Title Page
-
Document No.
-
Audit Title
-
Client / Site
1. Site information & procedures
-
Select date
-
Site : lot
-
Stage :
-
Single / Double
-
Builders site sign clearly displayed & up to date
-
1. Site information & procedures
-
Are site specific hazards listed on the site sign (eg : overhead power lines, underground services)
-
Site signage appropriate displayed (eg : Fencing, No Smoking, Alfresco Waste)
-
Do trades have a SWMS for high risk works and working in accordance with their SWMS; (site specific)
-
If overhead power in place, are No Go Zones procedures in place
-
If high volume traffic area, are traffic management procedures in place
-
Have all persons on site signed into and completed the Trade Safety Pack (supplier trade)
-
Are all trades carrying their Trade Safety Pack
-
Is noise control adequately managed to minimise impact to neighbours (signage displayed)
-
Does all personnel have a construction industry induction card
2. Site Condition / Housekeeping
-
2. Site Conditions / Housekeeping
-
Cross over installed and maintained (if required)
-
Is the site "Trade Ready" for the next person
-
Perimeter fencing appropriately installed and maintained (Gates closed if no trades at site)
-
Slab back fill completed (Level free from slip & trip hazards)
-
Is there adequate silt control on site , eg : Silt barriers
-
Is the site bin provided , accessible and not overflowing
-
Clear access into site, front door and around house
-
Clear access to water tap
-
Is adequate crush rock in place
-
Clear interior
-
Clear exterior (Clear zone around perimeter of construction)
-
Are the driveways, footpaths, and nature strips clear of materials
-
Is the building rubbish separated and in its allocated piles (if applicable)
-
Is the toilet clean accessible and in correct operating condition with toilet paper
-
METERBOX.......
-
Select date
3. Working at heights & Hanging Bracket Scaffold (for modular scaffold refer to specific scaffold checklist)
-
3. Working at heights & Hanging Bracket Scaffold (For modular scaffold refer to specific scaffold checklist)
-
Are falls from heights adequately controlled
-
Is mobile scaffold safe, compliant, with all rails in place and have access ladder if over 2 meters
-
Scaffold have identified access and egress point to hanging bracket scaffold and roof area?
-
Is the scaffold certificate in place and signed off (e.g.. Scaffold tag/Compliance certificate)
-
Are the mid rails, top rails, kick boards and lap boards of the scaffold in place
-
Are the scaffold decks clear of rubbish
-
Void protection (High Risk) :
-
Is void protection in place with certificate
-
Is the void cover down whilst working on the 1st floor
-
Roof Guard Rail and Condition & Access (High Risk)
-
Are tilers installing tiles on the roof with no other people below roof area and drop zone
-
Roofs guard railing is in place for all roof work
-
Roof guard rail has identified access points
-
Does the balcony have guard rail installed
-
Do all openings above 2m have guard railing e.g. Windows , balcony openings
-
Does the balcony and alfresco have sufficient structural support
-
Ladders (High Risk)
-
Are ladders in good condition with no damaged steps, fully open and of 1:4 vertical ratio
-
Ladders secure/tied off / when accessing heights ladders extend 900mm past roof line
-
Industrial grade ladders minimum 120kg
-
Are trades working off step ladders safely e.g. Not standing on the top step, fully open position
-
Are step ladders being used near open voids or second storey edges
4. Items of Plant & Trenches (High Risk Works)
-
4. Items of Plant & Trenches (High Risk Works)
-
Do operators have licences for excavators , skid steer, forklift, crane, boom pumps, spotters, riggers, dog men
-
Is the pre-start checklist & SWMS completed for the item of mobile plant
-
Warning devices working (reverse beepers, flashing lights, horn)
-
Does the plant look fit for purpose or use e.g. Earthmover quick hitches secured/pinned
-
Are screw pile holes and piers covered if not poured
-
Large exposed trenches have fencing/barrier in place
-
Is traffic management required
5. Electrical Tools & Equipment
-
5. Electrical Tools & Equipment
-
Site meter box RCD been tested monthly and main fuse locked & door closed
-
If generator is used it should have an RCD fitted and not used indoors or in confined space
-
Electrical equipment (leads and tools) tested and tagged every 3 months and in date
-
Are electrical leads exiting through the bottom of the meter box?
-
Are electrical leads raised up where practical
-
Leads to be no longer than 25 meters and in good working condition
-
Equipment guarding in place (e.g. Drop saw/circular saw)
-
Portable power outlets used and tested monthly
6. Trades
-
6. Trades
-
Does the trade have an adequate first aid kit
-
Are trades working sun smart
-
Chemical used by trade have MSDS(material safety data sheets)
-
General Comments :
-
Hi-visibility vest
-
Hat
-
Suncreen
-
Sun protective clothing
-
Hard hat
-
Safety boots
-
Eye protection
-
Hearing protection
-
Dust mask
Safety chat / ponts raised
-
Safety chat / points raised
-
Subject of talk :
Person present during discussion
-
Person present during discussion :
-
Trade :
-
Have you eliminated all potential risks from any other hazards identified on site that may affect work tasks?