Title Page
-
Site - Burgate PV Solar Farm (21.00 MWp)
-
Location - Spixworth Road, Norwich. Norfolk NR10 3BX - Site Entrance: ///opens.sounds.digs
-
Burgate PV Solar Farm Directions for Deliveries v1.0 - https://www.dropbox.com/scl/fi/txzjsuvpmuppje19seu5g/Burgate-Directions-1.0-04-08-2023.pdf?rlkey=igi0fof473wtym9qz13lw4v7r&dl=0
-
Date and time of THIS inspection:
-
Inspected by:
-
Signature
Construction Site Inspection
1. Personnel on site
-
Record the sign in sheets (Initial & date sheets)
-
Chris Sibley Groundworks Ltd
-
PV. GA Limited
-
Kampai Solar Ireland Ltd (Matoska)
-
RTS Total Solutions
-
Sunbelt Rentals
-
K9 Security Protection Ltd
-
AMA Waste
-
HSE Executive/Environmental Health (EHO)
-
Hire/Lease Breakdown Engineers
2. Previous Inspection outstanding actions
-
Date and time of LAST inspection:
-
List of outstanding actions from LAST inspection
- Installing perimeter fencing
- Installing internal roads & Civils
- Installing/removing main welfare & offices
- Excavating trenches
- Piling Main frame works
- Construction of framework
- Installing Panels
- String Cable installations
- HV cable install
- Combiner box installation
- Inverter installation
- Transformer installation
- Commissioning
- General construction works
- Customer & DNO Building installation
3. Main plant & work equipment in use on site
-
List main plant, equipment, tools observed being used during Inspection:
- Excavators, 5T, 10T, Tracked
- Telehandlers
- Dumper Trucks
- Piling Machines
- Buggies
- Tractors
- Quad Bikes
- Rollers
- Trench Wackers
- Cranes
- Cable Winches
-
Have all the main plant be entered in the PSR-EHS-Form-06- Plant - Work Equipment - LOLER - Register
4. Description and Progress of the works activities taking place on site
-
Installing Perimeter Fence
-
Installing internal roads & transformer base civils
-
Installing/removing main welfare & offices
-
Excavating trenches
-
Piling Main frame works
-
Construction of framework
-
Installing Panels
-
String Cable installations
-
Installing HV cables
-
Installing and connecting Combiner box or String Inverter installation
-
Installing Transformer / Transformer & Inverter Stations
-
General Commissioning
-
Customer & DNO Building installation
-
Are there any program blockers or know problems that may affect the program?
-
undefined
Deliveries
-
Delivery of Structure Components
-
Delivery of PV Panels
-
Delivery of Cable
-
Delivery of Civils Material (Stone, Concrete, Rebar etc)
-
Delivery of Initial Welfare Components?
-
Delivery of Diesel Fuel
-
Confirm the volume (litres) of Diesel Fuel delivered in total by 1200 Friday?
-
Delivery of Water
-
Collection of Waste Water
-
Collection or Delivery of skips?
-
What was the contents of all the skips?
5. CDM Management
-
F10 expiry date
-
Burgate - F10 Notification - https://www.dropbox.com/scl/fi/5fqafh4pmtuq5m3ggh4sk/F10-Burgate-V1-Dec-2023-3b80fa0bf8.pdf?rlkey=xdzm0wfu3h69g9e8uaf7skyir&dl=0
-
CPP adhered to updated and all registers complete
6. Permit to Work & High Risk SSOW
-
'Permit to Work' in place for high risk work
-
Have completed Permits to Work been correctly signed off
7. Risk Assessment & Method Statements (RAMS)
-
RAMS complete and approved for specific tasks/jobs
-
RAMS signed and complied with by all workers
8. Health and Welfare (Schedule 2 of L153)
-
Is or has the Weather forecast for High Winds or was there a serve storm?
-
Is/was the Site Secure to prevent waste blowing across/off site?
-
Is/was plant and equipment secure from causing damage?/
-
Has all damage been correctly recorded and identified? (include any trees on site)
-
Is the forecast for Extreme Hot Weather?
-
Has communications to all workers taken place?
-
Is there plenty of water on site?
-
Is the forecast for Extreme Cold Weather?
-
Has communications to all workers taken place?
-
Is all the heating operation throughout the welfare areas?
-
Is suitable PPE available for all workers?
-
Toilets in place - Clear and free from frozen pipes
-
Rest Facilities, Washing, Drying Room & Consumables all in place
-
Rest Facilities
-
Is drinking water, a method of heating food available
-
Washing facilities available
-
Hot & Cold water available
-
Changing & Drying Facilities available
-
All facilities maintained & Clean
9. PPE
-
Mandatory PPE worn & in good repair
-
Items of PPE mandatory worn on site
10. Slip, Trip & Falls Hazards
-
Clear walkways/safe access routes for pedestrians
-
Are all trailing cables protected
-
Are Steps/stairs safe to use
-
Working areas clear of major hazards
-
Are there hidden hazards on site suitably protected in place?
