Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Country

  • Auditor Signature

  • Have you checked Nearest Hospital

  • Document Number

  • Operator Name

  • Locator Name

  • Activity

SCTION 1: PRE-BORING CHECKS

  • 1. Equipment Maintenance: Is the boring equipment properly maintained and functional?

  • 2. HDD Inspection: Are HDDs checked for damage or malfunction before boring?

  • 3. Employee Training: Are employees properly trained in the use of boring equipment?

  • 4. PPE: Is personal protective equipment (PPE) used during the boring process?

SECTION 2: SITE PREPARATION

  • 1. Locate Ticket: Is the locate ticket checked before starting work, using both the 811 tool to verify and physical inspection of marked utilities?

  • 2. Grounding: Is the HDD machine grounded?

  • 3. Traffic Control: Are traffic signs installed every 500 feet on both sides of the road?

  • 4. Utility Potholes: Are all utilities potholed before starting work?

Section 3: SAFETY & COMPLIANCE

  • 1. Rubber Mates: Are rubber mates available for the drill?

  • 2. Metronet Sign: Is a Metronet sign on every truck?

  • 3. Truck Parking: Is the truck parked properly with a safety cone?

  • 4. Employee Attire: Do all employees wear helmets and safety vests during work?

  • 5. Metronet ID: Is the Metronet ID card visible?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.