Title Page
-
Project Number
-
Project Name
-
Project Stage
-
Location
-
Inspection Date & Time
-
Prepared by
1.0 SITE CONDITIONS
-
Weather
- Clear
- Cold
- Cool
- Fog
- Hot
- Overcast
- Rainy
- Windy
-
Site Conditions
-
General Notes
2.0 SITE DETAILS
-
Lead Contractor
-
Lead Contractor Foreman on Site
-
Sub-Contractors on Site
- Drainage
- Earthworks
- Electrical
- Electrical Authority
- Gas
- Road
- Sewer
- Telecommunications
- Survey
- Water
-
General Notes
3.0 SITE WORKS
-
Bulk Earthworks
-
Drainage
-
Drainage (Detention)
-
Drainage (Wetlands)
-
Drainage (WSUD)
-
Electrical (Internal)
-
Electrical (External & HV)
-
Gas
-
Pad Cutting
-
Retaining Walls
-
Road Works
-
Sewer (External)
-
Sewer (Internal)
-
Telecommunications
-
Water (Fire)
-
Add media
-
Water (Non-Potable)
-
Water (Potable)
-
General Comments on site works progress
4.0 ENVIRONMENTAL & OHS
-
EMP Elements in Place
-
Is Traffic Management in Place?
-
In line with approved TMP?
-
Site stockpiles as per EMP?
-
Comments on Site stockpiles
-
Tree Protection Zones Required?
-
Tree Protection Zones (TPZ) in Place?
-
Tree Protection Zones (TPZ) comments
-
Add media
-
Site Safety Measures in Place
-
Flashing Lights
-
High Visibility Cloting
-
Hard Hats
-
Trench Shields
-
Barriers on trenches
5.0 SITE PHOTOS
-
Site Photos captured as part of inspection
-
Add media