Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Plot Number
Check List
-
DC Tests carried out with PV tester and DC test array completed in Fullness
-
Fire proof frame Built or Fireproof backing plate installed on cable end?
-
DC cables have been clipped within attic space?
-
Ac and DC isolators have been installed into attic space next to the inverter?
-
Install Ac isolator and Gen metre near main fuse board?
-
New circuit installed for solar PV and is protected by a Type A RCBO and is not protected by an RCD with other circuits?
-
Ac tests carried out both dead tests and live test and EIC completed?
-
All solar labelling installed and single line diagram installed?
-
DC test array, EIC certificate and job sheet completed?
Pictures
-
Upload a Picture of the inverter including isolators.
-
Upload image of Inverter serial number.
-
Upload image of labels on DC cables.
-
Upload image of Ac isolator and Gen metre by fuse board.
-
Uploaded image of installed single line diagram.
Documents
-
Upload DC test array
-
Upload completed job sheet
-
Upload EIC
-
Upload part P