Title Page

  • Site conducted

  • Conducted on

  • Crew Leader

  • Project Name

  • Job Number

  • Location
  • Installer Responsible for Pictures

  • Installer Responsible for Main Disconnect

  • Installer Responsible for Inverters

  • Electrician Responsible for Interconnection

Checklist

DAILY UPDATE

  • Provide summary of the day.

SAFETY CHECKLIST

CREW LOG

  • Each present crew member to sign name and signature acknowledging attendance at this meeting

  • Crew Members
  • Name & Signature

  • LIST TASKS

  • LIST OF POTENTIAL HAZARDS

  • PPE inventory

  • First Aid Kit on-site?

  • First aid personnel identified?

  • Who?

  • Nearest Medical Facility
  • Fall protection measures inspected and in place?

  • GFCI used where required?

  • Tools inspected and in proper working order?

  • Daily safety pictures of whole crew wearing PPE during toolbox talk

  • Was a toolbox talk conducted?

  • Cell service available?

  • Water available on-site?

  • Lock-out Tag-out (LOTO) on hand?

TASK

  • Ground Mount

  • Harvest Yard Sign

  • Who completed this task?

Array Construction

  • Overall racking installation

  • Who completed this task?

  • Racking torqued

  • Who completed this task?

  • Array tilt

  • Who completed this task?

  • Optimizer Sticker Sheet

  • Who completed this task?

  • DC String/Cable Ties

  • Who completed this task?

  • MC4's Tightened

  • Who completed this task?

  • Modules

  • Who completed this task?

  • Broken Panels

  • How many are broken?

  • Module Wire Management

  • Who completed this task?

  • Panels torqued

  • Who completed this task?

  • Picture of low edge to ground

  • Who completed this task?

  • Side Profile of Array

  • Who completed this task?

  • Overall Array

  • Who completed this task?

Inverter / Equipment Rack

  • Inverter(s) Mounted

  • Who completed this task?

  • Inverter(s) SN

  • Who completed this task?

  • DC Disconnect

  • Who completed this task?

  • PV Sub Panel

  • Who completed this task?

  • AC Breakers Labeled

  • Who completed this task?

  • Overall Electrical Rack

  • Who completed this task?

  • DC Conduit

  • Who completed this task?

  • Sealtight Tightened

  • Who completed this task?

  • Inverter Terminations

  • Who completed this task?

  • Conduits Sealed

  • Who completed this task?

  • Solar Panel Grounding

  • Who completed this task?

  • DC Fuses/Breakers

  • Who completed this task?

  • DC Voltage

  • Who completed this task?

  • Combiner Boxes & Connectors

  • Who completed this task?

  • Picture of all boxes open to determine wire routing

  • Who completed this task?

Trenching

  • Trench Depth

  • Who completed this task?

  • Ground Rod at Array

  • Who completed this task?

  • Ground Rod at Interconnection

  • Who completed this task?

  • AC Conduit

  • Who completed this task?

  • Bury Tape

  • Who completed this task?

  • Trench Fill

  • Who completed this task?

Interconnection / Disconnect Rack

  • AC Disconnect

  • Who completed this task?

  • AC Fuses

  • Who completed this task?

  • AC Disconnect Terminations

  • Who completed this task?

  • Has the AC Disconnect been tested?

  • Date and Time Tested

  • How long did it take for the system to power down in seconds?

  • Who completed this task?

  • Phase to Phase AC Voltage Reading

  • Who completed this task?

  • Inside Junction Boxes

  • Who completed this task?

  • Outside Junction Boxes

  • Who completed this task?

Monitoring

  • Monitoring (if applicable)

  • What communication type?

  • Who completed this task?

  • Production Meter Face

  • Who completed this task?

  • Meter Serial Number & MAC ID

  • Who completed this task?

  • Cat5 (if applicable)

  • Who completed this task?

  • Site Clean Up

  • Who completed this task?

  • Inspection Stickers

  • Who completed this task?

  • Pictures Uploaded to Field Folder?

  • Roof Mount

  • Daily Safety Pictures (Crew members wearing their PPE)

  • Harvest Yard Sign

  • Who completed this task?

Array Construction

  • Roof Penetrations

  • Who completed this task?

  • Roof Flashings

  • Who completed this task?

  • L feet installation

  • Who completed this task?

