Information
-
Branch Location/Store Number
-
Prepared by
-
Select date
Pre Opening
BM Engagement Day Preparation (-2 weeks to opening).
-
Store SWOT analysis completed (Attach photo of SWOT analysis).
-
30/60/90 day Plan prepared - Focus on People, Customers and Finance (Attach photo of plan).
-
6 week rota completed - all team aware of working requirements during launch week.
-
Branch Manager Induction completed.
Store Preparation (-1 week to opening).
-
Cleaning materials ordered (Order to base store and take with).
-
Additional collateral ordered - invoices, tote seals, EE pads (Order to base store and take with).
-
Customer consultant skills audit completed with training needs identified.
-
All colleagues have full uniform including name badge (escalation missing uniform to Transformation Manager).
Opening Week
Sunday Store Meeting (-4 days to opening).
-
Sunday meeting completed.
-
Team charter/vision created - agreed actions and commitments for new store.
-
Zoning Plan cascaded to the team.
-
Greet plan cascaded to the team.
-
Customer handover plan cascaded to the team.
-
Capture photos from Sunday meeting.
Tuesday activity (-2 days to opening).
-
Delivery unpacked and checked off.
-
Delivery discrepancies raised.
-
Secure cabinet installed.
-
Handsets placed in secure cabinet in MSC order.
-
POS pack received and checked off. Any missing POS ordered.
-
Accessories sorted into totes in category type to support merchandising slat walls.
-
Furniture and slat walls installed.
-
All demo handsets merchandised.
-
All PIE terminals fully functioning (check chip&pin, printer, paperless, scanners).
-
Test and confirm telephone lines working.
-
Safe installed with managers access set-up.
-
Kronos installed with all colleagues enrolled.
-
WPIE network set up, Pin Point tablets connected and tested (Password: Fruta6Wuqapaswl9).
-
End of day floor walk completed to capture any snags (record in MRL report).
Wednesday activity (-1 day to opening).
-
Accessories slat walls complete to plan - pegs locked in place, priced, equally spaced, uniform edges, pulled forward with stock limiters.
-
All demo devices powered up, activated (if iPhone) and displaying demo content.
-
Ensure demo devices are NOT connected to WiFi networks ('forget all networks') and screen handsets for unsuitable content.
-
FSDU locations reviewed to ensure optimum customer flow.
-
Store dressed for opening using engagement pack.
-
All till pods full merchandised for trade.
-
Till floats in place.
-
Bookmarks set-up on terminals - E.g. CPWTouch, GSM Arena, FMiP checker etc.
-
Cupboards under easels stocked with SIM cards, collateral.
-
Content for tomorrow's launch briefing prepared.
-
Role play zoning positions, greet and customer handover scenarios.
-
Managers office set-up - store plan, team charter, performance trackers and filing in place.
-
End of day floor walk completed to capture any snags (record in MRL report).
FINAL STORE SIGN OFF (THURSDAY AM).
-
All construction (power, data, fixtures) completed to plan.
-
Any damage to furniture, walls, skirting, poor decoration etc logged on MRL report (capture photos).
-
All signage (interior and exterior) installed.
-
All live products fully functioning (including digital screens, posters).
-
All products ticketed correctly.
-
Manufacturer bays completed to plan.
-
Surplus fixtures, POS, cardboard uplifted or disposed of correctly.
-
Store cleaning completed to standard.
Thursday - Store opening.
-
Final store walk completed - ensure ALL remaining snags are captured on MRL report.
-
External collateral in place - E.g. bollard covers, poster.
-
Morning briefing completed - clear targets and expectations set for the day.
-
Capture photos of store opening, including ribbon cutting.
Post Opening
Snag completion (+1 week).
-
All snags completed (any outstanding snags escalate to Transformation Manager).
Post opening review.
-
Overview first weeks trade:
-
Review and learnings around Zoning Plan.
-
Review and learnings around Greet plan.
-
Review and learnings around Handover plan.