Information

  • Document No.

  • Report Title

  • Client / Site

  • Conducted on

  • Project Team Members:

1. Pre-Installation Admin

  • Facility Name:

  • Actual Project Address:

  • Additional Directions if needed:

  • Machine Type:

  • Optional items:

  • Machine S/N:

  • Project Number:

  • Inspection W/O #:

  • Date of Inspection:

  • Inspection type:

  • Site Status:

  • Has the hospital administration been notified of the proposed date of the equipment delivery?

  • Have the authorities been informed where public areas may be used for equipment delivery / access?

  • Any other considerations or comments on the above?

2. Access to site / Off-loading

  • Is the off loading area clear?

  • Will it be clear on the date of delivery?

  • What size is the off loading area?

  • Picture of staging area if applicable:

  • Is the off loading area flat and at the same height as the entrance to the hospital building?

  • Will arrangements be made for a shallow gradient ramp or leveled area to allow easier access of the equipment?

  • When will it be ready?

  • What is being used to offload truck?

  • Does the forklift have enough space to maneuver, allowing for the area that crates will take up when unloaded? (Approx 3,800 sq. ft)

  • Did the Riggers visit the site for evaluation?

  • Does the above have a SWL of 850 kg/m2?

  • Is there enough truck parking space?

  • Is the unloading area clean and clear?

  • Has provisions been made to prevent dust and debris getting into the hospital and onto the equipment?

  • When will be ready?

  • Any obstacle in rigging or staging path require protection?

  • Are there any gradients on the access route into the hospital building?

  • What is the gradient of the slope?

  • Have arrangements been made for a rigging company to be available for the first two days of the installation?

  • How many people?

  • Have they had experience installing Linacs in the past year?

  • Does the delivery meet guidelines for a "Standard Delivery"?

  • Has rigging company site visit been scheduled?

  • What date will rigging company site visit take place?

  • Any other considerations or comments on the above?

3. Access to Treatment Room

  • All floors must support a load of 2 tones. (a point load of 850 kg) Can the floor withstand this load?

  • Have arrangements been made to correct this?

  • Is the minimum clear height on the access route to the treatment room higher than 2015mm?

  • Is the minimum clear width on the access route to the treatment room wider than 1150mm

  • Are there any tight corners to be negotiated?

  • Can the beam arm and gantry drum make the turn around the corner?

  • Is it necessary to remove any door frames?

  • Have arrangements been made for this work to be done?

  • Do any floor ducts or floor finishes require protection?

  • Have arrangements been made for this work to be done?

  • Are there any gradients on the route to, or inside the treatment room?

  • What are the gradients?

  • Is the ceiling height behind the fascia wall > 2.75 m to allow for Linac assembly? (This includes sprinkler heads, vents, lights, etc)

  • Has the access route been cleared of debris and swept clean?

  • Any other considerations or comments on the above?

4. Precise Table Pit

  • Has the Precise Table Pit been constructed?

  • Does it meet the specifications on Elekta drawings?

  • Is the Sismic zone?

  • Has figure 1 been filled out completely?

  • Pit / duct layout:

    Image 1.jpg
  • Pit depth from finished floor: (230mm +/-2mm)

  • Pit internal width 1400mm :

  • Pit internal length 1530mm :

  • Has figure 2 been filled out completely?

  • SISMIC PIT.jpg
  • A - 1800mm

  • B - 2300mm

  • C - 200mm

  • D - 1000mm

  • E - 1060mm

  • F - 360mm

  • G - 280mm

  • H - 1730 mm

  • I - 250mm

  • Has figure 1 been filled out completely?

  • Pit / duct layout:

    Image 1.jpg
  • Pit depth from finished floor: (230mm +/-2mm)

  • Pit internal width 1400mm :

  • Pit internal length 1530mm :

  • Has figure 2 been filled out completely?

  • SISMIC PITchannel.jpg
  • A - 1800mm

  • B - 2300mm

  • C - 200mm

  • D - 1000mm

  • E - 1060mm

  • F - 360mm

  • G - 280mm

  • H - 1730mm

  • I - 1510mm

  • Are the mild steel angle frames (pit edging) that surround the Precise Table Pit (5 x 5 x 0.6) cm size and anchored into the concrete?

  • Isocenter to the lower wall (>3,30m):

  • Any other considerations or comments on the above?

5. Treatment Room

  • Has the concrete been poured?

