Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

  • Drill Hours

  • Pre inspection notes

Comissioning Check List

Pre Start

  • Check all oil levels as per pre start check list

  • Run machine In and reach normal operating temperature

  • Ensure machine is level and parked in an area free from hazards

  • All checks are to be done at 2100 engine rpm

  • Mast Pivot Caps Retained And Torqued To 1363 Ft/Pds - 1-1/4” Bolt

  • Mast Raise Cylinders Retained and All Hoses Tight/Secure

Electrical Shutdowns

Shutdowns

  • All E-Stops

  • Compressor Oil

  • Compressor Temp

  • Engine Oil

  • Engine Temp

  • Coolant Level

  • Hyd Temp

  • Hyd Oil Level

  • Others

Engine

  • Engine Rpm Low idle

  • Engine Rpm High idle

  • Engine oil pressure

  • Engine oil temp

  • Engine water temp

Compressor

  • Comp oil pressure - Stand By

  • System Regulator - 110 Psi

  • Bit Air Regulator - 55 Psi

  • Comp Stand by Air Pressure

  • Comp bit pressure - Air On

  • Comp oil temp Low idle

  • Comp oil temp high idle

  • Comp oil temp Air on

Hyd Test And Adjust

Hyd Tank

  • Check Security of butterfly valve

  • Check Security of suction seals and hoses

  • Check Condition of oil sight glass

  • Check Breather condition

Charge Circuit

  • LH Charge Relief - 450 Psi

  • RH Charge Relief - 450 Psi

  • Main Pump Supplement Circuit - 75PSI

Fan Pump

  • LH Fan RPM - Low Idle

  • LH Fan Pressure - Low Idle

  • LH Fan RPM - High Idle 1450 RPM

  • LH Fan Pressure - High Idle

  • RH Fan RPM - Low Idle

  • RH Fan Pressure - Low Idle

  • RH Fan RPM - High Idle 1500 RPM

  • RH Fan Pressure - High Idle

Main Pumps

LH Track & Rotation

  • Y&Z Max Flow Adjustment Set to 10mm

  • Hydraulic Neutral @ MS/MP >29 Psi - 14.75mm

  • Begin Adjustment Set to 225mA @ my & ms

  • MP Relief - 5500 Psi - Non Adjustable

  • MP POR Relief - 5050 Psi

  • MS Relief - 5500 Psi - Non Adjustable

  • MS POR Relief - 5050 Psi

RH Track

  • Y&Z Max Flow Adjustment Set to 10mm

  • Hydraulic Neutral @ MS/MP >29 Psi - 14.75mm

  • Begin Adjustment Set to 225mA @ my & ms

  • MP Relief - 5500 Psi - Non Adjustable

  • MP POR Relief - 5050 Psi

  • MS Relief - 5500 Psi - Non Adjustable

  • MS POR Relief - 5050 Psi

Feed Aux Pump

  • Stand By - 300 psi

  • Compensator - 3000 psi

  • Aux Load Relief Valve - V05 - 2500 psi

  • Jack/Mast Relief Valve - V06 - 2800 psi

Dust Collector Pump

  • Water Injection/Dust Collector Relief - 2000 psi

  • Water Injection - Min/Max Functional

  • Washdown Hose Functional

  • Water Injection - Bean Pump Relief 200 Psi

Feed Settings

  • Max Pull Down Relief Valve - V15 - 1800 to 2500 Psi

  • Pulldown Relief Valve - V16 - 2700 Psi

  • Pressure Reducing Valve - V17 - 1000 Psi

  • Carousel Parked Proxy Functional

  • Counter Balance - 750 Psi

  • Auto Pulldown Card 250mA - 250 psi

  • Cabin Feed Pressure Control

  • Feed Up Pressure Switch @ 200psi

Rotation Settings

  • Rotation Surge Protection V14 - 500 psi

  • Rotation Pressure Reducing Valve V22 - 450 psi

  • Max Rotation Pressure Relief V21 - 4000 psi

  • Cabin Rotation Pressure Control

  • Rotation Head Speed CW

  • Rotation Head Speed CCW

Joystick Adjustments

  • LH Tram Min/Max

  • RH Tram Min/Max

  • Rotation Min/Max

  • Feed Min/Max

  • Auto Pulldown

  • Feed Up in Seconds

  • Feed Down in Seconds

  • Fast Feed Down In Seconds

Interlocks

  • Tram Interlock Functional

  • Jack Interlock Functional

  • Ladder Up Proxy

  • Head Up Proxy

  • LHR Jack Proxy

  • RHR Jack Proxy

  • LHF Jack Proxy

  • RHF Jack Proxy

Counter Balance Valves

  • Mast Raise

  • RH Rear Jack

  • LH Rear Jack

  • LH Front Jack

  • RH Front Jack

  • Mast Lock

  • Hobo Swing

  • Deck Spanner

  • Pipe Positioner Swing

Alignment

  • Head Alignment

  • Loader and Rod Alignment

  • Pipe Positioner Alignment

  • Hobo Alignment

Final Implement Checks

  • Winch

  • Dust Curtain

  • Pipe Support Swing/Clamp

  • Breakout Swing in/out

  • Breakout Clamp/unclamp

  • Breakout Rotate CW/CCW

  • Holding wrench

  • Mast Lock

  • Loader Swing In/out

  • Loader Index

  • Loader Lock #1

  • Loader Lock #2

  • Air on/off

  • Fast Feed

  • Interlock Circuit

  • Thread Grease

  • Grease Pump and Module

  • Grease Pressure Switch @ 1800psi

A/C and Cab pressurizer

  • Test cabin for leaks

  • Cabin Pressure With Doors Closed

  • Take a picture of AC Service Sheet

  • Additional Checks
  • Type

Defects

    ADD DEFECT
  • Type

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.