Information
-
Audit Title
-
Client / Site
-
Project Number
-
Conducted on
-
Prepared by
-
Location
-
Subcontractors on site
-
Add drawing
General
-
Posted OSHA & other Jobsite posters
-
Safety program/manual on site
-
First aid supplies immediately available/adequate
-
HazCom & MSDS sheets - including subcontractors
-
Jobsite Hazard Analyses (JHA) complete
-
First aid/CPR trained personnel on site
-
Emergency numbers/procedures available
-
Jobsite warning signs posted as necessary
Housekeeping & Sanitation
-
General neatness of working areas & walkways
-
Sanitary,adequate,clean facilities
-
Adequate supply of drinking water & cups
-
Waste containers provided
-
Adequate lighting
Personal Protective Equipment (PPE)
-
Hard hats
-
Safety glasses/face shields/goggles
-
Hearing protection
-
Safety footwear
-
Respirators
-
Gloves (if needed)
-
Safety harnesses & lanyards (if needed)
-
Proper clothing in use, trousers, shirts
-
High visibility clothing
Electrical Safety
-
GFCI's used on every generator/light tower
-
Adequate wiring well insulated & fused
-
All electrical equip grounded, ext cords 3-wire type
-
Cords routed to prevent safety dangers & damages
Hand & Power Tools
-
Proper tools and operator for the job task
-
Damaged tools repaired or replaced
-
Properly guarded
-
Correct PPE used
-
Proper tool and operator for the job task
-
Damaged tools repaired or replaced
Hoist, Cranes, & Derricks
-
Operator certification and crane annual inspection maintained in file
-
Daily crane inspections properly completed by operator
-
Fire extenguisher
-
Qualified operator
-
Competent person rigging, using proper rigging
-
Lift areas barricaded & secured
-
Safety latches functioning
-
Equipment alarms functioning
-
Qualified signal person demonstrating proper signaling practice
-
Load charts available for equipment
-
Outriggers being properly used with adequate blocks
-
Overhead power lines deactivated or marked and adequate distance maintained
-
Rigging in proper working condition
-
Rigging not in use stored properly
Stairways & Ladders
-
Stairway or ladder provided in breaks of elevation of 19" or more
-
Ladder placed on stable/level surface
-
More than one ladder/stair access for >25 personnel on working deck.
-
Proper use of step ladders
-
Inspected - defective ladders removed from service
-
Extension ladders secured 1/4 slope
-
Ladder extends 36" above landing and secured
-
Stairways blocked/barricaded if unusable
-
Egress provided within 25 ft
-
Handrails on all stairways as needed
Heavy Equipment
-
Regular inspection & maintenance
-
Inspection log maintained
-
Lights, brakes, & warning signals operative
-
Fire extinguishers
-
Qualified operator
Handling & Storage of Materials
-
Materials properly stored or stacked
-
Proper lifting procedures used
-
Passageway cleared
-
Proper PPE used
Excavation
-
Ladders provided every 25' for access
-
Water accumulation prevented
-
Barricading in place during & after work hours
-
Competent person identified and performing duties
-
Utility lines located/Soil type identified
-
Proper shoring, benching, sloping as required
-
Materials and spoils stored at least 2 feet from edge
Fire Prevention
-
Required fire extinguishers in equip properly charged and inspected
-
"No smoking" signs posted near flammable gas/liquid storage
-
Approved containers used & clearly identified
-
Storage tanks clearly labeled as to contents/hazards - extinguisher within 75'
-
Storage tanks in proper containment area
Welding & Cutting
-
Fire extinguisher within 25 ft
-
Fire watch being utilized when required
-
Flammable material protected or removed
-
Proper PPE being utilized
-
Hoses and leads protected & in good repair
-
Gas cylinders properly stored, in or out of use
-
Oxy acetylene torch sets, regulator, hoses & attachments inspected
-
Welding cables: leads, connectors, & cable condition
Fall Protection
-
All employees trained in fall protection rules.
-
100% tie off above 6 ft & retrieval plan created
-
Proper anchorage points
-
Fall protection equipment inspected daily.
-
Floor/wall openings covered or guarded
-
Guardrail systems in place & properly installed
-
Leading edge protected/barricaded with proper signage
-
Perimeter guardrails installed and maintained properly
Concrete Construction
-
Forms properly installed & braced
-
Proper access provided
-
Proper PPE in use
-
Rebar/Impalement hazards protected
-
Eye wash station available
Confined Space
-
Atmospheric testing completed
-
Permit completed & posted
-
On-site rescue provided (if needed)
-
Off-site rescue provided (if needed)
-
Competent person on-site (if needed)
-
Lock out/tag out procedures in place
-
Entering employees properly trained
Scaffolds
-
All components properly used / free of defects
-
Proper safety features appropriate to height
-
Scaffold inspections completed
-
Scaffolds secured when required
-
Project Manager
-
Superintendent
-
Other Comments