Information
-
Job Name and Number
-
Plan Number and Creator
-
Activity
-
Conducted on
-
Prepared by
-
Location
-
Foreman
Crew Review
SHEMS MMR
-
Check box if you participated in the job site SHEMS Monthly Management Review Meeting OR Project Safety Leadership Team Meeting
-
Comments regarding the review meeting.
-
Photo of sign in sheet
Crew Review
-
1. Are all of the Crew members signed off on the DHA<br>and participating in the review process?
-
2. What Safety and Environmental topics did you discuss today during your DHA?
-
3. Have all relevant inspections and permits for<br>the activity been completed? (Hot work permit,<br>confined space, soil erosion and sediment control, AWP, etc.)
-
4. What triggers from the CWP were discussed and why were they relevant today?
-
5. What ongoing safety hazards and potential environmental impacts were discussed with the crew (in association with the activity, work area or job site)?
-
6. Are there any safety or environmental issues that<br>were discussed (either verbally or written on the DHA)<br>that have not been addressed?
-
Who did you talk to about getting them addressed?
-
7. Do you feel that the CWP that you have currently and<br>adequately addresses the scope of work & all risks that<br>are relative to your current activities? (What improvements<br>could be made to the CWP)?
-
Any Improvements for CWP?
-
8. Did crew participate in stretch and flex today?
-
9. Does the crew have plans such as an inspection or testing today?
-
Has this been reviewed with the crew?
-
10. Is the crew aware of the procedures in the emergency action plan including in the event of an environmental release? (Are all tools materials and equipment readily available)?
-
11. Are all appropriate signatures on the CWP? (specifically the Risk Acknowledgment sheet)
Observations
-
PPE
-
Housekeeping
-
Scaffold and ladders
-
Power/Hand tools:
-
Vehicle/Equipment inspection
-
Eye Wash Stations
-
Rebar Exposure
-
HazCom (Labels, Containment, SDS)
-
Fire/Hot work safety
-
Electrical
-
Lock out/Tag out
-
Rigging
-
Excavation
-
Demolition
-
Confined space
-
Fall Protection/Fall Arrest systems
Sign Off
-
Foreman's Signature
-
Auditor's signature