Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Plot Number

Check List

  • DC Tests carried out with PV tester and DC test array completed in Fullness

  • Fire proof frame Built or Fireproof backing plate installed on cable end?

  • DC cables have been clipped within attic space?

  • Ac and DC isolators have been installed into attic space next to the inverter?

  • Install Ac isolator and Gen metre near main fuse board?

  • New circuit installed for solar PV and is protected by a Type A RCBO and is not protected by an RCD with other circuits?

  • Ac tests carried out both dead tests and live test and EIC completed?

  • All solar labelling installed and single line diagram installed?

  • DC test array, EIC certificate and job sheet completed?

Pictures

  • Upload a Picture of the inverter including isolators.

  • Upload image of Inverter serial number.

  • Upload image of labels on DC cables.

  • Upload image of Ac isolator and Gen metre by fuse board.

  • Uploaded image of installed single line diagram.

Documents

  • Upload DC test array

  • Upload completed job sheet

  • Upload EIC

  • Upload part P

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.