Title Page
-
Site conducted
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Project Site Safety Checklist
Safety Documentation
-
Is a Construction Stage Health and Safety plan (UK) or Health & Safety Plan (Ireland)available and has it been reviewed by the Project Manager and Site Supervisor?
-
Are Manuals and/or Method Statements available for the work and is staff aware of their content?
-
Is pre construction information available?
-
Are CDM, and NI 10 (UK) & AF2 (Ireland) completed and on display at the site entrance?
-
Is the HSE poster “Health and Safety the Law and You” or Health and Safety ‘what you need to know’ on display in the site office and completed? Is there an HSE (UK) or HAS (Ireland) Accident Report book on site?
-
Are insurance Certificates on display in the site office?
-
Are all Project Contact Numbers on display in the site office?
-
Is a sign in/out and site diary available and in use on the site?
-
Safety Audit & Whole Job Risk Assessment procedure in place?
-
Are evacuation Assembly Point, Parking area and Smoking Area clearly identified and known to all?
-
Are current relevant AOR and safety Critical Information available and on display in the Site Office?
-
Is the address and contact number for the nearest Hospital on display in the site office?
-
Is there a list of all personnel (including CV’s for contractors)?
-
Have training records and authorisation levels confirmed?
-
Has Safety File been prepared/started?
-
Safety of Tools, Plant, Equipment, Hazardous Substances
-
Are statutory inspection certificates for lifting equipment available?
-
Are all portable electrical tools rated 110V or less?
-
Are Hazardous substance Material Safety Data Sheets available in the site office for all substances to be used on site?
-
Are all tools (if necessary) calibrated?
-
Are procedures for fire, emergency and evacuation is place?
-
Is a trained first aider available and identified by name and contact number in the site office? Are First Aid Kit(s) available?
Identification of Hazards and Assessment of Risk
-
Are hazards identified and risk assessed for job activities?
-
Are hazards identified and risk assessed for access to site, security, public, etc?
-
Are hazards identified and risk assessed for interfaces with Client?
-
Have all staff been inducted /briefed and are records available in the site office?
Construction Issues
-
If a Crane is to be used, is a lifting plan available and is the “Appointed Person” role identified in the site office?
-
Is vehicle Risk Assessment process in place and monitored by the site supervisor?
-
Are Toilet/washing facilities available?
-
Have temporary toilets been tethered in locations where wind strength may be high?
-
Is drinking water available or are arrangements in place for supply?
-
Are arrangements for regular communication and liaison between all parties in place?
Safety Management Checklist
-
Safety and Health Plan
-
Is a Design Stage RA and Pre Construction Information available?
-
Has an adequate Construction Stage Health and Safety Plan or Safety & Health Plan been prepared for the construction stage?
-
Is it necessary to appoint a Safety and Health Co-ordinator for the project?
HSE + HSA Notification
-
Has the NI 10 / AF2 form been forwarded to the H.S.E / HSA ?
-
Is the NI 10 / AF2 form displayed on site?
Organisation and Structure
-
Has a Site Manager with safety responsibilities for the project, on site been identified?
-
Has the safety management structure for the project been communicated?
Competencies and Training
-
Has induction training been received by everybody working on site?
-
Are training records available for all staff on site?
-
Are competencies of subcontractors and people working on site adequate?
-
Are the Safety Rules Authorisations of people on site adequate?
Staff Records
-
Has the contractor provided names of all people who will work on site?
-
Is there a daily site log containing the names of all staff on site?
Co-operation and Co-ordination
-
Are adequate arrangements in place for co-operation and co-ordination on H&S issues between all parties involved?
-
Are interface arrangements agreed and operating between Adman and contractors?
Health and Safety Policy / Safety Statement
-
Is the Health & Safety policy / Safety Statement displayed?
Method Statements
-
Are written method statements or Manuals available for the work being carried out on site?
-
Is work being carried out in accordance with the method statements?
Identification and Control of Risks
-
Are control measures in place on site for all risks identified?
-
Is a daily Risk Assessment being carried out where all site-specific risks and controls are identified?
Materials and Equipment
-
Is safety information available for the materials being used on site?
-
Are the machinery, tools and equipment being used on site maintained in accordance with statutory requirements?
-
Are the required certificates available and up to date?
-
Are machinery, tools and equipment being used by trained personnel?
Information and Communication
-
Are people on site familiar with the Health and Safety Plan?
-
Are regular site meetings taking place with the contractor where safety is top of the agenda?
-
Is safety information being made available to people on site?
-
Are effective arrangements in place for consulting with people working on site regarding their safety and health?
-
Are adequate communication arrangements in place between the contractor and sub-contractor?
-
Are adequate arrangements in place(s) for dealing with safety implications of changes to a design during construction phase?
Site Rules
-
Are the site-specific rules and restrictions set out in the Safety and Health Plan being applied?
-
Are adequate arrangements in place to control access to the work site?
Safety Monitoring
-
Are site safety inspections/audits being carried out regularly by Site Staff / Management?
-
Are the results of safety audits communicated to people on site?
-
Are safety audit follow up actions being implemented?
Accident & Incident Reporting
-
Are the site personnel aware of, and implementing, reporting requirements for accidents or dangerous occurrences?
-
Do the personnel have adequate arrangements in place for dealing with safety complaints and reporting of safety incidents?
-
Are accident/incident investigations being carried out and reports issued on time?
-
Are follow up recommendations being communicated and implemented on time?
Emergency Procedures
-
Is an adequate emergency contact list available to people on site?
-
Is the necessary safety equipment, First Aid equipment, etc available on site in event of an accident?
-
Are people available on site who are trained in First Aid?
-
Are adequate rescue and evacuation procedures in place on site?
-
Are people on site familiar with the emergency and rescue procedures?
Safety File
-
Is the safety file initiated?