Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Documentation
-
Is the site file present in the correct format<br>
-
Are the correct and applicable RAMS included?
-
Are the site manager certificates included?
-
Are the correct tickets included in the file such as PASMA, IPAF and First Aid
-
Are all COSHH data sheets present?
-
Is the site attendance register accurate for the personnel working on the site on either day or night shifts? Have they signed out as well?
-
Has the induction register been signed by all personnel?<br>
-
Site Set Up
-
Is the site board up?
-
Is the fire station and set up and is it maintained in good order? Check fire extinguishers, test bell, fire bucket, and first aid kit
-
Is the accident book on site and locked away?
-
Is the fire evacuation notice present and completed?
-
Is the hospital map on the board and visible?
-
Is there adequate writing materials to maintain a good site office?
-
Is there a permit to work in process?
-
Is there good segregation of the public from the site works?
-
Are 'work in progress' signs up and clearly situated to the public?
-
Are PPE signs set up?
-
Are key contact signs (project directory) installed?
-
Are any closed areas clearly sign posted?
-
Are skips fenced off with correct warning signs securely attached?
Equipment
-
Are all scaffolds tagged and inspection records up to date?
-
Do all ladders have inspection tickets attached?
-
Have all portable tools got current six month PAT test stickers on?
-
Has all MEWP been inspected and inspection records kept In site file?
-
Have all grinding and cutting equipment got the correct guards on and in good working order?
-
Is all cabled equipment 110 volt (if not remove from site immediately)?
Project Personalnel
-
Was a spot check of personnel CSCS cards carried out?
-
Was anyone without CSCS cars who was checked?
-
Was moral high?
-
Were staff aware of the project plan (discuss with personnel there understanding of programme)?