  • All new concrete must have test cylinders poured and tested. Elekta requires copies of the test cylinder reports confirming concrete meets or exceeds our min. spec of 4500 psi compressive strength. If existing concrete to be used for any anchors, a core sample must be taken and tested confirming existing concrete meets or exceeds our min. spec of 4500psi comps dive strength. This report must be received by Elekta by the final site inspection date.

  • Has a copy of the concrete test results been received by Elekta?

  • What was the break test value shown on test results?

  • Was the concrete poured monolithic with no topping leveling layer?

  • How thick is the concrete slab under the table pit?

  • How thick is the concrete slab under the Base Gantry?

  • Signature of General Contractor Representative affirming constructed I/A/W Elekta requirements:

  • Does the concrete floor below the Linac, around the table pit, and in the floor of the table pit meet levelness spec as indicated on sheet S1 of Elekta drawings?

  • Has the final floor been laid?

  • When will this be done?

  • If the final floor finish is not laid then the concrete floor must be sealed to reduce dust, has this been done?

  • When will this be done?

  • Have arrangements been made to protect the floor?

  • Has the wall covering been added?

  • Is ceiling finished?

  • When will this be done?

  • What lifting facilities are available ?

  • Is the long axis of the beam parallel and vertically above the front/rear<br>axis (G-T axis) of the table pit (1.90m in front and 4m behind of<br>isocenter)?

  • What is the distance between the floor level and the floor ceiling level? (Mín 2600 to allow the hook can be raised when using the I-Beam)

  • Have all parts of the lifting system been load tested to 2.2 tons Safe Working Load?

  • Has a copy of the certificate been sent to Elekta?

  • When will this be done?

  • Is a 3.3 ton (static load) chain hoist and trolley available?

  • Are installed the anchor embedded on the slab roof according to the SPG?

  • Are the cable ducts finished?

  • Are they clear of debris and clean?

  • Have the laser recess (side & sagittal) been constructed to correct size and location in reference to isocenter? (L x W x AFF)

  • What size is the LINAC ducts between the treatment room and the control room?

  • What is the measured distance from control room floor box to Linac equip rm floor box?

  • Does the ducting meet the requirements on Elekta site planning drawing?

  • Are the conduits between the treatment room and the control room dry and clear for pulling cables?

  • Are pull strings installed in the duct / conduits between the treatment room and the control area?

  • Is the treatment room fascia wall constructed?

  • What is the height of the opening? (2540mm)

  • What is the width of the opening? (4000mm)

  • Distance of fascia wall from isocenter? A/B (1220mm)

  • Is the opening of the fascia wall centered on the G-T line of isocenter?

  • Has a space been left to allow the chain hoist on the I-Beam to pass?

  • How wide is it?

  • Is the 3-phase circuit breaker in position?

  • Is the circuit breaker (Electrical box) installed 1.80m to the right far away from isocenter?

  • Is power supplied to the above circuit breaker(s)?

  • Has the electrician checked for proper phase rotation? (CW)

  • is the Stabilizer/ UPS was purchased (by customer or Elekta) ?

  • Is the Stabilizer / UPS on the site?

  • Is the voltage stabilizer running, calibrated and connected to the 380v Linac power supply?

  • What are the following voltage measurements? (Required at time of final site verification)

  • Phase 1 voltage - maximum:

  • Phase 2 voltage - maximum:

  • Phase 3 voltage - maximum:

  • Single Phase voltage - maximum:

  • Is the XVI Circuit breaker (SDX) installed? (3 Phase 380V 32kva)

  • What is the power output of the XVI circuit breaker?

  • Is the Client Interface Terminal Box in position?

  • Has the Radiation Door Interlook been tested and passes?

  • Has the Laser Alignment System been tested and passes?

  • Has the Emergency buttons been tested and passes?

  • Has the Treatment Room Lights (both dimmed & fluorescent) been tested and passes?

  • Has the Radiation Warning Light(s) been tested and passes?

  • Has the Fascia Door Interlooks been tested and passes?

  • Has the Water Chiller Start Circuit been tested and passes?

  • The CITB should be made available to the local/ customer electrician during the first days of installation/ rigging?

  • Has the Radiation Door Interlook cables available for connection to the CITB?

  • Has the Laser Alignment System cables available for connection to the CITB?

  • Has the Emergency buttons cables available for connection to the CITB?

  • Has the Treatment Room Lights (both dimmed & fluorescent) cables available for connection to the CITB?

  • Has the Radiation Warning Light(s) cables available for connection to the CITB?

  • Has the Fascia Door Interlooks cables available for connection to the CITB?

  • Has the Water Chiller Start Circuit cables available for connection to the CITB?

  • Is installed the air conditioning ductwork?

