Title Page
-
Site conducted
-
Client / Site
-
Conducted on
-
Prepared by
-
Name(s) of Person(s) Participating in Inspection:
-
Location
-
Number of Employees on Site
General
-
Supervisor / Foreman at time of this inspection
-
Select site weather conditions at time of this inspection (select all that apply)
- Clear Sky
- Cloudy
- Raining
- Windy
- Hazy
- Snow / Hail
- OTHER
-
Describe weather conditions on site today
-
Minimum temperature today?
-
Maximum temperature today?
-
Current activities being undertaken on site (select all that apply)
- Asbestos Abatement
- Abrasive Blasting
- Cleanup
- Coatings
- General
- Insulation
- Lead Removal
- OTHER
- Scaffolding
- Siding
-
Describe activity being undertaken on site
Site Safety Inspection
Administrative / General Inspection
-
Is Administrative/General Inspection to be conducted during this audit?
-
Federal and State Posters are posted and up to date.
-
Daily/Weekly Safety Meetings documented.
-
Supervisor Safety Inspections are being conducted throughout the week.
-
JHA/JSA are completed for each task and reviewed daily.
-
Accident reporting procedures established and followed.
-
Near Miss reporting procedures established and followed.
-
Emergency phone numbers and evacuation procedures posted.
-
Do all employees know what to do in an emergency.
-
BBP and First Aid kit available and adequately stocked for workplace manpower.
-
Is a local hospital and medical clinic identified for the project site.
-
Monthly/Quarterly Equipment Inspections completed (Color Tape).
-
Scaffold log available and up to date.
-
Work areas properly signed/barricaded.
-
Sign In/Out Log completed and accurate.
-
OSHA 300 Summary Posted (Feb. 1 – Apr.1).
-
Safety violations documented and reported.
-
Drinking water is available.
-
Sanitary facilities available.
Housekeeping
-
Is housekeeping to be inspected during this audit?
-
General housekeeping is neat and orderly
-
Break/Lunch areas are clean and neat. All personal items are stored properly.
-
Are waste receptacles provided for waste and are they emptied regularly.
-
Material is stored neatly in a secure storage area.
-
Materials stored away from unprotected edges.
-
Scrap materials have been removed or stacked in an orderly fashion.
-
Scrap materials are not creating a slip/trip/fall hazard (i.e. clear aisles and stairs)
-
Waste is disposed of in appropriate containers.
-
Nails and other hazards have been removed from lumber and other unused materials.
-
No spills of liquid materials are creating a slip/trip/fall hazard.
-
Work areas have the appropriate amount of lighting.
Fire Prevention
-
Is fire prevention being inspected during this audit?
-
A portable fire extinguisher is in close proximity to all working areas.
-
Fire extinguishers located in an accessible location with 3’ of clearance.
-
Sufficient fire extinguishers provided, of the correct type.
-
Fire extinguishers inspected monthly and documented.
-
Fire extinguisher have documented annual inspection.
-
Exits marked/accessible.
-
Flammable and combustible materials are properly stored and labeled.
-
Are NO SMOKING signs posted where needed.
-
Flammable and combustible substances are safely stored and labeled in approved safety cans/cabinets.
-
Flammable material containers are properly bonded when transferring liquids.
-
Soiled or combustible rags are stored and disposed of properly.
-
Fuel supplies protected from accidental impact.
-
Flammable and combustible materials are stored a safe distance from heat generating equipment.
-
Intrinsically safe tools and equipment used in hazardous areas.
Personal Protective Equipment/PPE
-
Is Personal Protective Equipment/PPE to be inspected during this audit?
-
Proper equipment available for existing or potential hazards.
-
Safety supplies adequate for job manpower.
-
Employees issued appropriate PPE for assigned tasks.
-
Eye and face protection available and utilized (i.e. safety spoggles, face shield)
-
Hearing protection available, utilized and properly maintained
-
Hand protection available, utilized and properly maintained
-
Hard hats available, utilized and properly maintained
-
Appropriate clothing worn by employees (No synthetic materials).
-
Foot Protection worn as required by all employees (No synthetic materials).
