Title Page

  • Site - Burgate PV Solar Farm (21.00 MWp)

  • Location - Spixworth Road, Norwich. Norfolk NR10 3BX - Site Entrance: ///opens.sounds.digs

  • Burgate PV Solar Farm Directions for Deliveries v1.0 - https://www.dropbox.com/scl/fi/txzjsuvpmuppje19seu5g/Burgate-Directions-1.0-04-08-2023.pdf?rlkey=igi0fof473wtym9qz13lw4v7r&dl=0

  • Date and time of THIS inspection:

  • Inspected by:

  • Signature

Construction Site Inspection

1. Personnel on site

  • Number of workers on site

  • Record the sign in sheets (Initial & date sheets)

  • How many workers were contractors?

  • Chris Sibley Groundworks Ltd

  • Select from range

  • PV. GA Limited

  • Select from range

  • Kampai Solar Ireland Ltd (Matoska)

  • Select from range

  • RTS Total Solutions

  • Select from range

  • Sunbelt Rentals

  • Select from range

  • Nationwide Fuels

  • K9 Security Protection Ltd

  • Select from range

  • AMA Waste

  • Select from range

  • HSE Executive/Environmental Health (EHO)

  • Select from range

  • Hire/Lease Breakdown Engineers

  • Select from range

2. Previous Inspection outstanding actions

  • Date and time of LAST inspection:

  • List of outstanding actions from LAST inspection

3. Main plant & work equipment in use on site

  • List main plant, equipment, tools observed being used during Inspection:

  • Have all the main plant be entered in the PSR-EHS-Form-06- Plant - Work Equipment - LOLER - Register

4. Description and Progress of the works activities taking place on site

  • Installing Perimeter Fence

  • What is the percentage progress of the Fence Works?

  • Installing internal roads & transformer base civils

  • What is the percentage progress of the internal roads & transformer base civils

  • Installing/removing main welfare & offices

  • What is the percentage progress of installing main welfare & offices?

  • Excavating trenches

  • What is the percentage progress of the trench excavating works?

  • Piling Main frame works

  • What is the percentage progress of the Piling Works?

  • Construction of framework

  • What is the percentage progress of the Framework Construction?

  • Installing Panels

  • What is the percentage progress of the

  • String Cable installations

  • What is the percentage progress of the String Cable Installation?

  • Installing HV cables

  • What is the percentage progress of the HV Cable Install?

  • Installing and connecting Combiner box or String Inverter installation

  • What is the percentage progress of the Combiner box or String Inverter install?

  • Installing Transformer / Transformer & Inverter Stations

  • What is the percentage progress of the Transformer /Transformer Stations?

  • General Commissioning

  • What is the percentage progress of the General Commissioning Works

  • Customer & DNO Building installation

  • What is the percentage progress of the Customer & DNO Building Install?

  • Are there any program blockers or know problems that may affect the program?

  • undefined

Deliveries

  • Numbers of deliveries by Friday of this week

  • Delivery of Structure Components

  • How many vehicles? Photograph each delivery note & any damaged goods

  • Delivery of PV Panels

  • How many vehicles? Photograph each delivery note & any damaged goods

  • Delivery of Cable

  • How many vehicles? Photograph each delivery note & any damaged goods

  • Delivery of Civils Material (Stone, Concrete, Rebar etc)

  • How many vehicles? Photograph each delivery note & any damaged goods

  • Delivery of Initial Welfare Components?

  • How many vehicles? Photograph each delivery note & any damaged goods

  • Delivery of Diesel Fuel

  • How many vehicles? Photograph each delivery note

  • Confirm the volume (litres) of Diesel Fuel delivered in total by 1200 Friday?

  • Delivery of Water

  • How many vehicles? Photograph each delivery note

  • Confirm the volume (litres) of water delivered in total by 1200 Friday?

  • Collection of Waste Water

  • How many vehicles? Photograph each delivery note

  • Collection or Delivery of skips?

  • How many vehicles? Photograph each delivery note

  • What was the contents of all the skips?

5. CDM Management

  • F10 expiry date

  • Burgate - F10 Notification - https://www.dropbox.com/scl/fi/5fqafh4pmtuq5m3ggh4sk/F10-Burgate-V1-Dec-2023-3b80fa0bf8.pdf?rlkey=xdzm0wfu3h69g9e8uaf7skyir&dl=0

  • CPP adhered to updated and all registers complete

6. Permit to Work & High Risk SSOW

  • 'Permit to Work' in place for high risk work

  • Have completed Permits to Work been correctly signed off

7. Risk Assessment & Method Statements (RAMS)

  • RAMS complete and approved for specific tasks/jobs

  • RAMS signed and complied with by all workers

8. Health and Welfare (Schedule 2 of L153)

  • Is or has the Weather forecast for High Winds or was there a serve storm?

  • Is/was the Site Secure to prevent waste blowing across/off site?

  • Is/was plant and equipment secure from causing damage?/

  • Has all damage been correctly recorded and identified? (include any trees on site)

  • Is the forecast for Extreme Hot Weather?

  • Has communications to all workers taken place?

  • Is there plenty of water on site?

  • Is the forecast for Extreme Cold Weather?

  • Has communications to all workers taken place?

  • Is all the heating operation throughout the welfare areas?

  • Is suitable PPE available for all workers?

