Title Page
-
Project
-
Date & Time
-
Form Completed By
-
Location
Untitled Page
Energy
-
Is energy usage in site accommodation being used efficiently i.e. lights not being left on, computer equipment not being left running when not being used etc?
-
Is energy on site being used efficiently i.e. lights not left on, equipment and machinery not left running idle etc?
-
Are energy saving techniques being used on site e.g. daylight sensors, zoned lighting, connection to Ecotricity for green electricity?
-
Is temporary site lighting (security / task) located / directed correctly to ensure best energy use?
-
Are hybrid, electric or cleantech plant and equipment being used?
Ecology and biodiversity
-
Have all nesting species on site (if applicable) been adequately protected to ensure that they are not adversely effected?
-
Have all trees in the working area (if applicable) been adequately protected and signed in accordance with BS5837?
-
Where there is evidence of rats, pigeons or other vermin on site have all appropriate measures and action been taken to address this? Please comment.
-
If Japanese Knotweed is present in the work area are all control measures in place to manage it?
-
Are there any examples or opportunities for ecology or biodiversity best practice? Please comment.
Noise, Vibration & Dust
-
Are all works being carried out in line with the site Section 61 Agreement or approved Statement of Intent?
-
Are appropriate forms of dust suppression being used where required and are they effective?
-
Is all plant and equipment that generates noise & dust emissions sited away from sensitive areas?
-
Have sufficient noise reduction techniques been adopted to reduce noise emissions from plant and equipment?
-
Are noise / dust emissions within limits? If no, what action is being taken?
Pollution Control
-
Are all taps and valves (where oil could escape) kept locked shut when not in use?
-
Are all taps, valves, and flexible hoses and any pumps, through which oil can be discharged, located within the secondary containment, and of good working order?
-
Are storage containers in appropriate area (e.g. away from traffic, water courses, on impermeable ground etc) and in a lockable and ventilated area?
-
Is the secondary containment free from rainwater and residual fuel?
-
Do storage containers have secondary containment i.e. bunds (110%), drip trays that are sufficiently sized for the container?
-
Have storage containers for fluids been inspected to ensure that there are no leaks etc?
-
Is there suitable storage containers for fluids (liquids & gases), which are fit for purpose and labelled?
-
Is there sufficient and appropriately sized equipment (i.e. spill kits) in place on site to deal with a pollution incident (s)?
-
Is a spill response procedure in place and communicated on site, with an appropriate team nominated?
-
Has the spill response procedure been tested in accordance with an agreed schedule?
-
Has plant / equipment been checked to ensure that they are not emitting black smoke?
-
Has plant been checked to ensure it complies with HS2 NRMM (Non Road Mobile Machinery) requirements?
-
Is NRMM plant tagged? (eg CESAR
-
Is temporary plant / mobile equipment being turned off when not in use?
Transport
-
Are deliveries being received only within the hours of the site operations?
-
Are delivery vehicles turning off engines when off-loading or waiting to enter site?
-
Are nearby road ways being kept clear and clean to reduce the build-up of mud and dirt?
Waste
-
Are bins regularly emptied with none visibly overfilled or at risk of materials escaping?
-
Are Waste Transfer Notes and Consignment Notes (Hazardous Waste) being filled out correctly?
-
Are waste streams being correctly segregated?
-
Do all contractors who are managing waste on & offsite (inc. the of transportation waste) have valid licenses / permits in place?
-
Is there a dedicated COSHH / Hazardous waste bin(s) - is this clearly labelled, stored & sited away from sensitive receptors (surface drains, water courses etc)?
-
If contaminated land is identified, is it being handled with the appropriate controls in place?
-
Are there recycling facilities available in the site offices and welfare accommodation?
-
Have opportunities to reduce waste or improve recycling been identified?
Water
-
Are valid water consents or licences (for discharges or abstraction) in place and conditions being complied with?
-
Are cement & concrete pumping / delivery and wash out areas adequately protected, at least 10m away from drains, to prevent cement or contaminated water escaping?
-
Has plant equipment / wheel wash systems been sited 10m away from surface water drains?
-
Have nearby surface water drains been adequately covered to prevent silts / pollutants entering them and colour coded or labelled?
-
Have settlement / re-circulation systems been checked to ensure they are operating correctly?
-
Have all water leaks (if applicable) been immediately addressed and fixed? Please comment.
-
Have opportunities to reduce water consumption been identified?
Materials
-
Have all materials on site been responsibly sourced (e.g. FSC timber, BES6001 concrete, steel, brick and plasterboard and Cares Sustainability/Eco Reinforcement for rebar)?
-
Are materials stored in a way that prevents damage?
-
Are materials being used efficiently (e.g. use of off-cuts, re-using materials to reduce waste)?
-
Have any opportunities for reducing single use plastics been identified?
Sign off
-
Inspection carried out by
Additional Attendees
-
Name & Company