Respiratory Protection
-
Is Respiratory Protection to be inspected during this audit?
-
Respirators available, maintained, and stored properly.
-
Respirators and cartridges appropriate for the hazard.
-
Employees have fit test, respirator training and clearance.
-
CO generating equipment is used in well ventilated areas to avoid CO build up.
Abrasive Blasting
-
Is Abrasive Blasting to be inspected during this audit?
-
Operators have abrasive blasting and silica trainings.
-
Equipment hoses are not creating a tripping hazard.
-
Hose couplings have lock pins and whipcheck.
Fall Protection
-
Is Fall Protection to be inspected during this audit?
-
Wall and floor openings are covered/guarded and marked appropriately.
-
Adequate fall protection provided and utilized at > 4ft. (100% tie off required on all scaffold)
-
Personal fall arrest systems are in good conditions and suitable for use.
-
Fall protection equipment inspected quarterly and documented.
-
Appropriate anchorage locations are utilized.
-
Appropriate fall protection devices available and used for work being performed.
Hand Tools/Power Tools
-
Hand Tools/Power Tools to be inspected during this audit?
-
Tools stored in a secure location and maintained in an orderly fashion.
-
All hand and power tools properly maintained.
-
All guards and safety devices in place and operational.
-
Correct tools available and utilized for the job.
-
Inoperable/Unsafe tools are destroyed or tagged and repaired.
-
All tools are inspected before use.
-
Electrical power tools are double insulated or properly grounded.
-
Electrical tools, plugs, cords, and receptacles are inspected prior to use.
-
Powder actuated tools (PAT's) are unloaded while not in use.
-
Operators of PAT’s are trained.
-
Charges are properly stored and disposed of.
Electrical Safety
-
Electrical Safety to be inspected during this audit?
-
GFCI’s are available/maintained/utilized.
-
Temporary lights are equipped with guards
-
Electrical cord wiring is appropriately sized.
-
Electrical cords strung so they do not hang on pipes, nails, hooks, etc.
-
Energized panels/device outlets are covered.
-
Electrical panel has at least 3' of unobstructed frontal space.
-
Damaged electrical cords are removed from use.
-
Only authorized employees conduct LOTO.
-
LOTO procedures followed prior to working on equipment which may contain hazardous energy.
-
Locks & tags are identifiable to each employee
-
Locks & tags are standardized
-
Group lock boxes available for group LOTO.
-
Sub sheets utilized for group TagOut in PowerGen facilities.
-
Only authorized employees attach locks & tags.
-
Locks and tags are removed by the owner of the lock.
-
Authorized and affected employees verify isolation and tag prior to beginning work.
Company Vehicles/Powered Industrial Trucks
-
Are Company Vehicles/Powered Industrial Trucks to be inspected in this audit?
-
Equipment and vehicles are parked so as to prevent the release of stored energy.
-
Equipment and vehicles are maintained in good working order.
-
Seatbelts are available and in use by all operators and passengers.
-
All weight limit tags are in place, legible, and observed.
-
Current licenses maintained for all vehicle drivers on or off road.
-
Equipment and vehicle operators are trained and possess an operators permit.
-
Spotters are used as conditions deem it necessary.
-
Mobile equipment and vehicles are inspected before each use.
-
Speed limits, local/state/site, vehicle regulations observed.
-
Equipment powered off prior to refueling.
HAZCOM/Right to Know
-
Is HAZCOM/Right to Know to be inspected in this audit?
-
Written program available.
-
SDS for all Incorp & client supplied materials on file and readily available.
-
Materials properly stored and labeled.
-
Spill kits available.
-
Emergency eyewash and/or shower units provided/accessible.
Ladders
-
Are ladders to be inspected in this audit?
-
Ladders inspected, in good condition, and properly stored.
-
Ladders are of appropriate duty rating and size for the task.
-
Ladders used properly.
-
No stepping on top two rungs of stepladder.
-
Secured with proper slope (4 to 1 ratio).
-
Ladders extend at least 36” above top of landing.
-
Step ladders fully opened when in use.
-
No metal or wooden ladders.
-
No painted ladders.
