General
-
Escorted by
-
Number of operative on site
Site setup and welfare
Signage and Information
-
F10 displayed and correct
-
HSE information poster
-
Insurances displayed
-
Site rules displayed
-
Comments
Entrance
-
Is gate closed/managed at all times
-
Signage relevant, suitable and sufficient
-
Route to site office free of trip hazards, segregated and kept clear
-
Are visitors and unauthorised persons prevented from accessing working areas
-
Where site signage beyond the site boundary, is post mounted, is it set at least 2.3m above ground level and is all other signage located so as not to cause obstruction?
-
Comments
Location and maintenance of site compound
-
General access and site tidiness maintained in good condition
-
Diesel/oil/fuel safely stored and bunded to 110% where required
-
Waste skip location safe access and use
-
Disposal of site generated effluent and waste water controlled
-
Disposal of waste generated by operatives adequate and controlled
-
Spill kit on site, accessible and fully stocked
-
Materials safely stacked and stored
-
Comments
Security, protections of public and site users
-
Are dangerous substances securely stored
-
Are safe access routes provided and maintained, can everyone safely reach their place of work
-
Are all relevant areas provided with appropriate measures to prevent falls
-
Are all work areas and access routes adequately lit
-
Are there proper arrangements for the collection and storage of waste to prevent increased risk
-
Where temporary stairs are in use are measures in place to prevent unauthorized access
-
Is the site securely fenced/hoarded to prevent unauthorised access
-
Are gate/s locked at the end of each shift
-
Are ladders removed or boarded at end of the working day (made unusable)
-
Are excavations and openings covered or fenced off
-
Is safety signage adequate
-
Comments
Welfare
-
Are there suitable lockable facilities for the storage of PPE and clothing
-
Are there suitable facilities to enable the washing of hands, forearms and face including the provision of warm water, soap and towels
-
Are toilets suitable and sufficient with separate rooms for men and women (room, not cubicle). Is facility well lit, clean and ventilated with adequate washing facilities in or immediately adjacent to them
-
Are there suitable rooms for changing and drying clothing where the nature of the work dictates. (separate rooms for male and female)
-
Are there clean heated and ventilated rest facilities including seating, food preparation areas, potable water supply and means of heating food
-
Comments
Site Administration
Construction Phase Plan
-
Available on site?
-
Is construction phase plan updated as work proceeds?
-
Are appropriate risk assessments and method statements on site?
-
Are RAMS updated as works proceed
-
Are procedures in place to brief operatives on safe working practices?
-
Are COSHH data and assessment sheets in place for all relevant work and products?
-
Existing health and safety file for premises available on site? If appropriate
-
Details of known underground and overhead services
-
Comments
Principal contractors specific appointments
-
First Aider(s) or appointed person as appropriate.
-
Person(s) authorised to issue and control permits to work?
-
Waste Management Plan
-
Is there a competent person in charge on site?
-
Site safety Advisor/Manager
-
COSHH co-ordinator (person dealing with controlled products)
-
Fire Co-ordinator
-
Comments
Rescue Plans
-
Are emergency rescue plans in place with trained personnel where the works necessitate the use of MEWP's, safety netting or other fall arrest systems?
-
Are emergency rescue plans in place with trained personnel where confined space working is necessary?
-
Are emergency plans in place for site specific hazards or circumstances?
-
Comments
Asbestos Management
-
Audited?
-
Is an asbestos survey available on site?
-
Does the survey report (or asbestos register) cover the works being conducted?
-
Have operatives on site had asbestos awareness training?
-
Are operative aware of the location of asbestos within the works?
-
Comments
Site training
-
Inductions carried out (including facility for non English speakers) with records kept on site
-
Confirmation of Asbestos Awareness training for All site operatives
-
Verification of competence (eg Pasma/CPCS/CSCS cards)
-
Are there procedures in place to enable consultation with on site employees?
-
Confined space training
-
Hazard specific training records
-
Comments
Accident/incident reporting and investigation
-
Accident book or equivalent
-
Accident reporting and investigation procedure in place?
-
Details of RIDDOR reporting procedure
-
HSE phone number
-
Nearest A & E hospital details available
-
Near miss recording procedure to enable lessons to be learnt
-
Comments
Fire and Emergency Procedures
-
Agreed co-ordination and evacuation procedure with other site users in place
-
Adequate fire extinguishers in place
-
Fire extinguisher training
-
Adequate method of raising alarm
-
Is named First Aider or appointed person on site?
