Information
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Document No.
Drill Site Inspection.
Documentation
-
Do you have current drill plan in from Tech Services
-
Do you have current JHA/ SWIMS for setting up site?
-
Have Safe Check been completed.
Drill Site.
-
Is the ground support to standard at the drill site.
-
Is the ventilation to standard at the drill site
-
Are the radios working, do you have clear radio communications at drill site.
-
Are cement pad correct for machine
- 71R- 5.5m x 10m.
- 41R- 5.5m x 7m.
-
All FLP and BLP marked and pinned.
-
Is back Hights sufficient for machine?
- 73R - back height minimum 7m
- 41R back height 5.5m
-
Air and Water Services installed and within 50m from collar point.
- Water 2" with Isolation Point.
- Air 1 " with Isolation Point.
-
Power supply 1000 Volts trailing cable with anchor point installed 50m from collaring point.
-
Is there a suitable sump area and in correct location of drive?
-
Is drainage set up for drill site directed to sump.
-
Is power available for Sump Pump?
Breakthrough and reamer hookup inspection.
-
Is the ground support to standard at the drill site.
-
Is the ventilation to standard at the drill site
-
Are the radios working, do you have clear radio communications at break through.
-
Air & Water minimum 50m from B/T
-
Breakthrough has been marked-up to ensure the area is clear of ground support bolts & adequate room to remove & install BHA
-
Are the backs flat and acceptable for collaring the reamer
-
Are all work areas, tool storage, equipment, and lay-down areas properly marked and barricaded or protected?
-
No unauthorized signs in place and area barricaded.
Comments & Signature
-
COMMENTS:
-
Driller Signature