  • Site conducted

  • QC Type (PV, Battery, Upgrade)

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Original Installer

Incomer Area

  • Installed MCB into Existing DB

  • Add media

  • Installed into new Consumer Unit / GOB

  • Add media

  • Is RCD provided for inverter?

  • Add media

  • Is cable sizing correct to inverter

  • Add media

  • Is Generation meter sealed?

  • Add media

  • Is insulation correctly cut-back on cables

  • Add media

  • Are labels provided at DB & AC isolator

  • Are cables neat / tidy at DB

  • Add media

  • Check water / gas / oil bonded

  • Add media

Inverter Area

Inverter Area

  • Is inverter fixed securely

  • Add media

  • Are AC/DC isolators labelled

  • Add media

  • Are DC cables labelled correctly

  • Add media

  • Is there a schematic present

  • Add media

  • Are the schematic details correct for the installed system

  • Add media

  • Is there a startup / shutdown procedure in place

  • Add media

Panels / A Frame Area

Panels / A Frame area

  • Is maximum overhang from last hook to end of rail less than 500mm

  • Add media

  • Is hook spacing less than 1200mm between hooks

  • Add media

  • Is there 200mm minimum from gutter to bottom panel

  • Add media

  • Are panels at least 200mm from the ridge

  • Add media

  • Are all mid and end clamps present

  • Add media

  • Are DC cables /MC4 connectors clipped/tidy behind panel

  • Add media

  • Do DC cables enter the roof correctly

  • Add media

  • Has roof felt been damaged by the DC cable entry

  • Add media

  • What is panel orientation

  • Add media

  • Are there any obstructions/shading issues present

  • Add media

  • Are all IP55 boxes sealed / watertight

  • Add media

  • Are 'A' Frames level

  • Add media

  • Is 'A' Frame earthed

  • Add media

Documents

Documents

  • Does PV DEIC details match installation particulars

  • Generator meter reading at time of visit

  • Was PV system generating at time of visit

  • Inverter Readings, String 1 (Pac, Vdc, Idc)

  • undefined

  • Inverter readings , String 2 (Pac, Vdc, Idc)

  • undefined

  • AC Readings (Vac, Iac)

  • undefined

General

General

  • Is client happy with system

  • Has it achieved its expected annual yield or pro-rata yield

  • Are any extra products installed and are they operational ( Immersion Controller, WIFI monitoring)

Site Paperwork

Document Description

  • EEC Solar PV Invoice

  • EEC Solar Customer Purchase Report

  • EEC Solar PV Survey

  • EPC Certificate

  • MCS Installer Certificate

  • MCS Commissioning Certificate

  • PV Commissioning Certificate

  • PV DEIC

  • NICEIC Certificate of Compliance

  • Incerter Data Sheet

  • Incerter Instruction Manaul

  • Inverter G83 Protection Sheet

  • Solar Panel Data Sheet

  • PV System 10/ 20 Yrs Guarentee

  • Details of Guarantees and Warranties

  • REAL/RECC/HIES Documents

  • REAL / HIES Deposit and Advanced Payment

  • Solar PV Schematic Diagram

Powerwall Installtion

Mechanical

  • Powerwall is installed in an approved location

  • Powerwall space and height requirements have been followed

  • Is the Powerwall and associated equipment level and free from any damage ?

  • Powerwall equipment is installed according to mounting specifications?

  • Add media

Electrical

  • Have the correct warning and identification, labels or notices been applied to the system ?

  • Do electrical items have the correct IP rating for the area they are installed, and has the IP rating been maintained ?

  • Add media

  • Are all cables of the correct type and do they carry the correct markings, has the current carrying capacity been considered ?

  • Was the bend radius considered of all cables and are the cables free of visible kinks?

  • Have the gateway been installed in the best possible position ?

  • System is installed according to all applicable rules, codes and regulations?

  • All plugs and connectors are fully seated and connected? Has the terminating Resistor has been installed correctly? Has the communication drain wire been attached ?

  • Has an AC isolator been used ?

  • All conductors free from damage or excessive stress ?

  • Is cable restrained correctly and the correct level of protection employed where required?

  • Has the correct type of circuit protection been used ?

  • Add media

Safety

  • The mounting or installation of electrical equipment or the Powerwall has maintained the safety of the installation or the property?

  • Is the installation location suitable for maintenance, and have smoke alarms been considered?

  • Add media

Commissioning & Metering

  • Is the Powerwall and Gateway running correctly and the App setup and working correctly ?

  • Are the CT clamps installed in correct direction, and are meters correctly set up and accurate?

  • Add media

Customer Experience

  • Has the customer received what was expected?

  • Has the customer been happy with Tesla communication?

  • Has the customer been happy with the installer? Were they on time?

  • Add media

Aesthetics

  • Are all installed items clean and free from dents and scratches?

  • Equipment edges are aligned and the equipment layout is as compact as possible ?

  • Is the site clean and free of install debris?

  • Are cables or conduit run correctly and do they have a good appearance, with clips evenly spaced, avoiding any mechanical damage?

  • Is the unit free from any other company's logo

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.