-
Suitable, fully stocked, First Aid box on site?
-
Comments
Occupational Health and PPE
-
Suitable PPE provided by Principal Contractor
-
Is PPE being worn by all opertives
-
Suitable precautions in place to protect operatives and others from COSHH hazards
-
Manual handling assessment (MAC) in place and followed
-
HAV assessment procedure with supporting information
-
Noise level assessment procedure
Safe places of work
-
General house keeping adequate
-
Adequate lighting including emergency provision provided
-
Traffic Management and pedestrian segregation in place
-
Adequate safe access routes in place
-
Are safe work zones in place and suitably segregated where required
-
Are suitable measures in place to prevent contact with overhead power lines
-
Are all guards and extractor systems are in place on machinery and power tools
-
Comments
Ladders/steps
-
Undamaged and clear of defects with suitable checking procedure in place
-
Use at correct angle and secured (ladders)
-
Do ladders rise a sufficient height above their landing place (5 rungs). If not, are other hand holds available
-
Podiums, are gates closed and wheels locked when in use
-
Are they appropriate for the work?
-
Comments
MEWP
-
Used correctly by harnessed operatives
-
Operatives stood inside the protected platform
-
Physical barrier working zone around the vehicle
-
Are ground-conditions suitable for use?
-
Being used in suitable weather conditions
-
Being used by competent persons
-
Warning sounders and beacons in use
-
Comments
Fire
-
Clearly signed exit routes maintained
-
Adequate fire extinguishers in place and current test certificate
-
Safe storage of flammable liquids
-
Safe and proper storage of LPG and other bottled gases
-
Fire plans displayed and up to date
-
Adequate means of sounding the alarms
-
Are hot works adequately controlled
-
Comments
Confined Spaces
-
Audited
-
Are safe working procedures in place and being followed?
-
Is there a safe and suitable means of access/egress?
-
Are buddy working systems in operation?
-
Is there adequate lighting including emergency back up?
-
Do any materials in use pose additional significant risk?
-
Is there an emergency evacuation process in place including a means of raising the alarms?
-
Permit to work system in use, issued and controlled
-
Are safe working platforms provided where confined space is a roof void or similar?
-
Are communication facilities maintained with those working in the space?
-
Comments
Works with Asbestos
-
Audited
-
Is a buffer zone being maintained around any area of work with asbestos?
-
Are all operative wearing RPE/PPE (respirators and hooded disposable overalls)?
-
Is the asbestos waste skip locked when not in use?
-
Are adequate hazard warning signs in place?
-
Are asbestos removal enclosures are present
-
Do enclosures show good integrity?
-
Are suitable vision panels present?
-
Are adequate warning signs present around the enclosures?
-
Are operatives wetting down asbestos materials before they are removed (ie not dry stripping)?
-
Is waste controlled within the enclosure (ie not lying all over the place)?
-
Are negative pressure units turned on and vented to external?
-
Comments
Working at height
Scaffolding (non towers)
-
Present on site?
-
Was a completion certificate issue by scaffolders during handover
-
Has the scaffold been inspected by a competent person within the last 7 days
-
'Scaf-tag' in use - signed to prevent use of incomplete scaffold
-
Internal boards clipped to prevent movement
-
Platforms fully boarded, wide enough for purpose and free from tripping hazards with materials stored safely
-
Physical barriers/guards in place to prevent fall of materials or persons ie gaps of no more than 470mm and a hand rail at 950mm as minimum requirement with brick guards in use where required.
-
SWLs clearly indicated on loading bays
-
Adequately secured to building or alternatively braced
-
Are toe boards in place with minimum height of 150mm
-
Are measures in place to protect access points and routes
-
Are adequate fall prevention controls in place during erection
-
Comments
Scaffolding (towers)
-
Present on site?
-
Access correct via internal ladders
-
Are wheels locked when tower is in use?
-
Are towers used on suitable ground with outriggers if required?
-
Is working platform fully boarded?
-
Where towers have been in use for more than seven days are formal recorded checks being undertaken?
-
Are signs in place to prevent use of incomplete scaffold?
-
Comments
Ladders
-
Present on site?
-
Are ladders secured to prevent them slipping sideways or outwards
-
Are ladders positioned so that users do not have to overstretch
-
Are ladders in good condition
-
Do ladders rest against a solid surface and not on fragile surfaces or insecure materials
-
Comments
Roof work
-
Present on site?
