Welcome

  • Mockups
    https://www.dropbox.com/s/aekll09yi0ajbyh/ANU_2012%20A

  • Plans
    https://www.dropbox.com/s/aekll09yi0ajbyh/ANU_2012%20A.pdf

  • Signage Schedule
    https://www.dropbox.com/s/cdfx1bamfmlbfp6/Monash_Clayton%20UNI_SS_2012_Revised%20Option%20-%20shopfront%20staying.pdf

Information

Handover information

  • Address
  • Select date

  • FBC:
    Foreman:
    Certifier:
    Health:

Wash up

Wash up area

  • All stainless steel at sink is folded - minimal joins

  • Wet edges are around all sink areas

  • Splashbacks / tiles go above the drainage racks

  • Splashbacks / tiles are sealed on top edges

  • All areas (pipes,joins etc) to be sealed at junctions

  • Wash up sink - Large hose is working well with both hot and cold, good pressure and mixer is installed

  • Prep sink - Mixer is working well with both hot and cold and has good pressure

  • Hand basin has water running at correct temperature between 22-48 degrees. Has tap for NSW regulations

  • Sensor tap is installed at hand basin

  • Soap & towel dispenser are up

  • Stainless steel is free of sharp edges

  • Stainless is free of weld marks

  • Silicone is neat and not smudged

  • Overhead shelves are installed as per plans. Top shelf is removable for cleaning

  • Dishwasher is installed and fully accessible if needed

  • Cleaners sink is installed and works well with both hot and cold water, taps are useable

  • Cleaners sink has lift top bench overtop and can hold itself upright

Service Area

Service area

  • Stone is continuos/seamless to counter front and mark free

  • 80mm Holes cut in benches for POS & printer (with cable caps)

  • Sufficient power/data points in right position

  • Front cupboards have locks

  • Cupboard doors are hung straight and as per plan

  • Cupboards have adjusted shelving where possible

  • Cupboards are free of internal defects

  • All joinery has 2mm PVC edging

  • Inside joinery is studded wherever screw holes

  • Timber front counter and feature section are defect free

  • Upright fridge is installed and working to temperature

Pass out

Pass out

  • Stone is continuos/seamless to counter front and mark free

  • 80mm Hole cut in bench for Production monitor

  • Sufficient power/data points in right position

  • Front cupboards have locks

  • Cupboard doors are hung straight and as per plan

  • Cupboards have adjusted shelving where possible

  • Cupboards are free of internal defects

  • All joinery has 2mm PVC edging

  • Inside joinery is studded wherever screw holes

  • Timber front counter and feature section are defect free

Prep area

Prep area

  • Stainless steel is free of sharp edges

  • All stainless is folded & welded

  • Edges are siliconed in silver silicone

  • Sufficient power points for equipment

  • Cutlery drawer is installed and can be rolled out easily

  • Knife holder is installed

  • Refrigeration is in place and working to temperature

  • Freezer is in place and working to temperature

  • Microwaves are at correct height and frame has been supplied and installed

  • Rice cookers are accessible

  • Tiles and splash backs are installed as per plans, they are finished neatly and edges are sealed

Assembly production area

Assembly / preparation area

  • Equipment installed as per plans

  • Stainless steel is free of sharp edges

  • All stainless is folded & welded

  • Sufficient power points for equipment

  • Taco holders are supplied x 4

  • Stainless steel gloves box is supplied by shop fitter

  • Stainless steel wavy insert is supplied by shop fitter for the tacos

  • Stainless steel cut outs are correct for pan inserts

  • Printer shelf is as per plans

  • Steamers / grill press are installed as per plans

  • Steamers have ventilation area beside in the dividers

  • Hot Bain Marie has cross bars and lid

  • Refrigeration in place and working to temperature, single or double sided 0-4 degrees