  • Is the air conditioning system equipment on site ?

  • Is the air conditioning system functional?

  • Tested ?

  • Ductwork cleaned to remove the dust?

  • When will this be done?

  • State the humidity of the air in the treatment room:

  • State the temperature in the treatment room:

  • Is the final lighting installed?

  • Is the final lighting operational?

  • When will this be done?

  • Have the false ceiling tiles been installed?

  • When will this be done?

  • If there is a ceiling mounted I-Beam, have any struts or panels in the false ceiling been mounted across the path of the chain hoist and trolley?

  • When will they be removed?

  • Is a fire detection system installed in the treatment room? (In both the patient area or gantry areas)

  • State the type of fire detection system used:

  • The raceway of CCTV and Intercom system are cleaned and connecting the control area?

  • When will they be complete?

  • Are there pull string inside of the raceway/ conduits connecting the treatment room to the control area?

  • Is a functional sink with water and drain in the treatment room?

  • Is the room clear of workers?

  • Has the treatment room been cleared of debris and swept clean?

  • When will this be done?

  • Is there In Room Monitor ?

  • Was planned space for monitor installation?

  • Are there eletrical power plug and logic connection plug?

  • Is there Hexapod/IGuide system to be implemented?

  • Is there free space on the roof (500mm G-T axis and 240+-8mm A-B axis ) - front of the I-beam?

  • Is it installed 1" conducted between the IGuide and Hexapod box?

  • Does it need the Site adapted structure support?

  • Is there Remote Hexapod Monitor in the treatment room?

  • Was planned space for monitor installation?

  • Are there eletrical power plug and logic connection plug?

  • New Clarity system to be implemented?

  • 110/220V power plug available?

  • Is there 1" infrastructure (Data connection RJ45 CAT 6) connection between the IGuide support and clarity wall plate?

  • Is there Data connection RJ45 CAT 6 connection between clarity wall plate and the network (connected at CT room)?

  • Is it implemented the new infrastructure (Data connection RJ45 CAT 6) at CT room?

  • Is the camera positioned at CT (computer tomography) room (1950mm) ?

  • Is there "LINAC" laser installed at CT room" (different isocenter between CT and LINAC) ?

  • Check the LINAC isocenter

  • New ABC system to be implemented?

  • 110/220V power plug available?

  • Is there 1" infrastructure (Data connection RJ45 CAT 6) connection between the control area and treatment area?

  • New Response system to be implemented?

  • How long the lenght of optical cable to be connected from RIC to Control Desk? (standard cable lenght 30m)

  • New QA (EPIGray or Perfraxion systems) to be implemented?

  • Logic connection plug available?

  • 110/220V power plug available?

  • Any other considerations or comments on the above?

6. Control Room

  • Is the control desk in position

  • Does the control desk has the minimum height to place the LINAC cabinet (W 60cm x H 70cm x dep 105cm)

  • Are the LINAC cable ducts finished?

  • When will they be done?

  • Are the single phase outlets installed?

  • When will they be?

  • Is single phase power supplied to them?

  • When is this expected to be complete?

  • How many 20 amperes outlets power is installed?

  • Who is responsible for installing CCTV & Intercom systems

  • Are the cable ducts clean and clear?

  • Are the cable ducts support?

  • Do the cable ducts meet the requirements on Elekta site planing drawings?

  • Do the cable duct covers fit correctly?

  • Has the final floor been laid?

  • When will this be done?

  • Have the ceiling grid and ceiling tiles been installed?

  • When will this be done?

  • Is the air conditioning system functional, tested , and cleaned to remove dust?

  • When will this be done?

  • Is the final lighting installed?

  • Is the final lighting operational?

  • When will this be done?

  • Is the Control Cabinet position clear?

  • Is site implementing a systems computer closet?

  • Does closet have adequate air flow?

  • Does closet have pullout shelving?

  • Have 3" grommeted cable passages been cut in the control desk counter top?

  • When will this be done?

  • Has the control area been cleared of debris and swept clean?

  • When will this be done?

  • New AQUA system to be implemented?

  • Is 80cm of free space available at planning desk?

  • 110/220V power plug available?

  • Data connection RJ45 CAT 6 available, connected to the client network and functional?

  • Opening about 3" for cable pass?

  • New QA (EPIGray or Perfraxion systems) to be implemented?

  • Is 50 cm of free space available at planning desk?

  • 110/220V power plug available?

  • Is there 1" infrastructure (Data connection RJ45 CAT 6) connection between the control area and treatment area?

  • Opening about 3" for cable pass?

