Information
-
Report Title
-
Client / Site
-
Conducted on
-
Project Team Members:
Pre-Installation Admin
-
Actual Project Address:
-
Project Number:
-
Inspection W/O #:
-
Date of Inspection:
-
Physicist Name:
-
IT responsible Name:
-
Any other considerations or comments on the above?
Data Center
-
Is there a Data Center on the site for project implementation?
-
Where will be installed the Server and components?
-
Are the painting, inside finishing, furniture already installed and finished?
-
Are the air conditioning functional?
-
New Moisaq Server to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
Is there space available to install the Mosaiq Server Monitor 19"?
-
New Dicom Namer to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
Is there space available to install the Dicom Namer Monitor 19"?
-
New Backup unit of Mosaiq to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
New ESI to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
New direct access to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
New direct storage to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
New No break to be installed?
-
Is there space available about 1m² to install?
-
Is there 2 units of power plug about 110V/ 220V 3KVA Steck standard?
-
What is voltage?
-
Any comments:
Planning Area
-
Is the painting, internal finishing, furniture already installed and functional?
-
Are the air conditioning functional?
-
If the site does not include a Data Center, then the Mosaiq Server and its components should be installed from the Planning Area.
-
New Moisaq Server to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
Is there space available to install the Mosaiq Server Monitor 19"?
-
New Dicom Namer to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
Is there space available to install the Dicom Namer Monitor 19"?
-
New Backup unit of Mosaiq to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
New ESI to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
New Moisaq Server to be implemented?
-
Witch type of server, rack or tower?
-
Is there space available about 3 "U"?
-
Is there space available on the floor about 1m²?
-
New No break to be installed?
-
Is there space available about 1m² to install?
-
Is there 2 units of power plug about 110V/ 220V 3KVA Steck standard?
-
What is voltage?
-
Is a Monaco to be implemented?
-
Is 80cm of free space available at planning desk?
-
110/220V power plug available?
-
Data connection RJ45 CAT 6 available, connected to the client network and functional?
-
Opening about 3" for cable pass?
-
Is a Monaco Sim to be implemented?
-
To be installed at?
-
Is 80cm of free space available at planning desk?
-
110/220V power plug available?
-
Data Connection RJ45 CAT6 available, connected to the client network and functional?
-
Opening about 3" for cable pass?
-
Where?
-
Is 80cm of free space available at the desk?
-
110/220V power plug available?
-
Data connection RJ45 CAT6 available, connected to the client network and functional?
-
Opening about 3" for cable pass?
-
New Mosaiq workstations to be implemented?
-
How many Mosaiq workstations?
-
All Mosaiq workstations will be installed at planning area?
-
Is 80cm of free space available at planning desk for each Mosaiq workstation?
-
110/220V power plugs available for each Mosaiq workstation?
-
Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?
-
Opening about 3" for cable pass?
-
How many Mosaiq workstation will be installed out of planning area?
-
What are the locations?
-
Is 80cm of free space available at desk for each Mosaiq workstation?
-
110/220V power plugs available for each Mosaiq workstation?
-
Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?
-
Opening about 3" for cable pass?
-
How many Mosaiq workstation will be installed at planning area?
-
Is 80cm of free space available at desk for each Mosaiq workstation?
-
110/220V power plugs available for each Mosaiq workstation?
-
Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?
-
Opening about 3" for cable pass?
-
New ABAS library to be implemented?
-
Is 80cm of free space available at planning desk?
-
110/220V power plug available?
-
Data connection RJ45 CAT 6 available, connected to the client network and functional?
-
Opening about 3" for cable pass?
-
Any comments:
Control Area
-
Attention!
Do not forget the needed space on the control desk for the Linac stuffs: TCC, IView, XVI, Apex, IGuide, CCTV and Printers. -
Select:
- TCC
- Iview
- XVI
- IGuide
- CCTV
- Printer
-
Is the painting, internal finishing, furniture already installed and functional?
-
Are the air conditioning functional?
-
New Mosaiq Sequencer/ Synergistiq to be implemented?
-
Is 80cm of free space available at desk for each Mosaiq workstation?
-
110/220V power plugs available for each Mosaiq workstation?
-
Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?
-
New Mosaiq workstation to be implemented at control area?
-
How many Mosaiq workstation
-
Is 80cm of free space available at desk for each Mosaiq workstation?
-
110/220V power plugs available for each Mosaiq workstation?
-
Data connection RJ45 CAT 6 available, connected to the client network and functional?
-
Any comments:
Networking
-
Are the client networking available, tested and functional?
-
Are the data cabling RJ45 CAT 6 standard?
-
Are the switches 1 Gigabite quality?
-
Are the switches exclusives for Elekta implementation?
-
Does the customer intends to connect the RM to the Elekta system?
-
NAME:
-
PORT:
-
IP:
-
TITLE:
-
Dos the customer intends to connect the Tomography to the Elekta system?
-
NAME:
-
PORT:
-
IP:
-
TITLE:
-
Is an internet available to download software and to help onsite implementation?
-
Any other considerations or comments on the above?
Inspection Notes
-
Inspection type:
-
Is the site ready to start the implementation of HW & SW?
-
Select date
-
Responsible to complete the report:
-
Add signature
-
physicist name:
-
Add signature
-
IT responsible name:
-
Add signature