Is there a current lift plan for lifting operations using 3-5t excavators?
-
Is there a current lift plan for lifting operations using 8t excavator?
-
Is there a current lift plan for lifting operations using 13t excavator?
-
Is there a current lift plan for lifting operations using 21t excavator?
-
Is there a current lift plan for lifting operations using Tower Crane?
-
Is there a basic lift plan for telehandler use?
-
Is there a lift plan for use of a Lorry Loader for unloading on site?
-
Have the lift plans been briefed, and signed by relevant persons?
Lifting operatives-Training-Competences
-
Are relevant letters of appointment in the Lifting Folder?
-
Are copies of the Lifting Team CPCS in the Lifting Folder?
-
Do the excavator operators hold Lifting operations, A59c endorsement?
-
Do the slingers hold 'All Type All Duties' endorsement?
-
Do Telehandler operators hold A17E (suspended loads) endorsement?
LOLER Files
-
Is the LOLER folder/register accessible?
-
Has the LOLER folder been divided into sections using file dividers?
-
Has the previous weeks inspection been carried out?
-
Are all the items listed on the weekly checks in date?
-
Have the weekly checks been updated in line with findings from the previous week?
-
Are the weekly checks being completed correctly?
-
Are the lifting accessory certs. in the Lifting Folder and cross referenced to the LOLER Register?
-
Are all the thorough examination certs. in the folder?
-
Are copies of lifting equipment certs in the folder? excavators, cranes, telehandlers etc.?
Site inspection
-
Is there a chain rack or suitable storage area for the lifting accessories currently on site?
-
Is the provided storage being used?
-
Are slings being stored correctly, hung up, under shelter, away from direct sunlight?
-
Do the webbing slings have coloured tags showing expiry date?
-
Are chains stored correctly: Hung up?
-
Are 'Single Trip' slings being removed from reinforcement steel bundles?
-
Are 'Collar Chains' available for lifting of reinforcement steel?
-
If crane liftable waste skips are on site, are the examination certs held in the Lifting Folder?
-
Are webbing slings being removed from loads and stored?
-
Are loads being correctly landed on bearers, with the slings free to be removed?
-
Are landed loads stable? No hazard presented by risk of falling or toppling?
-
Are all observed lifting operations being carried out safely, in line with the Lift Plan/Schedule of Common Lifts?
-
Are all lifting accessories checked on site during the inspection in good working order?
-
Are suitable tag lines being,
Working at height,
-
Is suitable edge protection in place where a Slinger/Signaller is required to access a delivery vehicle?
-
Is the Slinger/Signaller accessing the trailer using a suitable, safe, access system?
-
Are lifting accessories being attached/detached safely when working at height?
-
Where wearing of harness is required, is slinger/signaller harness trained?
-
Where canti-deck is available on site, are members of the lifting team trained to install?
-
Is the canti-deck installed correctly? Legs are pump safety pins fitted and the gates locked?
Supervisor Duties
-
Is the supervisor carrying out Daily Briefings (dependant on size of lifting team)?
-
Are toolbox talks relevant to lifting operations being briefed to the lifting team?
-
Have lifting team profiles being completed for Lifting Supervisor? Slinger/Signallers? and Plant Operators?
-
Are the lifting team wearing the correct PPE relevant to site requirements?
-
Are lifts being carried out as per the agreed Schedule of Lifts?
-
Are work areas segregated/controlled during lifting operations?
-
Are damaged lifting accessories being removed/destroyed, and recorded/evidenced on weekly checks?
-
Are all the crane daily and weekly check sheets completed and up to date?
-
Are all the excavator/telehandler daily and weekly inspections being completed and up to date?