Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Information
-
Planner
- Hal Simpson
- Harold Temple
- Ted Hight
- Ricky Moody
- Barry Russell
- Frank Morgan
- Jeremy Leech
-
Terminal
- Atrium
- Concourse T
- Concourse A
- Concourse B
- Concourse C
- Concourse D
- Concourse E
- Concourse F
-
Specific location
-
Describe task to be accomplished
-
Start date & time
-
End date & time
-
Number of workers
-
Housekeeping plan (trash removal, clean up, person responsible, frequency)
-
Material storage & handling plan
-
Access & hoisting plan
Pre-task questions
-
Does every crew member know how to use assigned tools & equipment?
-
Does this task require special training?
-
Are additional or specialty personnel needed for task?
-
Are additional or specialty tools/materials needed to complete task?
-
Applicable MSDS reviewed?
-
Adequate lighting and access?
-
Does task require shutdown of systems or equipment?
-
Does task have any potential to disrupt DOA or tenant activities?
-
Will weather affect safety or quality of work?
-
Are there occupied spaces adjacent or below?
-
Have shop drawings, contract drawings or as-builds been reviewed?
-
Any discharge of fluids anticipated?
-
Do any other shops need to be notified/involved?
-
Any special permits/procedures required for task?
-
"Buddy" system being used?
-
Crew knows location of fire extinguishers, eyewash, phone?
-
Does task require awkward positions, or heavy/repetitive lifting?
Special conditions
-
Public exposure
-
Traffic control
-
Barricades/signage
-
Confined space entry
-
Chemical exposure
-
Ventilation
-
Electrical hazards
-
Lockout/tagout
-
Hot work
-
Critical lift plan
-
MSDS/Hazcom
-
Fall protection
-
Hand or arm protection
-
Full body protective suit
-
Respirator
-
Hearing protection
-
Eye/face protection
-
Other considerations/PPE
Work activity
-
Activities observed
Activity
-
Activity
-
Hazards identified
-
Preparation
-
Additional information
Personnel
-
Supervisor name & signature
-
Date & time
-
Crew members
Crew member
-
Add signature
-
IF WORK CONDITIONS CHANGE, WORK MUST CEASE, AND A NEW PLAN MUST BE COMPLETED.