Title Page
-
Site conducted
-
Conducted on
-
Installer Name
Site Details
-
Client Name
-
Site Address
-
What is the approximate age of the property?
-
Meter Number
-
NMI
-
Distributor
-
Proposed Installation Date from the installer
Proposed System Details
Access
-
Has a lay down area been established?
-
Is temp fencing required?
-
By what method panels will be lifted to the roof?
- Scissor Lift 8m
- Scissor Lift 10m
- Boom Lift
- Crane
- Scaffolding Tower
- Ladder
-
By what method will workers access the roof?
- Ladder
- Internal access through the building
- Scaffolding Tower
- Boom Lift
- Scissor lift
- Other
Roof
-
Height of the roof?
-
Pitch of the roof?
-
Material of the roof?
- Normal Kliplock
- Longline Kliplock
- Colorbond
- Trimdeck
- TILE
- Kliplock and Colorbond
- Longline Kliplock and Colorbond
- Other, please specify in additional comments section
-
Does Roof has any Skylights?
-
Are there any visible signs of degradation on the roof? (Rust, cracks etc). If yes, please attach the pictures in the required photos section
-
Are there any concerns about integrity of the roof?
-
Is there any asbestos in the area where the works will be performed?
-
How many panels will go on TILTS?
-
What would be the angle of TILTS?
-
Is the proposed layout going to fit the roof? If not please provide a picture of amended layout in the required photos section
-
Is there a requirement to provide temporary or permanent walkways for access or future maintenance ?
-
String Configuration? Mention number of panels on each string
-
Length of edge protection?
SB, meter and Inverter
-
Location of SB
-
Location of inverter/inverter station. (Attach the picture in the required photos section)
-
Is there a requirement of cage for the inverter?
-
Is there internet connectivity at the inverter location?
-
Where will be the location of PVDB?
-
Does SB need an upgrade , if yes , please mention why
-
Does property has single phase or three phase meter ?
-
Size of the Main Switch in MSB
-
undefined
-
Size of Service mains (mm)
-
Length of service mains(m)
-
Material of service mains
-
Size of consumer mains (mm)
-
Length of consumer mains (m)
-
Material of consumer mains
-
Size of sub mains (mm)
-
Length of sub mains (m)
-
Material of sub mains
-
Size of inverter mains(mm)
-
Length of inverter mains(m)
-
Material of inverter mains
Electrical & Cabling
-
Can Electrical supply be safely isolated?** Live work is unsafe and illegal**
-
Have Power isolation been discussed with the client?
-
Can lockout and tag out requirements be put in effectively?
-
Is there any life support system onsite, please confirm with client
-
Length of AC Cable
-
Length of DC cable
-
Length of Conduit
Variation and Travel
-
What would be travel charge for the job?
-
How many workers will be required for the job?
-
No. of days needed to complete the job?
-
Please provide the breakdown and dollar value of each extra cost
-
Additional Information
Required Photos
-
Meter
-
MSB
-
Subboards
-
Roof
-
Street View
-
Access point for EWP
-
Inverter location
-
Amended layout if applicable
-
Emergency Assembly area
-
Service mains cable
-
Consumer mains cable
-
Inverter main cable
-
Sub mains cable
-
Other 1
-
Other 2
-
Other 3
-
Other 4
undefined