Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Auditor's Name:
- Darren Mifsud
- Stephen Boyle
- Andrew Cotter
- Kevin Davies
-
Job Number:
-
Project / Site Manager Details:
-
Phone Number:
Installation of Workstations and Loose Furniture
-
Have the critical dimensions been adhered to:
-
Has the soft wiring been installed correctly:
-
Melamine and screen panels are damage free:
-
Are the legs damage free
-
All items have been for counted for correct quantities:
-
Was the installation completed on time:
Joinery / Storage units
-
Have all storage units been installed correctly:
-
Have all shelves been installed:
-
Have all planter boxes been installed correctly:
-
Have exposed screws have been capped with correctly coloured screws:
-
Have all cupboards and draws been cleaned:
-
Lock replacement required:
-
Barrel / Key Number:
Seating
-
Seating is damage free:
-
Bags removed from chairs:
Cleaning
-
Edging checked for glue residue:
-
Rubbish removed from site:
-
All furniture cleaned:
-
Site has been vacuumed:
-
All storage units cleaned for wood chips:
-
IOF labels attached to product:
-
Have all spare parts been removed from site:
Corrective Action
-
Who is responsible to repairs defects:
- Darren Mifsud
- Stephen Boyle
- Kevin Davies
- Andrew Cotter
- Antonio Meunier
-
Drawing of defect:
-
Date defects are to be completed by:
-
Notes:
Sign Off
-
Photograph of site:
-
Client / Project Manager / Site Managers details:
-
IOF Representative's Details: