Title Page
-
Site conducted
-
Document No.
-
Site
-
Brief description of work activity
-
Location of Work
- Unit 1
- Unit 3
- Unit 4
- Unit 5
- Unit 6
- Unit 7
- Unit 8
- Unit 9A
- Unit 9B
- Unit 10
- Unit 11
- Unit 12
- Unit 13
- Unit 14
- Unit 15
- Unit 16
- Unit 17
- Alpine Street
- West side tenants corridor
- East side tenants corridor
- Ground floor West side tenants plant room
- Ground floor East side tenants plant room
- West side LV switch room
- West side tenants meter room
- West side Fire Exit Staircase
- Ground floor West side Comms room
- Ground floor West side beer cellar
- Ground floor West side Fire exit corridor
- Pizza de la Piste
- Storage Room behind Costa
- East side Tenant meter room
- East side tenant plant room
- East side staff Fire exit staircase
- Ground floor East side staff corridor
- East side goods lift lobby
- Ground floor East side Staff changing room
- Ground floor Training room
- Changing Village (main area)
- Changing Village male toilets
- Changing Village Female toilets
- Changing Village Group changing rooms
- Ground floor Operations Office
- Ground floor First Aid room
- Changine Village Cash office
- Ground floor passenger lift
- Alpine Street main staircase
- Snow box airlock
- East side bin store
- East side maintenance corridor
- West side tenants store
- Network substation
- Gas vent plant room
- Landlord HV sub-station
- Generator Room
- West side LV switch room
- Sprinkler tank room
- Snow making plant room
- Chiller plant room
- Dry air cooler compound
- West side bin store
- Snow Box
- Beginners slope storage void
- Snow box fire exit staircase
- Mont Blanc balcony
- Sports bar balcony
- Mont Blanc cafe
- The Eiger
- Kitchen
- Mezzanine
- Sports Bar
- Sports bar prep kitchen
- 1st floor West side plant room 1
- 1st floor West side plant room 2
- 1st floor west side tenants plant room
- 1st floor Compass office
- 1st floor Compass Managers office
- 1st floor west side male toilets
- 1st floor west side female toilets
- 1st floor west side disabled toilet
- The Verbier
- The Vail
- The Anton
- The Aspen
- 1st floor meeting room corridor
- 1st floor east side male toilets
- 1st floor east side female toilets
- 1st floor east side disabled toilets
- 1st floor east side corridor
- 1st floor east side staff corridor
- 1st floor Security Control Room
- 1st floor Comms room
- 1st floor delivery store room
- 1st floor staff canteen
- 1st floor male staff toilets
- 1st floor female staff toilets
- 1st floor disabled staff toilets
- 1st floor Admin office 1
- 1st floor Admin office 2
- 1st floor East side AHU plant room
-
ACCESS ONLY
-
Conducted on
-
Competent Person:
-
Personnel
1. Work Activity
-
Location: Where is the task being completed?
- Unit 1
- Unit 3
- Unit 4
- Unit 5
- Unit 6
- Unit 7
- Unit 8
- Unit 9A
- Unit 9B
- Unit 10
- Unit 11
- Unit 12
- Unit 13
- Unit 14
- Unit 15
- Unit 16
- Unit 17
- Alpine Street
- West side tenants corridor
- East side tenants corridor
- Ground floor West side tenants plant room
- Ground floor East side tenants plant room
- West side LV switch room
- West side tenants meter room
- West side Fire Exit Staircase
- Ground floor West side Comms room
- Ground floor West side beer cellar
- Ground floor West side Fire exit corridor
- Pizza de la Piste
- Storage Room behind Costa
- East side Tenant meter room
- East side tenant plant room
- East side staff Fire exit staircase
- Ground floor East side staff corridor
- East side goods lift lobby
- Ground floor East side Staff changing room
- Ground floor Training room
- Changing Village (main area)
- Changing Village male toilets
- Changing Village Female toilets
- Changing Village Group changing rooms
- Ground floor Operations Office
- Ground floor First Aid room
- Changine Village Cash office
- Ground floor passenger lift
- Alpine Street main staircase
- Snow box airlock
- East side bin store
- East side maintenance corridor
- West side tenants store
- Network substation
- Gas vent plant room
- Landlord HV sub-station
- Generator Room
- West side LV switch room
- Sprinkler tank room
- Snow making plant room
- Chiller plant room
- Dry air cooler compound
- West side bin store
- Snow Box
- Beginners slope storage void
- Snow box fire exit staircase
- Mont Blanc balcony
- Sports bar balcony
- Mont Blanc cafe
- The Eiger
- Kitchen
- Mezzanine
- Sports Bar
- Sports bar prep kitchen
- 1st floor West side plant room 1
- 1st floor West side plant room 2
- 1st floor west side tenants plant room
- 1st floor Compass office
- 1st floor Compass Managers office
- 1st floor west side male toilets
- 1st floor west side female toilets
- 1st floor west side disabled toilet
- The Verbier
- The Vail
- The Anton
- The Aspen
- 1st floor meeting room corridor
- 1st floor east side male toilets
- 1st floor east side female toilets
- 1st floor east side disabled toilets
- 1st floor east side corridor
- 1st floor east side staff corridor
- 1st floor Security Control Room
- 1st floor Comms room
- 1st floor delivery store room
- 1st floor staff canteen
- 1st floor male staff toilets
- 1st floor female staff toilets
- 1st floor disabled staff toilets
- 1st floor Admin office 1
- 1st floor Admin office 2
- 1st floor East side AHU plant room
-
Brief description of the works:
-
Access Only
Documentation
-
Risk/Activity Assessment Ref:
-
Risk Assessment photographic record
-
Date on Risk Assessment
-
Is the Risk Assessment suitable and sufficient?
-
Risk Assessment prepared by:
-
Method Statement Ref:
Higher Risk Work Activity Assessment
-
Entry in to a Confined Space? (includes work in or access to any void area, including roof voids
-
Permit to Work issued
-
LV Electrical? (any works requiring multiple points of isolation)
-
Permit to Work issued
-
HV Electrical? (any works on any part of the HV system)
-
Permit to Work issued
-
Fire & Life Safety Systems? (fire alarm/HSSD/Extinguishers - work requiring isolation of a complete system or multiple zones)
-
Permit to Work issued
-
Hot Works? (any works with a naked flame, or where there is a risk of causing fire or fumes)
-
Permit to Work issued
-
Mechanical Isolation? (multiple isolation of any Gas, Pressure or Water system for intrusive works - excluding visual inspections)
-
Permit to Work issued
-
Working at Height? (for work on any specialised access equipment, roofs, or any unprotected high places)
-
Permit to Work issued
-
Other Task Specific Permit?
-
Specify
-
Permit to Work issued
-
Assessed by: (the Competent Person completing the activity)
-
Company:
-
Contact telephone No:
Permission to Proceed
-
Start Time:
-
End Time:
-
Site Induction Completed
-
Authorised by: (the Responsible Person)
-
Contact Tel. No:
Completion or Cancellation of Work
-
Competent Person:
-
Date & Time of completion/cancellation
-
Responsible Person:
-
Date & Time of completion/cancellation