  • Racking installation

  • Who completed this task?

  • Racking torqued

  • Who completed this task?

  • Optimizer Sticker Sheet

  • Who completed this task?

  • DC String/Cable Ties

  • Who completed this task?

  • MC4's Tightened

  • Who completed this task?

  • Modules

  • Who completed this task?

  • Broken Panels

  • How many are broken?

  • Module Wire Management

  • Who completed this task?

  • Panels torqued

  • Who completed this task?

  • Side Profile of Array

  • Who completed this task?

  • Need a picture of the overall Array

  • Who completed this task?

Inverter / Equipment Rack

  • Inverter(s) Mounted

  • Who completed this task?

  • Inverter(s) SN and Nameplate

  • Who completed this task?

  • DC Disconnect

  • Who completed this task?

  • PV Sub Panel

  • Who completed this task?

  • AC Breakers Labeled

  • Who completed this task?

  • Overall Electrical Rack

  • Who completed this task?

  • DC Conduit

  • Who completed this task?

  • Conduit Support

  • Who completed this task?

  • Sealtight Tightened

  • Who completed this task?

  • Inverter Terminations

  • Who completed this task?

  • Conduits Sealed

  • Who completed this task?

  • Solar Panel Grounding

  • Who completed this task?

  • DC Fuses/Breakers

  • Who completed this task?

  • DC Voltage

  • Who completed this task?

  • Combiner Boxes & Connectors

  • Who completed this task?

  • Picture of all boxes open to determine wire routing

  • Who completed this task?

Trenching

  • Trench Depth

  • Who completed this task?

  • Ground Rods

  • Who completed this task?

  • AC Conduit

  • Who completed this task?

  • Bury Tape

  • Who completed this task?

  • Trench Fill

  • Who completed this task?

Interconnection / Disconnect Rack

  • AC Disconnect

  • Who completed this task?

  • AC Fuses

  • Who completed this task?

  • AC Disconnect Terminations

  • Who completed this task?

  • Has the AC Disconnect been tested?

  • Date and Time Tested

  • How long did it take for the system to power down in seconds?

  • Who completed this task?

  • Phase to Phase AC Voltage Reading

  • Who completed this task?

  • Inside Junction Boxes

  • Who completed this task?

  • Outside Junction Boxes

  • Who completed this task?

Monitoring

  • Monitoring (if applicable)

  • What communication type?

  • Who completed this task?

  • Production Meter Face

  • Who completed this task?

  • Meter Serial Number & MAC ID

  • Who completed this task?

  • Cat5 (if applicable)

  • Who completed this task?

  • Site Clean Up

  • Who completed this task?

  • Inspection Stickers

  • Who completed this task?

  • Pictures Uploaded to Field Folder?

PV LABEL CHECK LIST

  • PV LABELS AND WARNINGS SHEET

  • Need a picture with both of the service meter and the disconnect with appropriate signage and final inspection stickers in the same picture. (See example)

  • Add media

  • Take a picture of the service meter and the disconnect with appropriate signage in the same picture.

Combiner Box

  • Was this equipment installed on the project?

  • Check the boxes that apply to the labels that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

DC Conduit / Conduit Raceway / Pull Box / Junction Box

  • Check the boxes that apply to the labels that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

Inverter

  • Check the boxes that apply to the labels that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

PV Sub Panel

  • Check the boxes that apply to the stickers that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

Production Meter

  • Was this equipment installed on the project?

  • Check the boxes that apply to the labels that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

AC Disconnect (If not the main solar disconnect)

  • Was this equipment installed on the project?

  • Check the boxes that apply to the labels that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

Main Service Panel (Only if using backfed breaker)

  • Was this equipment installed on the project?

  • Check the boxes that apply to the labels that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

Main Solar Disconnect (PV AC Disconnect)

  • Check the boxes that apply to the stickers that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

Utility Meter

  • Check the boxes that apply to the stickers that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

Energy Storage System (Only if batteries installed)

  • Was this equipment installed on the project?

  • Check the boxes that apply to the labels that were placed on the equipment.

  • Take an overall picture of the equipment with labels.

PROJECT SUMMARY

  • How did the project go overall?

  • What made the project poor?

  • Any changes to the original design?

  • What changes were made?

  • Any additional purchases?

  • Please add receipt

  • Additional Comments?

  • Please list comments here.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.