-
All labels and decals legible.
Scaffold
-
Are scaffolds to be inspected in this audit?
-
Erection, Dismantling, and Modification properly supervised
-
All workers properly trained.
-
All structural members free from defects.
-
All connections are pinned or fastened securely.
-
Scaffolds have secure foundations with mud sills, base plates, and screw jacks.
-
Scaffolds plumb and square with proper cross bracing.
-
Guardrails, midrails, and toe boards in place.
-
All working-level platforms fully planked/decked.
-
Scaffolds tied, guyed, or braced where appropriate.
-
Maintains safety factor of 4 to 1.
-
All platforms at least 18” wide or protected by guardrail system or PFAS.
-
Open sides of scaffold less than 14” form the face of the work or PFAS in use.
-
Platforms properly constructed with scaffold grade lumber/planks.
-
Scaffold levels are being completed as the scaffold is erected.
-
Properly loaded.
-
Safe access provided and adequate.
-
Ladders have a rest platform and break at ≤ 27’.
-
SRL’s are provided for ladder access ≥ 10’ above a lower level or where an employee could fall into dangerous equipment.
-
Rolling scaffolds properly secured/positioned.
-
Workers prohibited from riding rolling scaffolds.
-
Competent person has inspected scaffold prior to each shift scaffold is in use.
-
Scaffold tag displayed at every point of access.
-
Working areas free of debris, snow, ice, grease, etc.
Confined Space
-
Is confined space to be inspected in this audit?
-
Proper permits executed, posted, and retained.
-
Pre-entry requirements met (i.e. air monitoring, cleaning, purging, etc.).
-
Personnel involved in CS operations are properly trained.
-
All entrants are wearing a PFAS harness.
-
Continuous air monitoring being performed and documented.
-
Sign In/Out sheet in use.
-
Emergency procedure and phone numbers documented.
-
Attendant in present and performing monitoring from outside.
-
Communication.
-
Integrity of confined space maintained.
-
Procedures for prompt rescue identified.
Hazardous Material Operations
-
Is Hazardous Material Operations to be inspected in this audit?
-
Properly supervised by a Competent Person.
-
Training, licenses, and medical surveillance maintained.
-
Supervisor’s daily log maintained.
-
All required permits/notifications executed and retained.
-
Waste is adequately wet, properly bagged, labeled, and promptly removed from work area.
-
Waste containers are secured, lined, and labeled.
-
Waste manifests are maintained.
-
Containments properly constructed.
-
Warnings and barricades in place.
-
Containment security maintained.
-
Appropriate work practices and engineering controls in use.
-
Appropriate PPE available and in use.
-
Decon areas properly constructed, maintained, sanitary.
-
Exposure monitoring being conducted where necessary.
Welding and Cutting
-
Is welding and cutting to be inspected in this audit?
-
Properly stored, inspected, and maintained.
-
Are only authorized, trained personnel permitted to use such equipment.
-
Full cylinders segregated from empty cylinders.
-
Welding hoses and cords maintained in good condition.
-
Proper PPE available and in use.
-
Electrical equipment properly grounded.
-
Hot work permits in use.
-
Fire watch is use during and after hot work activities
-
Tools being used properly.
-
Gas cylinders secured and upright.
-
Fuel gas and oxygen stored separately.
-
Flow gauges and regulators maintained and removed when not in use.
-
Torches have flash back arrestors.
-
Cylinders capped when not in use.
-
Cutting tools maintained in good condition.
Hoists/Rigging
-
Are Hoists/Rigging to be inspected in this audit?
-
Properly stored, inspected, and maintained.
-
Proper equipment available and in use.
-
Hoists used properly.
-
Personnel have training for the equipment being used.
-
Correct rigging procedures followed (i.e. barricade in place, away from suspended load).
-
Tag line in use.
General Comments
-
Any further comments or recommendations arising from this inspection?
-
Add any additional relevant photos
-
Have all required corrective actions been added as Actions to this inspection?
-
Please add any corrective actions to the appropriate questions above before completing this report
Sign Off
-
Name & Signature of Inspector
-
Name & Signature of Site Supervisor / Foreman