Information
-
Nature of work or inspection
-
Client / Site
-
Conducted on
-
Prepared by
-
Job title/Role
-
Location
-
Personnel
Working Safely
-
ARE YOU AND IN A POSITION OF SAFETY WHEN COMPLETING THIS QUESTIONARE?
-
Do personnel have valid authority to work? <br>(Cards, permits to work, etc)
-
Have operatives been inducted on to the Thameslink project?
-
Are personnel in possession of appropriate licenses
-
Is mentoring in place
-
Is there a Safe System of Work (SSOW) in place?
-
Is the SSOW safe and effective?
-
Do staff understand the method of protection being used?
-
Do staff understand the SSOW
-
Does the worksite include rail mounted vehicle movements or ALO?
-
Are the staff aware of rail vehicle movements and/or ALO requirements?
-
Are operatives aware of works by third parties which may have an impact on their works or safety?
-
Are staff equipped withe the correct PPE, is it being used and is it in a good condition?
-
Is manual handling being undertaken
-
Are the appropriate manual handling techniques being used?
-
Should an alternative methodology have been applied
-
Does the work involve road vehicle movements?
-
Are the operatives aware of the Thameslink guidelines on the control of vehicles as specified by TfL?
Quality of delivery
-
Are the current/correct input documents being used?
-
Are the correct tools for the job being used (calibration, condition, etc)?
-
Are personnel aware of the required standards, procedures and codes of practice?
-
Is it evident that these standards are being met?
-
Are the documents being used by the team controlled?
-
Do the drawings, etc accurately reflect the works being undertaken?<br>(construction status, location, etc)
-
Is appropriate information being provided to others affected?<br>(Construction copies left on site, site diary, handover log, etc)
-
Are appropriate records of the works being kept?<br>Drawings marked up, installation logs, etc
-
Are deficiencies being recorded correctly?
-
Is the standard of construction of good quality
-
Are those involved working well as a team?
Environment
-
Are operatives aware of the Thameslink project Environmental requirements?
-
Is waste material being disposed off in the correct manner?
-
Are all reasonable measures being taken to limit Noise, dust and other items which will impact on the environment?
Closure
Feedback
-
Are there any improvements suggested by the operatives which should be considered?
Actions
-
Action
-
Enter action item
-
By
-
Select date
-
Action
-
Enter action item
-
By
-
Select date
-
Action
-
Enter action item
-
By
-
Select date
-
Action
-
Enter action item
-
By
-
Select date
Visual record
-
Add media
-
Add media
-
Add media
-
Add media