Title Page
-
Site conducted -Address
undefined
-
-
-
Conducted on
-
Prepared by
-
Location
-
Country
-
Signature
-
Nearest Hospital
-
Company (if subcon)
-
Document Number
-
Main Activity
-
Sub-Activity
SCTION 1: PRE-BORING CHECKS
-
1. Equipment Maintenance: Is the boring equipment properly maintained and functional?
-
2. HDD Inspection: Are HDDs checked for damage or malfunction before boring?
-
3. Employee Training: Are employees properly trained in the use of boring equipment?
-
4. PPE: Is personal protective equipment (PPE) used during the boring process?
SECTION 2: SITE PREPARATION
-
1. Locate Ticket: Is the locate ticket checked before starting work, using both the 811 tool to verify and physical inspection of marked utilities?
-
2. Grounding: Is the HDD machine grounded?
-
3. Traffic Control: Are traffic signs installed every 500 feet on both sides of the road?
-
4. Utility Potholes: Are all utilities potholed before starting work?
Section 3: SAFETY & COMPLIANCE
-
1. Rubber Mates: Are rubber mates available for the drill?
-
2. Metronet Sign: Is a Metronet sign on every truck?
-
3. Truck Parking: Is the truck parked properly with a safety cone?
-
4. Employee Attire: Do all employees wear helmets and safety vests during work?
-
5. Metronet ID: Is the Metronet ID card visible?
SECTION 4: POST DRILLING SAFETY PROCEDURES
-
1. Is the site cleaning is done after completing of daily activity?
-
2. Is te installed utility line is inspected to ensure it is properly buried?
-
3. Is the site is restored to its original condition?
-
4. Is the area sfe for public access?
SECTION 5: GENERAL CHECKS
-
1. Is all control measures are adopted to protect both workers and the public?
-
2. Is emeregncy plan is made and all team members are fully convrsant how to respond to emerrgencies?
-
3. Is emergency contacts numbers are readily available?
-
4. Is site is checked and verfied for any hazardous material?