-
Are all trenches/excavations protected/ signage in place
11. Fire Safety
-
Are main fire routes clear of obstruction
-
Are assembly points prominent and clear
-
Are suitable fire extinguishers/ fire points available/tested/inspected
-
Is a method of raising the alarm in place
-
Describe the method of raising the alarm
-
Is storage of combustibles/flammables managed correctly
-
Are smoking/vaping arrangements in place
-
Is there evidence of smoking within buildings/structures (Welfare & Offices)?
-
Are fire procedures communicated/fire training/awareness/induction carried out
-
Is hot works permit in place
12. Information, Instruction and Training
-
Noticeboards with relevant information
-
Induction carried out for all site personnel/workers
-
Is a record of relevant toolbox talks available? List the last Toolbox talk undertaken.
-
List the last Toolbox Talk undertaken:
-
Where English is not the first language of personnel – is there appropriate information/instruction/training available
13. First Aid and Emergencies
-
First Aid facilities adequate + First Aiders/Appointed Persons
-
Have any accidents or incidents occurred since last inspection?
-
Have they all been correctly recorded on a PSR-EHS-Form-08-Accident Report Form https://www.dropbox.com/s/9212zglqc9mwhmj/PSR-EHS-Form-08-Accident%20Report%20Form.pdf?dl=0
-
Have serious accidents or incidents been correctly investigated PSR-EHS-Form-09- Accident and Incident Investigation Form V1.0? https://www.dropbox.com/s/cn3rmbu3ulzz95u/PSR-EHS-Form-09-%20Accident%20and%20Incident%20Investigation%20Form%20V1.0.pdf?dl=0
-
First Aid Boxes available & up to date
14. Site/Premises Housekeeping
-
Is general cleanliness and tidiness addressed
-
Are materials stacked and stored correctly
-
Appropriate safety signage for works on site
-
Appropriate safety signage in place on Spixworth Lane
15. Plant, Equipment and Tools
-
Are PSR & Contractors Pre start checklists available/complete (PS-EHS-Form-07 -General Site Vehicle Daily-Weekly Checklist) - (Burgate)
-
Photograph minimum of 5 checks this week
-
Is there safe storage for plant/equipment/tools
-
Operators correctly trained in use
-
Is plant observed being used correctly
-
Is there sufficient space for plant/equipment
-
Is all portable electrical equipment 110v
-
Is electrical equipment fit for use, check leads for damage or risk (Quarantine any damage articles)
-
Is relevant electrical equipment within the welfare PAT tested
-
Are correct ladders / steps being used (EN131/Class 1) and free from damage
-
Are portable towers being used (during Inspection)
-
Is the operator erecting the tower PASMA trained
-
Is fixed scaffolding being used (during Inspection)
-
Is a design and sign off certificate in place
-
Is a ScaffTag in place
-
Are cranes being used (during Inspection)
-
Is there a lifting plan/lifting RAMS in place
-
Has the Lifting log been checked
-
Is lifting equipment being used eg: chains, stropes, blocks n tackle (during Inspection)
-
Is details of the tackle/lifting equipmnent on the lifting register
-
Are operatives working at height (WAH) wearing harness
16. Environmental
-
Has the PSR-EHS-Form-18 - Site CO₂ Footprint & Water Consumption Form been completed to cover all deliveries of Diesel, Petrol & Water?
-
Waste correctly segregated/stored
-
Are waste consignment notices available in the CPP, photograph consignment notices
-
Spill kits in place and are operators trained in use of spill kits
-
Evidence of spillages/ground contamination
-
Are waterways clear of all contamination
17. Others elements related to the site
-
Have any complaints been recorded in accordance with Noise and Dust Plan? https://www.dropbox.com/scl/fi/kbw3ocm2b0v1r5qe5e4cl/Noise-Dust-Management-Plan-Burgate-PV-Solar-Farm-NR10-3BX-v0.4-15-09-2023.pdf?rlkey=dkmyms6x2xhhfvxnesrmvtghn&dl=0
-
Are noisy activities identified during inspection?
-
Are there dusty activities that have cause for concern?
-
Are any other external activities interfering with site operations
18. Security
-
Have there been any security breaches or incidents on site?
-
Give details and take photos
19. Details of White/Yellow/ Red Card Issued
-
Were any WHITE cards issued since last inspection
-
Give details of WHITE card(s) issued
-
Were any YELLOW cards issued since last inspection
-
Give details of YELLOW card(s) issued
-
Were any RED cards issued since last inspection
-
Give details of RED card(s) issued
20. Other comments to be noted and photographs taken
-
Observations related to the construction - this information is purely observations that have been brought to the attention of the Project Manager
-
General Comments