  • Toilets in place - Clear and free from frozen pipes

  • Rest Facilities, Washing, Drying Room & Consumables all in place

  • Rest Facilities

  • Is drinking water, a method of heating food available

  • Washing facilities available

  • Hot & Cold water available

  • Changing & Drying Facilities available

  • All facilities maintained & Clean

9. PPE

  • Mandatory PPE worn & in good repair

  • Items of PPE mandatory worn on site

10. Slip, Trip & Falls Hazards

  • Clear walkways/safe access routes for pedestrians

  • Are all trailing cables protected

  • Are Steps/stairs safe to use

  • Working areas clear of major hazards

  • Are there hidden hazards on site suitably protected in place?

  • Are all trenches/excavations protected/ signage in place

11. Fire Safety

  • Are main fire routes clear of obstruction

  • Are assembly points prominent and clear

  • Are suitable fire extinguishers/ fire points available/tested/inspected

  • Is a method of raising the alarm in place

  • Describe the method of raising the alarm

  • Is storage of combustibles/flammables managed correctly

  • Are smoking/vaping arrangements in place

  • Is there evidence of smoking within buildings/structures (Welfare & Offices)?

  • Are fire procedures communicated/fire training/awareness/induction carried out

  • Is hot works permit in place

12. Information, Instruction and Training

  • Noticeboards with relevant information

  • Induction carried out for all site personnel/workers

  • Is a record of relevant toolbox talks available? List the last Toolbox talk undertaken.

  • List the last Toolbox Talk undertaken:

  • Where English is not the first language of personnel – is there appropriate information/instruction/training available

13. First Aid and Emergencies

  • First Aid facilities adequate + First Aiders/Appointed Persons

  • Have any accidents or incidents occurred since last inspection?

  • Have they all been correctly recorded on a PSR-EHS-Form-08-Accident Report Form https://www.dropbox.com/s/9212zglqc9mwhmj/PSR-EHS-Form-08-Accident%20Report%20Form.pdf?dl=0

  • Have serious accidents or incidents been correctly investigated PSR-EHS-Form-09- Accident and Incident Investigation Form V1.0? https://www.dropbox.com/s/cn3rmbu3ulzz95u/PSR-EHS-Form-09-%20Accident%20and%20Incident%20Investigation%20Form%20V1.0.pdf?dl=0

  • First Aid Boxes available & up to date

14. Site/Premises Housekeeping

  • Is general cleanliness and tidiness addressed

  • Are materials stacked and stored correctly

  • Appropriate safety signage for works on site

  • Appropriate safety signage in place on Spixworth Lane

15. Plant, Equipment and Tools

  • Are PSR & Contractors Pre start checklists available/complete (PS-EHS-Form-07 -General Site Vehicle Daily-Weekly Checklist) - (Burgate)

  • Photograph minimum of 5 checks this week

  • Is there safe storage for plant/equipment/tools

  • Operators correctly trained in use

  • Is plant observed being used correctly

  • Is there sufficient space for plant/equipment

  • Is all portable electrical equipment 110v

  • Is electrical equipment fit for use, check leads for damage or risk (Quarantine any damage articles)

  • Is relevant electrical equipment within the welfare PAT tested

  • Are correct ladders / steps being used (EN131/Class 1) and free from damage

  • Are portable towers being used (during Inspection)

  • Is the operator erecting the tower PASMA trained

  • Is fixed scaffolding being used (during Inspection)

  • Is a design and sign off certificate in place

  • Is a ScaffTag in place

  • Are cranes being used (during Inspection)

  • Is there a lifting plan/lifting RAMS in place

  • Has the Lifting log been checked

  • Is lifting equipment being used eg: chains, stropes, blocks n tackle (during Inspection)

  • Is details of the tackle/lifting equipmnent on the lifting register

  • Are operatives working at height (WAH) wearing harness

16. Environmental

  • Has the PSR-EHS-Form-18 - Site CO₂ Footprint & Water Consumption Form been completed to cover all deliveries of Diesel, Petrol & Water?

  • Waste correctly segregated/stored

  • Are waste consignment notices available in the CPP, photograph consignment notices

  • Spill kits in place and are operators trained in use of spill kits

  • Evidence of spillages/ground contamination

  • Are waterways clear of all contamination

17. Others elements related to the site

  • Have any complaints been recorded in accordance with Noise and Dust Plan? https://www.dropbox.com/scl/fi/kbw3ocm2b0v1r5qe5e4cl/Noise-Dust-Management-Plan-Burgate-PV-Solar-Farm-NR10-3BX-v0.4-15-09-2023.pdf?rlkey=dkmyms6x2xhhfvxnesrmvtghn&dl=0

  • Are noisy activities identified during inspection?

  • Are there dusty activities that have cause for concern?

  • Are any other external activities interfering with site operations

18. Security

  • Have there been any security breaches or incidents on site?

  • Give details and take photos

19. Details of White/Yellow/ Red Card Issued

  • Were any WHITE cards issued since last inspection

  • Give details of WHITE card(s) issued

  • Were any YELLOW cards issued since last inspection

  • Give details of YELLOW card(s) issued

  • Were any RED cards issued since last inspection

  • Give details of RED card(s) issued

20. Other comments to be noted and photographs taken

  • Observations related to the construction - this information is purely observations that have been brought to the attention of the Project Manager

  • General Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.