Title Page
-
Conducted on
-
Prepared by
-
Location
Lifting Audit
Files and folders
-
Is there a current Lift plan for lifting operations using 3-5t excavators
-
Is there a current Lift plan for lifting operations using 8t excavator
-
Is there a current Lift plan for lifting operations using 13t excavator
-
Is there a current Lift plan for lifting operations using 21t excavator
-
Is there a current Lift plan for lifting operations using Tower crane
-
Is there a basic lift plan for telehandler use.
-
Is there a lift plan for use of a HIAB for unloading on site
-
Have the Lift Plans been signed by relevant persons
Lifting operatives-Training-Competences
-
Are relevant letters of appointment in the Folder
-
Are copies of the Lifting team CPCS in the Lift plan folder
-
Do the excavator operators hold Lifting operatorions endorsement
-
Do the slingers hold All Type All Duties
-
Do Telehandler operators hold A17E (suspended loads)
LOLER Files
-
Is the LOLER folder accessible
-
Have the LOLER folder been divided into sections using file deviders
-
Has the previous weeks inspection been carried out
-
Are all the items listed on the weekly checks in date
-
Have the weekly checks been updated inline with findings from the previous week.
-
Are the weekly checks being completed correctly
-
Are the lifting certs sorted and number linked with the weekly checks
-
Are all the thourough examination certs in the folder
-
Are copies of lifting Equipment certs in the folder, (excavators, cranes, telehandlers)
Site inspection
-
Is there a chain rack or suitable storage area for the lifting accessories currently on site.
-
Is the provided storage being used
-
Are slings being stored correctly, hung up, under shelter, away from direct sunlight
-
Do the webbing slings have Coloured tags showing expiry date
-
Are Chains stored correctly (Hung up)
-
Are one use slings being removed from reinforcement steel bundles
-
Are there collar chains for lifting of reinforcement
-
are there crane liftable waste skips on site. Are there certs for these on site
-
Are webbing slings being removed from loads and stored.
-
Are loads being correctly landed on bearers with the slings free to be removed
-
Are lifts being carried out safely
-
Were all the lifting accessories checked on site during the inspection found to be in good working order
-
Are Loads being landed stable with out risk of falling or toppling
Working at height,
-
Is the slinger working on a wagon with suitable edge protection
-
Is the slinger accessing the trailer using a suitable access system
-
Are lifting accessories being attached/ detached safely when working at height
Supervisor Duties
-
Is the supervisor carrying out Daily briefings (depending on number of men)
-
Are toolbox talks relevant to lifting operations being given to the lifting team
-
Are lifting team profiles being completed for slingers and operators
-
Are the lifting team wearing the correct PPE relevant to site requirements
-
Are lifts being carried out as per the Agreed Schedule of lifts
-
Are work areas being segregated/area controlled during lifting operations
-
Are damaged lifting accessories being destroyed-evidence from weekly checks
-
Are all the crane daily and weekly check sheets completed and up to date.