  • New ABC system to be implemented?

  • Any other considerations or comments on the above?

7. Chilled Water Supply

  • What is the voltage power to the chiller device?

  • Is the chiller water equipment purchased ?

  • Is on the site the chiller water equipment ?

  • Please attached the photo of the TAG equipment number

  • Is the Chilled water being supplied from:

  • Who is the manufacturer of chiller?

  • Is chiller running 24/7 or on/off with linac ?

  • Has Chiller been commissionedwith chiller mfg / mechanical contractor?

  • Date scheduled?

  • Were the pipes tested by pressure ?

  • Is the temperature gauges in place?

  • Is the pressure gauges in place?

  • Is both supply and return line pressure valves installed?

  • Is the by-pass pressure valves installed?

  • Was it installed the electrical infrastructure for the remote control panel (in the bunker)?

  • Is the electrical cables available to connect into the CITB ?

  • Are the 1" (25mm) hose connector installed and in proper location?

  • Is the chilled water system fully operational?

  • State the chilled supply water pressure:

  • State the chilled supply water temperature:

  • State the chilled water flow rate:

  • Is site using city water as a back up?

  • City water temperature:

  • City water supply pressure:

  • City water return pressure:

  • City water flow rate:

  • City water filtration:

  • Any other considerations or comments on the above?

8. Radiation Protection

  • Has the shielding plan been approved by locally nuclear agency?

  • Has the radiation door been approved by the customer's Physicist?

  • Name of Customer's Physicist of Record?

  • Physicist contact number:

  • Is the Main Vault Entrance Door purchased ?

  • Is on site the Main Vault Entrance Door ?

  • Is the Main Vault Entrance Door installed ?

  • When will this be done?

  • Is the Main Vault Entrance Door operational?

  • Any other considerations or comments on the above?

9. Comand Room Networking

  • An IP Address is required for installation of your machine. You must provide the correct IP Address(es) within the first three (3) days of the system delivery. This Note is to inform you that failure to provide the IP Address(es) could result in an additional charge to the customer from Elekta.

  • Are the network RJ45 points installed?

  • Does the network RJ45 points active for the Elekta NSS?

  • What are the network addresses?

  • I.P. Address - LCS Cabinet:

  • I.P. Address - Secondary Impac Computer (Scheduler) :

  • I.P. Address - Network Printer:

  • Subnet Mask:

  • Default Gateway:

  • WINS/DNS Primary:

  • WINS/DNS Secondary:

  • What are the nodes names?

  • Is network available?

  • When will this be done?

  • Has the network been tested as functional?

  • When will this be done?

  • Are there some quantity of spare RJ45 points

  • Any other considerations or comments on the above?

10. Information for Elekta

  • Are 10 gallons of distilled water available? (De-mineralized water is not acceptable)

  • When will water be available?

  • Is a cylinder of SF6 available? ( size "B" or "C" is acceptable, min 99% purity required)

  • Who is providing SF6?

  • When will it arrive to site?

  • Expected day gases are to be on site?

  • Has provisions been made for disposing of, or recycling all packaging and crates?

  • It the site a new or existing building?

  • Has all building work been completed?

  • Is any hospital staff working on the access route?

  • Have arrangements been made for the area to be clear on the delivery day and the following day?

  • Is a lockable area available for the storage of the delivered equipment and tools?

  • How wide is the doorway?

  • What are the dimensions of the space?

  • Enter all facility contacts for Elekta Installation Engineers

  • Installers Contacts
  • Contact Name:

  • Contact Title:

  • Contact Phone:

  • List any individuals that will be working with the Elekta Engineers:

  • Contacts:
  • Name:

  • Title / Company:

  • Phone:

  • NOTE: The installation Engineer has no authority to change the set-up, configuration, or add a special requirement unless he has approval from Elekta's development department that it is safe to do so.

  • Give details of any locally agreed specials or changes to the end set-up, configuration of the Linac, or its options that are not mentioned on the order or approved by Elekta.

  • Any political issues or problems to be aware of?

  • State the communication arrangements with regards to the ordering and delivery of spare parts from Elekta to the hospital during installation.

  • This report was completed by:

  • Is the site approved to start the installation?

  • Signature:

  • Additional comments:

Inspection notes

  • Inspection Notes:

  • Site Pictures:

  • Truck Parking and Staging Area:

  • Rigging Path:

  • Vault: include each wall, pit, floor raceway, back wall layout, and ceiling.

  • Control Room: include under countertop, computer closet/Cabinet:

  • Applicator Storage:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.