Title Page

  • Principal Contractor Name

  • Date

  • Safety Consultant

  • Project

  • CDM Client Name

  • Weather

  • Location
  • Trades on site at the time of inspection

QUESTIONS

  • 1. CDM - F1O and Statutory notices displayed?

  • 2. Is the Principal Contractor prohibiting unathorised access to site with suitable double clipped Heras Panels; Timber Hoarding; Gates kept closed?

  • 3. Is there an accurate up to date Hazard Board on display?

  • 4. Is an accurate CPP in Place? Is it being formally reviewed on a regular basis?

  • 5. Is the Principal Contractor providing suitable inductions?

  • 6. Is the site manager recording weekly site inspections?

  • 7. Do all operatives have the correct competence / cards for the works being carried out? (CSCS, CPCS etc.)

  • 8. Have RAMs been produced for all sub-contractor activities on site? Are they current and have all operatives been briefed on the safe systems and signed relevant briefing registers?

  • 9. Are Face Fit Test Records held on site and up to date?

  • 10. Are suitable manual handling arrangements in place / in line with manual handling assessments?

  • 11. Has a documented Fire Risk Assessment been undertaken? Is the fire plan displayed?

  • 12. Are fire drills practised regularly? (date of last drill)

  • 13. Is there suitable means to raise an alarm? Is fire fighting equipment appropriate, visible and easily located?

  • 14. Are there a sufficient number of trained first aiders?

  • 15. Are sufficient first aid provisions provided? (Defibrillator; Eye Wash; First Aid kits)

  • 16. Temporary Works - Are Temporary Works designs in place? Is there a Temporary Works register? Is the Register populated and up to date? Are Temporary Works being managed/is there a Temporary works co-ordinator on site?

  • 17. Are permits to work in place? (dig/break ground, hot works, general work permit, confined space etc) Are they issued at the place of work by trained persons? Minimum 2 x fire extinguishers at the place of hot work activities?

  • 18. Are Thorough Examination Certificates held on site for mobile plant, lifting equipment etc.?

  • 20. Are general plant and equipment (PUWER) and lifting equipment (LOLER) Inspections being undertaken and recorded at suitable intervals?

  • 21. Have Plant fitters signed in; RAMS provided on site?

  • 22. Is the site aesthetically neat in appearance? Are there any issues likely to affect neighbouring residents or members of the public?

  • 23. Are storage areas acceptable? (Bucket changing areas; Sealed spoil bunds; Covered materials)

  • 24. Are the correct refuelling and storage practices being observed (including gloves and goggles)?

  • 25. Is access suitable with sufficient clear walkways, these must be segregated from moving plant. (All walkway barriers must be clipped together)

  • 26. Are plant exclusion zones being implemented on site ?

  • 27. Are keys removed from the ignition on all items of plant?

  • 28. Are excavation barriers in place? Are they set back from the edge and clipped / interlinked? Are they clipped together.?

  • 29. Are cable avoidance tools held on site, are they calibrated and being used? (CAT & Genny)

  • 30. Is correct PPE and RPE being worn and safe to use? (this includes when the use of extraction or water suppression is in use).

  • 31. Is work at height access equipment suitable and being used correctly (mobile towers, ladders, step ladders, Hop Ups 600mm x 600mm)

  • 32. Is the scaffolding safe and compliant?

  • 33. Are Loading Bay gates kept closed when loaded with materials?

  • 34. Are scaffold designs / compliance sheets held on site? Are handover certificates in place and mandatory inspections being carried out?

  • 35. Is construction dust being suitably controlled?

  • 36. Environmental: Are there any concerns regarding waste control and environmental protection (inc. pollution, contamination, wildlife, energy usage etc)

  • 37. Is Asbestos present and the correct survey in place, are operatives asbestos aware?

  • 38. If applicable is an asbestos removal plan in place? is the ASB notice printed and held on site?

  • 39. Is demolition work being carried out safely?

  • 40. Are all demolitions operatives in possession of CCDO cards?

  • 41. Is the Section 80 demolition notice held on site?

General Comments, Observations, Major Concerns.

  • Please add additional comments and observations

COMPLETED BY

  • Name & Signature

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.