-
Are precautions in place to exclude access below work area
-
Are materials and tools are kept away from roof edges
-
Is there safe access
-
Where harnesses are being used are these the correct type with proof of operative training
-
Are harness and or safety netting anchor points sufficiently robust
-
Are precautions being taken to determine if/where roof decking is of a fragile nature/material
-
Is the correct equipment in place to comply with emergency rescue procedures where these are required owning to the working methods
-
Is edge protection correct and robust to prevent falls including additional handrails where those on pitched roofs are vulnerable
-
Are roof lights covered and openings guarded or protected
-
Comments
Work Activities
Excavations
-
Audited
-
Ensure barriers/handrails at top of excavations are sufficient and physically robust
-
Are adequate measures in place to protect operatives working in the excavations? Prove that trench supports or other systems in use are suitable and sufficient
-
Adequate protection to prevent risk to adjacent buildings
-
Is access/egress to excavations suitable
-
Are vehicle stop blocks in place
-
Are materials and vehicles kept a safe distance away to prevent pressure on excavation sides or fumes entering working areas
-
Are suitable systems in place to check areas for buried services prior to and during excavations
-
Comments
Manual Handling
-
Audited
-
Are heavy materials lifted mechanically
-
Have people been instructed and trained how to lift safely
-
Comments
Electrical and other services
-
Have all necessary services been provided on site before work begins
-
Have all service be identified (electric, gas etc) and effective steps taken to prevent damage
-
Is low voltage systems being used
-
Where mains voltage has be used, are trip devices (RCD) provided
-
Are all connections to the system properly made and are suitable plugs used
-
Are cables and leads protected from damage
-
Where there are overhead lines, has the electricity supply been turned off, or precautions been put in place
-
Are tools and equipment checked by users, visually examined on site and regularly inspected by a competent person
-
Comments
Vehicles and Plant
General
-
Audited
-
Operated using signalling and safe systems of work
-
Immobilised when not in use
-
Safety devices in place and in use (reversing alarms, beacons, mirrors, safety belts, roll over bars etc)
-
Non users protected from injury (safe working zones)
-
Are seat belts worn
-
Are dumpers vacated when being loaded
-
Are one way systems in place for site traffic or turning areas/banks men provided where reversing is unavoidable
-
Comments
Cranes
-
Audited
-
Is tower crane registered in with HSE
-
Is there a lifting plan in place, is crane in use in line with plan ie size?
-
Is there a current record of examination
-
Are competent slingers being used
-
Is the correct lifting equipment eg strops, chains being used and is such equipment marked or otherwise identified to confirm test dates?
-
Are people prevented from walking under the lifting operations and crane prevented from hanging over occupied areas/building
-
Where excavators are used as lifting equipment is the SWL displayed on the machine?
-
Safety devices in place and in use (reversing alarms, beacons, mirrors, safety belts, roll over bars etc)
-
Is there an appointed person
-
Is crane on a firm and level base in line with lifting plan?
-
Are out riggers deployed on a suitable base in line with lifting plan?
-
Are there trained signallers with suitable communication procedures
-
Comments
Equipment
Cartridge operated tools
-
Audited
-
Are manufactures instructions being followed, use, dealing with misfire?
-
Check that correct grade of goggles and ear protection are provided and worn
-
Is there evidence that equipment is maintained and kept in good condition in line with manufactures instructions?
-
Are guns and cartridges kept in a secure store when not in use including misfired cartridges?
-
Comments
Vibration
-
Audited
-
Are vibrating tools clearly identified with HAV/WBV labelling?
-
Are safe working procedures in place and being followed?
-
Is suitable information on HAV available on site?
-
Comments
Noise
-
Audited
-
Check safe working procedures are being followed in line with risk assessments
-
Ensure safe working zones are identified/maintained
-
Are those not involved in the work protected from exposure?
-
Is the correct type of PPE available and worn where required?
-
Ensure noise reduction equipment is place to prevent spread of noise
-
Comments
Hazardous substances / COSHH
-
Are COSHH data sheets available on site
-
Are safe working procedures are being followed in line with COSHH risk assessments and data sheets.
-
Ensure safe working zones are identified/maintained
-
Ensure working zones only being accessed by authorized staff
-
Check substances clearly marked and securely stored
-
Are those working with or effected by controlled substances wearing suitable PPE?
-
Are those not working with products protected from the risk?
-
Is dust control in place?:
-
Comments
Conclusions and recommendations
-
Conclusions and Recommendations
-
Corrective Action
-
Actions to be considered