  • Cold area has cross bars and lid

  • Chopping boards in place and are removable

  • Compile are as per plans

  • Heat lamps are as per plans and at the correct height

  • Bag holder is installed as per plans

  • Feature iron gate is installed as per plans

Flooring

Flooring

  • All safety flooring is coved

  • Floor waste has been graded

  • Bucket trap provided for floor waste

  • Finish is neat and joins minimal

General

General

  • Fire extinguisher & blanket are up

  • All joinery is of high standard

  • Office area with stereo and amp is installed as per plans

  • Safe is bolted to floor or concrete kicker

  • All siliconed areas are under 5mm

  • All silicone is neat

  • All finishes are as per plans

  • All paint finishes to walls are scuffs, chips & mark free

  • All paint finishes to Ceilings are scuffs, chips & mark free

  • Sprinkler system, air con, emergency lighting installed as per plans

  • Speakers installed as per plans

  • External door has peep hole, hook and lock

  • Are the lights installed as per plans

  • Are the lights on dimmers if in fast casual

  • Who has the key and has the partner paid

Cooking bank

Cooking bank

  • Equipment is installed according to plans

  • Generally all stainless is welded and folded

  • Stainless steel is free of sharp edges

  • Adequate power supplied for equipment

  • Exhaust hood has been installed to cover cooking bank completely including a 150mm overhang

  • Exhaust hood has lights and have tested it works

  • Refrigeration is in place and working to temperature with shelves

  • Cheese cut out as per plans in fridge with lid

  • Heat lamp is installed over top of the nacho shelf

  • Timer is installed in Salamander area

  • Salamander is installed at correct height with shelf underneath

  • Grill is on frame with castors on all legs, front legs to be lockable and pipes to be flexible

  • Grill connected to gas and power

  • Stainless steel shelf above grill as per plans

  • Utensil holder cut out is done beside the grill

  • Cold well is installed and has a separate isolated switch. It has an internal rack and is connected to a tundish

  • Chip holder is installed with scooped insert

  • 4 basket rack holders are installed

  • 2x chip fryers are installed, cappings are installed on both sides and in the middle

  • Lids are supplied for the fryers

  • Chip dump has timer

  • Chip dump area has the chip bag holders

  • Chip dump has a heat lamp and ticket holder screwed into the shelf front

  • Chip dump has wavy insert for LHS pan

  • Chip dump has perforated scooped insert for RHS pan

  • Chip dump has Bain Marie with stainless steel framing to suit two pans

  • Chip dump and cold well areas both have stainless steel doors with clasps or magnetic closures

Outside kiosk

Outside store/customer area

  • Correct materials & colours are used on each elevation according to schedule

  • Feature cactus area as per plan

  • All stainless skirting is affixed and straight meeting neatly at corners

  • Whole bottom of kiosk is siliconed

  • Colour back glass is clear from defect (no chipping, colour to all 4 edges)

  • Square bar is affixed to glass sheet junctions

  • Gas meter is installed and in accessible position

  • Emergency gas stop button has been installed

  • EDB has been installed as per plans

Store room

Store room

  • WIF or coolroom is running at correct temperature

  • Freezer / coolroom shelving is installed

  • Dry shelving is installed

  • Storeroom is at a cool temperature and ventilation has been installed

  • If outdoor cabling is sealed

  • Flooring sealed if req'd

Signage, graphics and menu boards

3d signage & graphics

  • In correct positions as per plans

  • SAV graphics are affixed correctly free of bubbles

  • Clear glass is in place

  • Are cut straight at edge & siliconed over

  • All 3D signage is correctly affixed and siliconed

  • Logos, graphics are free from any apparent defects i.e chips

  • Illuminated signage is working

  • Guarantee is up & reads correctly

  • Are POS flush and installed

Menu board

  • Panels in correct position

  • Menus are crack or defects free

  • Guarantee is crack or defect free

  • Lightboxes are clean & have no shadow lines or dark spots

Notes

Notes and other comments

Equipment

Equipment

  • RedCat POS System

  • Is it installed?

  • Yvette (head office) 03 95084455 Red Cat 1300 4733882

  • Safe

  • Abate: Christina Abate - 03 93104090

  • Stereo

  • Is it installed?

  • Audio Branding: Paul Gaurdiani - 1300 913 099 or 0421 44 5555

  • Amp

  • Stelatel Communications: Lisa Aspden - 03 9576 5699

  • Freezer Room

  • Bromic: Alex - 0423 201 276 / Shopfitter

  • Upright freezers

  • Are they installed?

  • Mark - Austwide 0418 588 933 - Shamus 0401 254 074 - Mark 03 87863570 Sales@austwiderentals.com

  • Schweppes Fridge

  • Schweppes: Catherine - 0408314652 Helen - 03 95084448

  • Smallwares Pack

  • FSM: Allister - 0419565319 or 03 86452555

  • Largewares Pack

  • FSM: Allister - 0419565319 or 03 86452555

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.