  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Site Information & Procedures

  • Is the correct construction sign visible and completed correctly?

  • Are site specific hazards highlighted on the sign e.g.: overhead power lines, gas lines/open trenches etc.

  • Have trades/suppliers onsite been inducted and are operating within the parameters of their SWMS?

  • Are fall from heights adequately controlled?

  • Are site fall hazards (e.g retaining walls) controlled and identified on site sign or SWMS?

  • Have all persons on site completed the Sienna Homes induction process or signed the sign in book?

  • Are site induction records up to date?

Site Conditions/Housekeeping

  • Cross over appropriately installed and maintained?

  • Is the site "trade ready"?

  • Perimeter fencing installed and maintained correctly?

  • Slab backfill completed?

  • Is a site bin provided, accessible and emptied regularly?

  • Clear access to front door and around the site?

  • Are the driveways , footpaths and naturestrips clear of materials?

  • Is the toilet clean, operational and accessible?

Hanging Bracket Scaffold & Working at Heights

  • Scaffold has identified access & egress point to hanging bracket scaffold and roof area?

  • Is the scaffold certificate in place and signed off?

  • Are the mid rails, top rails, kick boards and lap boards off the bracket scaffold in place?

  • Are the scaffold decks clear of materials and debris?

  • Clear access to entry point for ladder?

Void Protection (High Risk)

  • Is the void protection in place with certificate? (To be installed prior to 1st floor walls & flooring)

  • Is the void cover down whilst works occur on the 1st floor?

Roof Guard Rail Condition & Access (High Risk)

  • Is there a barricaded drop zone for roof tiler spoils?

  • Is the area clear of tradespeople under the roof tilers?

  • Has the roof guard rail been installed for roof work?

  • Does the roof guard rail have at least 2 identified access points?

  • Is the balcony guard rail installed? (as required)

  • Are all window openings above 2m high barricaded with timber or rails?

  • Does the balcony/Alfresco have sufficient structural support?

Ladders (High Risk)

  • Ladders in good working condition, fully open and of 1:4 vertical ratio?

  • Ladders secure/tied off/when accessing heights ladders to extend 900mm past roof line?

  • Only Industrial grade ladders to be used (minimum 120kg)

  • Ladders not to be used on balcony's or close to edges unless guards are in place.

Items of Plant & Trenches (High risk)

  • Works requiring licensed operators (excavators, skid steer, forklifts, crane, boom pumps, spotters, riggers/dogmen)

  • Is the pre-start checklist & SWMS completed for the required works and mobile plant?

  • Warning devices operational (reverse beepers, flashing lights & horn?)

  • Is pedestrian traffic allowed for in making the site safe? (Install bollards or temp fence around machine access area to divert pedestrians)

  • Does the plant look fit for purpose or use e.g: Earthmover quick hitches secured/pinned?

  • Are the exposed screw pile holes/piers covered or barricaded to prevent falls?

  • Large exposed trenches have fences/barriers in place? (Trenches in excess of 1.5m deep need to be battered or shored up.)

  • Soil piles to be located a minimum of 1m from edge of trench.

Electrical Tools & Equipment

  • Site meter box RCD has been tested monthly/ main fuse locked and door closed? (Must be tested prior to first use of installation)

  • If a generator is used it should have a RCD fiited and not used indoors or confined space (fumes)

  • Electrical equipment (leads & tools) tested & tagged every 3 months and in date. RCD monthly

  • Are electrical leads exiting through the bottom of the meter box?

  • Are electrical leads raised up where practical and minimum 15amp leads (1.5mm)?

  • Leads to be no longer than 25 metres and in good working condition (no exposed wires and not doubled up)

  • Equipment has required guarding in place (e.g: Drop saw/circular saws)

  • Drop saw and grinders have blade guards in place?

Trades

  • Does the trade have an adequate first aid kit and is first aid trained?

  • Are the trades working sun smart?

  • Is the incident register up to date?

  • Chemicals/materials used by the trade have MSDS?

Personal Protection Equipment (PPE)

  • Appropriate footwear for the task being worm?

  • Sunscreens is available and is being used?

  • Eye protection is being worn as required?

  • Hearing protection is being worn as required?

  • Dust mask is being worn as required?

  • Hat (hard hat) is being worn as required?

Safety Chat / Points Raised

  • Involve the trade during the inspection process & discuss safety concerns contributed by the tradesperson.

  • Subject of talk

Person Present During Discussion/Site Inspection

  • Name -

  • Name -

  • Name -

  • Name -

undefined

  • Have you eliminated all potential risks from any other hazards identified on site that may affect work tasks?

NOTES

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.