Title Page

  • Site conducted

  • Conducted on

  • Installer Name

Site Details

  • Client Name

  • Site Address

  • What is the approximate age of the property?

  • Meter Number

  • NMI

  • Distributor

  • Proposed Installation Date from the installer

Proposed System Details

Access

  • Has a lay down area been established?

  • Is temp fencing required?

  • By what method panels will be lifted to the roof?

  • By what method will workers access the roof?

Roof

  • Height of the roof?

  • Pitch of the roof?

  • Material of the roof?

  • Does Roof has any Skylights?

  • Are there any visible signs of degradation on the roof? (Rust, cracks etc). If yes, please attach the pictures in the required photos section

  • Are there any concerns about integrity of the roof?

  • Is there any asbestos in the area where the works will be performed?

  • How many panels will go on TILTS?

  • What would be the angle of TILTS?

  • Is the proposed layout going to fit the roof? If not please provide a picture of amended layout in the required photos section

  • Is there a requirement to provide temporary or permanent walkways for access or future maintenance ?

  • String Configuration? Mention number of panels on each string

  • Length of edge protection?

SB, meter and Inverter

  • Location of SB

  • Location of inverter/inverter station. (Attach the picture in the required photos section)

  • Is there a requirement of cage for the inverter?

  • Is there internet connectivity at the inverter location?

  • Where will be the location of PVDB?

  • Does SB need an upgrade , if yes , please mention why

  • Does property has single phase or three phase meter ?

  • Size of the Main Switch in MSB

  • undefined

  • Size of Service mains (mm)

  • Length of service mains(m)

  • Material of service mains

  • Size of consumer mains (mm)

  • Length of consumer mains (m)

  • Material of consumer mains

  • Size of sub mains (mm)

  • Length of sub mains (m)

  • Material of sub mains

  • Size of inverter mains(mm)

  • Length of inverter mains(m)

  • Material of inverter mains

Electrical & Cabling

  • Can Electrical supply be safely isolated?** Live work is unsafe and illegal**

  • Have Power isolation been discussed with the client?

  • Can lockout and tag out requirements be put in effectively?

  • Is there any life support system onsite, please confirm with client

  • Length of AC Cable

  • Length of DC cable

  • Length of Conduit

Variation and Travel

  • What would be travel charge for the job?

  • How many workers will be required for the job?

  • No. of days needed to complete the job?

  • Please provide the breakdown and dollar value of each extra cost

  • Additional Information

Required Photos

  • Meter

  • MSB

  • Subboards

  • Roof

  • Street View

  • Access point for EWP

  • Inverter location

  • Amended layout if applicable

  • Emergency Assembly area

  • Service mains cable

  • Consumer mains cable

  • Inverter main cable

  • Sub mains cable

  • Other 1

  • Other 2

  • Other 3

  • Other 4

undefined

undefined

Untitled page

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.