crack or defect free
-
Lightboxes are clean & have no shadow lines or dark spots
Notes
Notes and other comments
Equipment
Equipment
-
RedCat POS System
-
Is it installed?
-
Yvette (head office) 03 95084455 Red Cat 1300 4733882
-
Safe
-
Abate: Christina Abate - 03 93104090
-
Stereo
-
Is it installed?
-
Audio Branding: Paul Gaurdiani - 1300 913 099 or 0421 44 5555
-
Amp
-
Stelatel Communications: Lisa Aspden - 03 9576 5699
-
Freezer Room
-
Bromic: Alex - 0423 201 276 / Shopfitter
-
Upright freezers
-
Are they installed?
-
Mark - Austwide 0418 588 933 - Shamus 0401 254 074 - Mark 03 87863570 Sales@austwiderentals.com
-
Schweppes Fridge
-
Schweppes: Catherine - 0408314652 Helen - 03 95084448
-
Smallwares Pack
-
FSM: Allister - 0419565319 or 03 86452555
-
Largewares Pack
-
FSM: Allister - 0419565319 or 03 86452555