Title Page

  • Site conducted

  • Installer name

  • Location

Installation site checklist for technical assessment of PV installation

  • Project No

  • Installer Name / Lic. No

  • Address:

  • Date

Qualification Check

  • Electrician / CEC License

  • Roofer Work at Heights Ticket

  • EWP License If EWP Used

  • SWMS Document Readiness

Safety Check

  • HI VIS Wearing and Work Boots

  • Edge Protection system installed correctly

  • If edge protection not practical, was risk assessment conducted and fall restraint system set up correctly

  • Non-metal Ladder Used

  • AC Conduit Location , Support & Seal

  • Ladder Set-up 1:4 Ratio

  • Earth Cable Terminate & Soldering

  • Ladder 1 meter above Roof Edge

  • Labeling

  • Harness Anchor Points

  • Ladder Gutter Guards / Anti Slide Measure

  • Ladder away from powerline 4m

  • Tag Out and Lock Out Kit Used

  • Roof Exclusion Zone Barrier

  • Ground Exclusion Zone (Cone; Bollard)

  • Roof Skylight Cover

  • Roof Edge Protection

Quality Check 1 ( Roof Job )

  • Panel Orientation & String Configuration

  • Panel Clampng Zone

  • Tin Roof Feet with Rubber

  • Roof Penetrating and Seal

  • Tile Position; Grinded, No Ingress

  • Roof Isolator Mounting and Seal

  • Rail and Panel Earthing & Spray

  • Restricted Access Setup

  • Stainless Cable Tie Used

  • Roof Feet Spacing

  • Roof & Cavity HD Conduit Support & Seal

  • Roof Exclusion Zone AS/NZS 1170.2

  • Others (Not listed above)

Quality Check- Ground job

  • Cable Not Touching the Roof

  • Cable Not Exposed to Sunlight

  • DC Insulation and VOC Calculation

  • DC Conduit Supported and Sealed

  • DC Naked Cable is Less than 300mm

  • Inverter & Switch Clearance & Location

  • Inverter Setting & Display

  • MCB/ AC Isolator Rating & Grouping

  • AC Cable Size correct and Neutral Marked

  • AC VRC less than 2%

  • AC Conduit correctly Located, Supported & Sealed

  • Earth Cable Termination is tight & Correct & Soldered correctly

  • Labelling meets CEC and PV standards

Commercial Job Extra Check

  • Roof Exclusion Zone Barrier

  • Roof Skylight Cover

  • Roof Edge Protection installed correctly

  • Harness Anchor Points installed correctly & fall restraint compliant

  • Fuse for >2 Parallel Connections

  • Anti-Islanding Setting & Display

  • Restricted Access Setup

  • Note: Record any notes/issues not listed above

  • Overall Work Rating:

  • If at High risk, stop the work and inform the Installation Manager

  • Have corrective actions been assigned to installer with due date?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.