Title Page
-
Audit Title
undefined
-
-
-
Conducted on
-
Prepared by
-
Location
Housekeeping
-
-
Material stacked and orderly
-
Debris properly removed (building materials, litter, nails, ect.)
-
Free access/egress maintained
-
Trash cans present in work area
-
Restrooms available near work areas
-
Slip, trip of fall hazards removed
-
Other
Environmental
Personal Protective Equipment
-
Hard hats
-
Safety glasses
-
Substantial footwear
-
Appropriate high visibility
-
Gloves
-
Hearing protection
-
Respirators
-
Face shields
-
Other
Tools
-
-
Adequate guards in place
-
Tools stored properly
-
Right tools for job
-
Tools inspected and properly uses
-
Other
Electrical
-
-
GFCIs used
-
Cords in good condition and protected from traffic
-
Energized parts protected
-
Proper temporary/ task lighting
-
Energy secured, lock out/tag out in place
-
Other
Ladder/Stairs
Fall Protection
-
undefined
- Action
- Safe
- On
- Off
- N/A
-
Fall protection plan signed and understood
-
Predetermined rescue plan in place
-
Fall protection at 4' on walking/working surfaces, ramps and runways
-
Personal fall protection equipment inspected and in a good, working order
-
Guardrail system adequate (floor, wall and roof openings guarded)
-
Anchorage points in place
-
Warning lines in place
-
Overhead protection in place
-
Implement hazards protected
-
Other
Fire Protection/Hot Work
-
-
Fuel in approved containers and stored properly
-
Fire extinguishers charged and inspected
-
Fire extinguishers immediately available near hot work/adequate number on site
-
Hot Work permits completed and posted near hot work areas
-
Combustible materials removed or shielded from hot work areas
-
Appropriate PPE for workers performing welding/torching
-
Other
Framing
Scaffolds
Mechanized Equipment
-
-
Equipment inspected daily and documented prior to use
-
Owners manual on hand and followed
-
Workers trained
-
Safety devices functioning
-
Seat belts used/chain gates closed
-
Back up alarms audible
-
Spotters used when needed
-
Other
Hoisting/Rigging Equipment
Excavation
-
-
Competent person designated and on site
-
Workers trained
-
Proper access/egress
-
Spoil pile at least 2' from edge
-
Excavation checked daily and documented
-
Shore/slope/bench (according to soil type)
-
Points of access present every 25' on excavations over 4'
-
Other
Confined Spaces
Site/Public Protection
-
-
Perimeter fenced or demarcated
-
Public Protection signage
-
Site secured from unauthorized entry
-
Street closure identified/traffic control plan
-
Adequate lighting
-
Falling object protection
-
Other
Administration
-
-
Worker safety orientations completed
-
Required posting of (OSHA 300-A, map to hospitals, emergency contacts, safety bulletin board) posted
-
First aid kit/ eye wash station are readily available
-
Weekly safety safety meeting minutes/attendance roster on file?
-
Weekly site inspection filed and dated
-
SDS on site
-
A site specific safety plan has been prepared for the project
-
A site-specific safety plan has been reviewed by Consultant ( per the Contractor's request
-
Contractor has verified worker training records for work being performed (per the Contractor's request)
-
Other
Follow Up Items
-
-
Other items
-
Other Photos
-
Outstanding defeciencies
-
Pending corrective actions
-
Auditor signature
-
Personnel Signature