Pre-Installation Admin

Actual Project Address:

Project Number:

Inspection W/O #:

Date of Inspection:

Physicist Name:

IT responsible Name:

Any other considerations or comments on the above?

Data Center

Is there a Data Center on the site for project implementation?

Where will be installed the Server and components?

Are the painting, inside finishing, furniture already installed and finished?

Are the air conditioning functional?

New Moisaq Server to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

Is there space available to install the Mosaiq Server Monitor 19"?

New Dicom Namer to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

Is there space available to install the Dicom Namer Monitor 19"?

New Backup unit of Mosaiq to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

New ESI to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

New direct access to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

New direct storage to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

New No break to be installed?

Is there space available about 1m² to install?

Is there 2 units of power plug about 110V/ 220V 3KVA Steck standard?

What is voltage?

Any comments:

Planning Area

Is the painting, internal finishing, furniture already installed and functional?

Are the air conditioning functional?

If the site does not include a Data Center, then the Mosaiq Server and its components should be installed from the Planning Area.

New Moisaq Server to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

Is there space available to install the Mosaiq Server Monitor 19"?

New Dicom Namer to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

Is there space available to install the Dicom Namer Monitor 19"?

New Backup unit of Mosaiq to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

New ESI to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

New Moisaq Server to be implemented?

Witch type of server, rack or tower?

Is there space available about 3 "U"?

Is there space available on the floor about 1m²?

New No break to be installed?

Is there space available about 1m² to install?

Is there 2 units of power plug about 110V/ 220V 3KVA Steck standard?

What is voltage?

Is a Monaco to be implemented?

Is 80cm of free space available at planning desk?

110/220V power plug available?

Data connection RJ45 CAT 6 available, connected to the client network and functional?

Opening about 3" for cable pass?

Is a Monaco Sim to be implemented?

To be installed at?

Is 80cm of free space available at planning desk?

110/220V power plug available?

Data Connection RJ45 CAT6 available, connected to the client network and functional?

Opening about 3" for cable pass?

Where?

Is 80cm of free space available at the desk?

110/220V power plug available?

Data connection RJ45 CAT6 available, connected to the client network and functional?

Opening about 3" for cable pass?

New Mosaiq workstations to be implemented?

How many Mosaiq workstations?

All Mosaiq workstations will be installed at planning area?

Is 80cm of free space available at planning desk for each Mosaiq workstation?

110/220V power plugs available for each Mosaiq workstation?

Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?

Opening about 3" for cable pass?

How many Mosaiq workstation will be installed out of planning area?

What are the locations?

Is 80cm of free space available at desk for each Mosaiq workstation?

110/220V power plugs available for each Mosaiq workstation?

Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?

Opening about 3" for cable pass?

How many Mosaiq workstation will be installed at planning area?

Is 80cm of free space available at desk for each Mosaiq workstation?

110/220V power plugs available for each Mosaiq workstation?

Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?

Opening about 3" for cable pass?

New ABAS library to be implemented?

Is 80cm of free space available at planning desk?

110/220V power plug available?

Data connection RJ45 CAT 6 available, connected to the client network and functional?

Opening about 3" for cable pass?

Any comments:

Control Area

Attention!
Do not forget the needed space on the control desk for the Linac stuffs: TCC, IView, XVI, Apex, IGuide, CCTV and Printers.

Select:

Is the painting, internal finishing, furniture already installed and functional?

Are the air conditioning functional?

New Mosaiq Sequencer/ Synergistiq to be implemented?

Is 80cm of free space available at desk for each Mosaiq workstation?

110/220V power plugs available for each Mosaiq workstation?

Data connection RJ45 CAT 6 available for each Mosaiq worskstation, connected to the client network and functional?

New Mosaiq workstation to be implemented at control area?

How many Mosaiq workstation

Is 80cm of free space available at desk for each Mosaiq workstation?

110/220V power plugs available for each Mosaiq workstation?

Data connection RJ45 CAT 6 available, connected to the client network and functional?

Any comments:

Networking

Are the client networking available, tested and functional?

Are the data cabling RJ45 CAT 6 standard?

Are the switches 1 Gigabite quality?

Are the switches exclusives for Elekta implementation?

Does the customer intends to connect the RM to the Elekta system?

NAME:

PORT:

IP:

TITLE:

Dos the customer intends to connect the Tomography to the Elekta system?

NAME:

PORT:

IP:

TITLE:

Is an internet available to download software and to help onsite implementation?

Any other considerations or comments on the above?

Inspection Notes

Inspection type:

Is the site ready to start the implementation of HW & SW?

Select date

Responsible to complete the report:

Add signature

physicist name:

Add signature

IT responsible name:

Add signature
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.