Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
TTFN CABLE INFORMATION.
-
DSS INFORMATION BELOW ,TO ADD DSS CABLE INFORMATION, press button. ->
DSS Cable
DSS CABLE INFORMATION.
-
DSS Data - cable number : cable size , manufacture , CN , Production date.
-
PLEASE ADD LEGIBLE PHOTO OF ABOVE INFORMATION
-
Cable segment length. Please record sheath measurement
-
Has the duct shown on the plan been used?
-
Please record for REDLINE.
-
PIT & MANHOLE LABELLING AN CABLE MANAGMENT. To add Pit/Manhole press button ->
Pit & Manhole.
-
Has cable been labeled in PIT/MANHOLE. Please add photo.
-
Manhole only. Has cable been racked and cable tied to cable rest?Please add photo.
TTFN JOINT INFORMATION.
-
DJL JOINT INFORMATION BELOW ,TO ADD DJL CABLE INFORMATION, press button. ->
DJL jOINT
DJL JOINT INFORMATION.
-
Is joint location as per plan?
-
Please record location for REDLINE.
-
Has the correct type of joint been used?
-
Is joint correctly mounted & labelled as per plan? Please include legible photo.
-
Please provide Joint Type & Serial no # Please include legible photo of Serial no.
-
Add address/location of joint.
NEW ESTATE
LSS CABLE INFORMATION
-
LSS INFORMATION CAN BE ENTERED BELOW TO ADD LSS INFORMATION. Please press button. ->
LSS cable
-
LSS Data- cable no#, manufacture , CN , Production Date.
AJL JOINT INFORMATION
-
AJL INFORMATION CAN BE ENTERED BELOW TO ADD ADDITIONAL AJL. Press button. ->
AJL JOINT
-
Is joint location as per plan?
-
Please record location for REDLINE.
-
Has the correct type of joint been used?
-
Is joint correctly mounted & labelled as per plan? Please include legible photo.
-
Please provide Joint Type & Serial no # Please include legible photo of Serial no.
-
Add location
NEW FDH INFORMATION
-
Please add photo of FDH site before any work commences.
-
Has contractor provided a copy of the DBYD inquiry? Please provide SQ No below.
-
STOP EXCAVATION WORK IMMEDIATELY,
-
Has a excavation/Dig permit been completed & available onsite?
-
STOP EXCAVATION WORK IMMEDIATELY,
-
Is the plinth formwork level of correct height,size & offset
-
PLEASE RECORD YOUR OBSERVATIONS ABOVE INCLUDING LEGIBLE PHOTOS.
-
Has FDH base plate been installed with conduit in correct location.
-
Have lifting lugs been removed?
-
FDH Data - serial no# Please add a legible photo of Serial no.
-
HSD Data - Manufacturer , CN , Production Date. Please add legible photo.
-
HSL Data - Manufacturer , CN , Production Date. Please add legible photo.
-
Have 3 Corning brand splitters been installed?
-
Has FDH been correctly labelled as per plan. Please add legible photo's of both inside & outside label's.
-
Has lead in conduit been sealed ( Jackmoon / T-DUX)? Please add legible photo.
-
Has area surrounding the FDH been remediated as required.
-
PLEASE ADD DILAPIDATION PHOTOS.
MSS & MPT INFORMATION
-
MSS & MPT INFORMATION CAN BE ENTERED BELOW TO ADD MSS INFORMATION Press button. ->
MSS & MPT
-
Please insert MSS number.
-
Has the MSS been installed as per plan.
-
Has MPT bracket been installed as high as possible 50mm from the corner of the pit ?
-
Are both the MSS & MPT stub taped & coiled in a neat tidy manner (Not twisted, exceeding minimum bend radius).
-
Has both the MSS & MPT labels been positioned correctly 100mm from MPT & MSS 100mm from connector with label as per plan?