Title Page
-
Auditor Name and Position
-
Date and Time of Audit
-
Client Name and Address
-
Add media
-
Job Number
-
Engineers on site
-
Works being carried out
Site Set-Up
-
Have all engineers signed in with the client?
-
Have site inductions taken place and been recorded?
-
Is a permit to work required, has this been filled out and approved by the client?
-
Has the site set-up been agreed with the client? (Including access and egress, working area, position of plant, equipment and materials, waste area and working hours)
-
Is the site segregated using a physical barrier from access to unauthorised persons?
-
Does the site set-up reflect the site plan?
Working Environment
-
Is good housekeeping maintained and waste regularly removed from the area?
-
Is the working area free of slip/trip hazards?
-
Is the temperature in the working area comfortable?
-
Are weather conditions considered suitable for the works being carried out?
-
Is the environment free of excessive noise?
-
Is the environment dust and/or fume free?
Site Welfare
-
Is drinking water available on site?
-
Are washing facilities available on site which are clean and well maintained?
-
Are sufficient toilet facilities available on site which are clean and well maintained?
-
Is there an eating area provided on site for break and dinner times ?
First Aid
-
Is there a trained and competent Siphonic Solutions first aider on site?
-
Are suitable and sufficient first aid supplies provided by Siphonic Solutions and available on site?
-
Do engineers know how to report a first aid incident?
Fire
-
Do all engineers know what action to take in the event of a fire or fire alarm activation?
-
Are escape routes clear of obstructions and emergency exits not blocked?
-
Do engineers have access to fire extinguishing media?
COSHH
-
Do all substances on site have suitable and sufficient COSHH assessments available?
-
Do all substances on site have the relevant MSDS available?
-
Are COSHH assessments and MSDS being followed?
-
Are engineers trained and competent to use COSHH items on site?
-
Are COSHH items on site being used correctly?
PPE and Uniform
-
Are all engineers in full uniform provided by Siphonic Solutions?
-
Is the correct PPE provided as per the risk assessment/method statement?
-
Are all persons required to use PPE trained and competent in its use?
-
Is PPE being used correctly where required?
Risk Assessment / Method Statement
-
Has a risk assessment been carried out for all tasks on site?
-
Is the risk assessment being followed?
-
Has a method statement been carried out for all tasks on site?
-
Is the method statement being followed?
-
Is the generic risk assessment and method statement reviewed on site to identify site specific hazards?
Safety Equipment
-
Do all engineers have suitable and sufficient safety equipment required for the task?
-
Does all safety equipment have a Nano tag and holder attached detailing the asset ID number and next inspection date? (Please detail asset number, re-inspection date nd engineer name for each piece of safety equipment)
-
Is all safety equipment logged on the Safety equipment log?
-
Is all safety equipment in date and inspected?
-
Are suitable and sufficient pre-checks carried out and documented on safety equipment before use? (Ask the engineer to carry out a demonstration of a pre-use check)
Access Equipment
-
What type of access equipment is being use on site?
-
Are all engineers on site trained and competent to use the access equipment provided?
-
Is the access equipment positioned correctly?
-
Is the access equipment segregated to deny access to unauthorised persons?
-
Is there documented service and maintenance records for the access equipment on site?
-
Has a pre-use check been carried out on the access equipment and documented?
-
Is the access equipment being used safely in compliance with training and manufacturers instructions?
Working at Height
-
Are all engineers trained and competent in working at height?
-
Have all engineers completed a Health and Medical questionnaire detailing any conditions which may affect their ability to work at height?
-
Are skylight protection panels being used where required?
-
Is there an in date safety line system present on site / have safe alternatives been implemented? (Insert expiry date of safety line system)
-
Have the engineers on site carried out a suitable and sufficient pre-use check of the safety line system? (Ask the engineer to carry out a demonstration of a pre-use check)
-
Are engineers attached to the safety line system at all times?
-
Is adequate edge protection provided on open edges?
Work Equipment and Tools
-
Are all equipment and tools necessary to carry out the task provided?
-
Have engineers carried out a pre-use check on the equipment and tools they are using for the task and declared them fit for use? (Ask the engineer to carry out a demonstration of a pre-use check)
-
Are all equipment and tools serviced and maintained on a regular basis?
-
Is all portable electrical equipment in good condition, portable appliance tested (PAT) and labelled?
-
Are safe working methods in place for tools and equipment which produce high levels of vibration or noise? (Noise above 80db for daily exposure / 135db for peak exposure) (Vibration 2.5m/s2 / 100 points where precautionary methods need to be put in place / 5mm/s2 / 400 points per day maximum)
-
Can all work equipment, tools and materials be transported to and from the working area safely?
Vehicle and Contents
-
Does the vehicle have the following equipment: 1 x Anemometer,1 x Fully Stocked First Aid Kit,1 x Powder Fire Extinguisher, 1 x Box Nitrile Gloves, 1 x Box FFP3 Respirators, 2 x Type 5/6 Coverall?
-
Has a vehicle checklist been completed and submitted by the assigned user?
-
Is the vehicle clean, tidy and in good general condition?
Previous Audits
-
Have all outstanding actions from previous audits been completed?
-
Has the audit score improved since the previous audit?
-
Additional Comments
Audit Sign off
-
Doncaster Maintenance Site Supervisor Signature
-
Auditor Signature
-
Date and Time of Audit completion